Benjamin VAN DEN BROUCK

COURBEVOIE

En résumé

(To be contacted on linkedin)
Focusing on project delivery on time, without hse events and with quality.

Project Management orientated (preference for EPCI contract in an Offshore Environment).

Able to manage the various parameters of a Project: Cost, Organization, Schedule, and Technical. Like to face challenging situation, working with a Team to achieve Human and Technical Project success.

Skills : Project Management, Offshore & Onshore Operations, Contract (Commercial, Legal, Insurance, Clarifications, Call for Bid, etc), HSE Management, Tidal challenges (Tidal environement, dedicated solutions, offshore drilling, etc)


Previously working in the Oil&Gas Industry, Offshore Construction Work

- SURF and Deep Water Project
- Installation Engineering
- Offshore installation experiences (shallow and deep water, anchored and DP);
- S-Lay & J-Lay;
- Heavy lifts;
- Subsea including WROV installation works;
- Maintenance and Repair
- Contract (Call For Tender dossier and follow-up with commercial/financial/legal/insurance aspects);
- AUDIT/Mob/Demob of vessels and various equipments;

- Trainings: Management of Change, Working at height, Permit To Work, HSES management, GSES, BOSIET,
- IT: MS Project, MS Office

Mes compétences :
Éolien
Éolien offshore
HSE
installation
Management
Manager
MBA
Microsoft Project
Offshore
Offshore operations
Subsea
Surf

Entreprises

  • Total - Project Advisor

    COURBEVOIE 2018 - maintenant TOTAL EXPLORATION & PRODUCTION, DSO/DW/PJT

    Project Advisor – North Platte (GoM) –03/2018 – Ongoing
    Conceptual design phase, management of Interfaces, Contractual Strategy & Planning
  • Total - RSES D - Site Manager

    COURBEVOIE 2016 - 2018 RSES D / COMPANY REPRESENTATIVE – 11/2016 – 03/2018
    Onboard SAIPEM 3000 / NORMAND MAXIMUS
    Installation of Foundations, Mooring lines, Single Hybrid Risers, Spools/Jumpers, Static & Dynamic umbilicals, etc

    In charge of HSE and Construction activities onboard Offshore Construction Vessels for EGINA Project
  • Total - Project Manager

    COURBEVOIE 2015 - 2016 SURF Technical Manager PBF/Zinia Phase 2 –02/2016 – 11/2016
    Final round, technical clarifications & cost opportunities

    Subsea Production Systems Category Management –02/2016 - 09/2016
    Part of Subsea Committee to define Total Subsea Vision, and orientation of main decisions regarding subsea topics including ongoing call for tenders.
    Absheron CFT leader on SPS Package.

    Project Manager – 11/2015 – 09/2016
    Support to Project Entity (Operated & Non Operated), also involved on Deep Water expertise within Total
    Participating to Subsea Emergency Response activities for Eruptive Wells.

    Key achievements:
    - Technical close-out of Zinia Ph2 Call For Tender
    - Contracting strategy for Absheron
    - Standardization of Subsea Production Systems
    - Subsea Emergency Response plan in case of subsea blow-out
  • Total - Head of Subsea Construction Department

    COURBEVOIE 2013 - 2015 Head of Subsea Construction Department - Angola –11/2013 –11/2015
    Management of:
    - 250/350M$ budget, 60 People Team
    - 4 x construction vessels & 1 x Air Diving spread, up to 14 ROVs fleet
    - Subsea maintenance & inspection operations for 4 x FPSOs, including Air Diving for UWILD inspection (replacing dry-dock requirement)
    - Fabrication & Installation of 25 well jumper per year, installation of associated Christmas Trees (XT)
    - Geographical Information System for the Affiliate, subsea metrologies

    Key achievements:
    - Safe & successful installation of a flexible well jumper (1st time in TEPA)
    - Successful AUV Campaign (Autonomous Underwater Vehicle),
    - Local content increase inside the Department (+48%)
    - Improvement of Offshore HSE standards
    - Budget reduction from 340M$ to 220M$ (-35%)
    - Mobilization of new vessels (Bourbon Evolution 805, SBM Installer)
  • Alstom Group - Marine Engineering Manager

    Saint Ouen 2011 - 2013 Offshore Wind - Tender Manager (Task Force) for Transportation & Installation, UK East Anglia Project - France, Nantes – 07/2013-11/2013
    Preparation and follow-up of the Call For Tender for Transportation/Installation/Logistic Hub and Operations &Maintenance scope of work on 100 x 6 MW Wind Turbine Generators, approx. budget 500M$

    Key achievements:
    - Coordination of 2 Team, Nantes (France) & Barcelona (Spain)
    - Offer compiled & delivered on time to Scottish Power Renewables / Vattenfall with the full package (EPCI)
    - Familiar with the Wind Turbine Generators installation manual, lifting tools and rigging, Offshore Contractors and jack-up markets.

