  • SAIPEM / SAIBOS DIVISION - Deep Water Installation Engineer

    2009 - maintenant Kizomba Satellites Project - Angola Block 15 - ExxonMobil
    Lead Engineer in charge all the project Site Integration Tests (SIT)
    Main objectives:
    - preparation of internal SIT specifications
    - review and comment other contractor SIT procedures
    - participation to the SIT on site
  • SAIPEM / SAIBOS DIVISION - Deepwater Installation Engineer

    2005 - 2009 As part of the Deep Water Methods on Akpo Project, my work has consisted in preparing and developing the installation procedures of all the equipments related to the field control system (SYSTEM U) which comprised approximately 70km of steel tubes umbilicals, 11 bridge jumpers, 50 steel tube hydraulic flying leads, 147 electrical flying leads and 22 Subsea Umbilical Termination Foundation Bases.
    An important and very attractive part of the job was to be responsible of the interface with the umbilical vendor (NEXANS), the subsea equipment Contractor (CAMERON) and the FPSO Contractor (Technip-Hyundaï) ensuring that all the equipments are designed in order to be installed in a safe and efficient manner.
    From September 2008 to December 2008, participation to the Akpo installation campaign. My job consisted in supervising and coordinating the operation team onboard installation vessels for the installation of the equipments described above offshore Nigeria.
    My responsibility was to have those equipments properly installed.
    January - March 2009 – Production manifold recovery.
    March - May 2009 – FLET and Field Joint Coating Repair.
  • SAIPEM / SAIBOS DIVISION - Deep Water Installation Engineer

    2003 - 2005 As part of the Deep Water Method, I have worked on several bids, mainly on AKPO but also on ROSA-LIRIO, AGBAMI (OLT & SURF), GGP (Block 17), OKUME & OVENG TLP…
    The job consists of preparing the installation planning, procedures & drawings for the tender.
    The scope of work includes generally pipelines, umbilical & oil offloading line laying, moorings deployment & connection, SCRs & Oil loading buoy installation.
    My other tasks consist in performing some feed-back consolidation from different projects for the department, offshore operation timing analysis, preparation of typical installation sketch for the future tenders…

    February 2007 - ROSA PROJECT – TOTAL – Angola, Block 17
    Participation and assistance to the project team during the Production Umbilical Installation Campaign onboard the SAIPEM 3000.

    April 2004 - KIZOMBA B PROJECT – EXXON – Angola, Block 15
    Participation and assistance to the project team during the PiP SHR Installation Campaign onboard the SAIPEM FDS.
  • ITP INTERPIPE - Project Engineer

    2002 - 2002 Bonga Project - Nigeria - SHELL

    Design of an insulated pipeline installed with J-lay method.
    As a member of the project team, I was in charge of the thermal test procedure, the preparation of a part of the pumping system which permits to reduce the pressure in the annulus of the pipe in pipe.
    Also I have been involved in the next possible project Dalia in Angola for TOTAL and the development of a new insulation system in collaboration with Mac Dermott.
  • VINCI - Health and Safety Supervisor

    Rueil-Malmaison Cedex 2001 - 2001 Pochentong Internation Airport Construction - PHNOM PENH - CAMBODIA

    Health & Safety supervisor of the international airport construction.
    I was in charge of improving the health & safety environment of the workers and making the site secure.