Essilor
- Worldwide Supply Chain Director for Finished and Anti-Reflects Lenses at Essilor
Charenton-le-Pont2014 - maintenant
Essilor
- Europe Supply Chain Manager
Charenton-le-Pont2011 - 20142011-now Supply Chain Manager – Europe Paris France
(2 years +)
Manager of a 15 person team, remotely supervising 26 European entities
Forecasts managements from sales to replenishment (European sale : 1,6 Billion €)
New product introduction and obsolescence management
Responsibility and optimization of European inventories (50 million €, -20% in two years)
Load/Capacity management for European plants
Essilor
- Worldwide Logistics Project manager
Charenton-le-Pont2007 - 20112007-2011 Supply Chain Methods and Process Project Manager Worldwide
(4 years)
Perimeter: plants, continental DCs, local or Off-Shore Rx labs and subsidiaries in Asia, US and Europe
Definition and breaching conception of :
Production global strategies, optimizing production constraints and Supply Chain cost
Stock Sizing methodology redesign to allow significant optimization of inventory
Planification system challenge to enhance plants reactivity and changeovers costs (-50%)
Kea&Partners
- Senior Consultant
Malakoff2005 - 20072005-2007 Senior Consultant Paris, France
(2 years)
Sales Forecasts for Essilor International (from 60% of accuracy to 70%)
Target process and rules of convergence for European entities from three networks
Best Practice Book and common KPIs to prepare the implementation collaborative tool
Re-engineering of Supply Chain process for a multi site and multi country SME working for retail
Sales, production and logistic plan analysis
Review of the backbone processes and their articulation
Challenge of the organizationial statu quo
Valtech-Axelboss
- Senior Consultant
2002 - 20052002-2005 Senior Consultant Paris, France
(3 years)
Industrial performance for a food processing industry company (productivity +25%, workforce -15%)
Productivity analysis, bottlenecks identification and investment opportunities definition
Job description, polyvalence development and new organization implementation
Purchasing policy for a retail company (Stock -40%, cost -20%, shortage -10%)
Rationalization of products portfolio
Mapping of all suppliers with analysis on sales and constraints, renegotiation of SLAs and optimization of purchasing frequencies
Logistic Plan for an agro-industrial company (from 4 owned warehouses to two rented ones)
Analysis of productions and sales volumes and locations, logistics flows, storage and transportation
European consensus on the project, termination of the existing logistic contracts, constitution of the logistic specification (transportation and storage, service and cost)
Sport4fun
- Production Manager
2000 - 20012000-2001 Production manager Paris, France
(19 months)
Set-up of a 5 people team to manage events, awards and customer relationship management