    Marine Engineering Manager - France –10/2011-11/2013
    Setup of the Offshore Department, offshore strategy and prepare prototypes installation for Alstom.
    Development of the full offshore logistic worldwide in order to provide a low cost and reliable solution to install tidal device offshore and to connect them to the Grid onshore (new subsea connectors, subsea hub, dedicated installation vessel, Dynamic Positioning (DP) system & lifting equipment, port interface, hi-flow ROV, drilling & anchoring technologies in very hard seabed, power cable stabilization on seabed, etc).
    Definition and development of installation aids and methodology for tidal device, design orientation of the turbine and definition of the interface with seabed (including drilling systems).
    Confidential technical consulting for Tidal Generation Limited acquisition.
    Confidential Business & Technical consulting for Wave device (for potential final acquisition of AWS)


    Key achievements:
    - Creation of Offshore Department and associated expertise within Alstom
    - Definition of Offshore Strategy and critical partnerships.
    - Offshore turbine deployment and recovery, heavy lift (150mt) from quayside and towing to site.
    - Improvement of onshore & offshore operations.
    - In Canada, Port logistic investigations and development, including management of a 1200mt+600mt deadweights structure for erection and loadout onto installation vessel (only studies and site investigations, project finally cancelled at 50% progress for financial reasons).
  • Total - PAZFLOR SURF Installation Engineer

    COURBEVOIE 2008 - 2011 PAZFLOR Project, SURF Installation Engineer - France –09/2008-10/2011

    RSES / Offshore Site Manager on Pazflor Field onboard Acergy Legend during Long Base Line Array installations (Angola, Block 17) 7 weeks offshore campaign, with various mobilizations/load-out in Soyo
    Client Representative for mobilization in USA, loadout on heavy lift vessel (Reel = 350mt each, x3) 1 week and onboard Acergy Eagle for Subsea Separation Unit umbilical installation, 4 weeks offshore campaign

    SURF Installations Engineer,
    - Management & follow-up of two major offshore contractors, Technip & Subsea 7 for design & installation engineering on Umbilical, Riser and Flowlines installation scope of work, with various subcontractors all over the world (Norway, USA, Brazil, France, and Angola).
    - Validation of new installations equipment to be used on the project: Friction clamp for pipeplaying, Riser Pulling System (heavy lift winch safe Working Load 500mt), Inline pipeline structure Handling System (up to 150mt).
    - Project Leader for a 2” Hydrate Remediation Flexible.
    - Edition of various Technical Call For Bids.

    Key achievements:
    - Safe & efficient Long Base Line array campaign (Subsea positioning)
    - Succesful preparation & execution of SSU umbilical installation (4 sites, Norway, Brazil, US & Angola, 2 Contractors, FMC & Subsea 7, 1 Subcontractor Oceaneering)
    - No major issues experienced during Pazflor offshore campaign on SURF package
  • Technip - Contract Engineer & Operations Engineer

    Paris 2007 - 2008 MA-D6 phase 1 Project, Contract & Operations Engineer – France & India –07/2007-09/2008
    As Contract Engineer, responsible for the Survey, Supply Vessel and Logistic Agents (for the various European mobilizations/demobilizations as well as the operations in India) Contracts, from the Call For Bid phase to the execution of the contract, I was also involve in the AUDIT of the Supply Vessel and the Fabrication follow-up (new ship);
    As Operations Engineer, 3 x 5 weeks rotations offshore onboard CSO Constructor as Lead Project Engineer (Suction Piles installation approx.. 120mt each, Concrete Mattresses, pre-lay survey, ROV rescue operations). Client Representative onboard Greatship Anjali, Anchor Handling Tug DP 2. Onshore support also during Mob/Demob of various vessels in India & in Europe.

    Key achievements:
    - Subcontracts signed and under budget, supply vessel commissioned and delivered to Project as per schedule
    - Mobilization in due time, improvement of demobilization time for vessels
    - No incident during operations
    - On-demand technical support in India for new contracts and new requirements
  • Geocean - Night Shift Supervisor / Field Engineer

    2007 - 2007 OML123 Project (Addax), Field Engineer / Night Shift Supervisor – Nigeria – One rotation in June 2007
    Shallow water, anchored barge, installation of 14” prod. line (Manual Welding, X-Ray for NDT, Diving for Touch Down Point monitoring and laying inspection)

    Key achievements:
    - No incident, improvement of HSE standards onboard
    - AUDIT of the barge and pipe laying equipment, technical report with improvement proposals
  • Acergy - Field Engineer

    SAINT MAURICE 2006 - 2007 Field Engineer onboard Acergy Polaris during Erha North and Greater Plutonio projects, installation of the new J-Lay tower and also during major maintenance and repair phase.