Euro Petroleum Consultants
- Vice President
2015 - maintenant
Project Business development in Asia
Function Vice President
Tasks
* Promote the image of EPC and the Consulting Activities in the regions, according to the guidelines and instructions of EPC relating to EPC Consulting Activities.
* Identify all projects, at their earliest stage in the regions, which could involve Consulting Activities and shall convey to EPC all available information relating to such projects.
* Follow up on Proposals in the most appropriate manner with a view to successful results.
* Make all necessary arrangements and provide all reasonable assistance to EPC for all administrative steps in connection with Proposal in the region, such as, but not limited to, taxation matters, obtaining visas, customs and tax clearances, reservations of accommodation, arrangements for business appointments, that EPC may think suitable at any stage of the Proposal.
* Provide all reasonable assistance Follow up on the processing of EPC' relevant invoices with EPC Clients relevant departments.
* Prepare a detailed monthly report and timesheet on all ongoing consulting activities. ;
-
Euro Petroleum Consultants
- PMC Coordinator
2014 - maintenant
SONARA extension project
-
Euro Petroleum Consultants Ltd
- Construction manager
2011 - 2014
Refinery extension project
vacuum distillation.
Revamping.
Storage.
-
Euro Petroleum Consultants
- Manager & project coordinator
2011 - 2015
Company Euro Petroleum Consultants Lieu : Cameroon
Project SONARA Refinery extension project phase 1
Function PMC Construction manager/ project coordinator
Tasks * ~ 300M EUR project - ~1200 project staff
* Construction ;
* Managing the Project management teams with multi-discipline refinery staff and PMC experts ;
* Lead the construction supervision team
* Contract management
* Cost control management. ;
* Verification and validation of machinery and construction contract commercial and technical Bid evaluation
* Verification and validation of project invoices for SONARA.(client)
* Interface between SONARA and general project co-contractor
* Administration ;
* Preparation of monthly project progress report. ;
* Leading the weekly and monthly progress meeting. ;
* Leading the Quality and HSE meeting.
Results Project management team organization.
Client project cost control organization
Construction design challenge for value engineering
Tools MS power point, MS Project, Primavera, excel
-
Aquality
- Engineering manager
2010 - 2010
Project Water treatment plan
Function Engineering manager for the Bid phase
Tasks * Engineering consultant contract management ;
* Engineering cost estimation and negotiations ;
* Drafting of the Contract of Engineering consultant (WP) ;
* Bid planning and Project planning
* Deliverables ;
* Definition and finalization of the deliverable list for the Bid and execution phase
* Engineering teams ;
* Preparation of the engineering team resource requirement including job profile for each position.
Results 6M AU$ save in the contract negotiation due to tied and detail preparation of deliverable list.
Tools MS power point, MS Project, Primavera, excel
-
Degremont
- Engineering manager
Paris La Défense
2010 - 2010
Engineering consultant contract management
o Engineering cost estimation and negotiations
o Drafting of the Contract of Engineering consultant (WP)
o Bid planning and Project planning
Deliverables
o Definition and finalization of the deliverable list for the Bid and execution phase
Engineering teams
o Preparation of the engineering team resource requirement including job profile for each position.
-
EPC Consult
- Director
2009 - 2010
Project Consulting
Function Director
Tasks * High raise steel building project profile ;
* Selection of design and construction firms ;
* Introduction of dry wall system in civil construction market.
* Developing tourism project. (Asian Trek Discovery Ltd)
Results 25 storied steel building project profile completed
ATD in operation
Tools MS power point, MS Project, excel AUTOCAD
-
EPC Consult
- Directeur
2009 - 2010
High raise steel building project profile
Selection of design and construction firms
Introduction of dry wall system in civil construction market.
Developing tourism project. (Asian Trek Discovery Ltd)
-
SNF Floerger
- Project Manager
2006 - 2009
Project Marmul Polymer Flooding Project- PDO (SHELL)
Function Project Manager
Tasks From the Detail Design, procurement, construction to Pre-commisioning stage I was in charge of the project management in Oman. The project of 160M$ included:
Water treatment plan of 80 000m3/d (IGF and HDBF system)
Polymer injection plan with polymer silos, polymer slicing unit, maturation tanks and 30 injection pumps.
75 km of flow lines connected to 27 injection wells.
* FEED in France
* Main Contract drafting and project planning ;
* Engineering consultant contract drafting and negotiation. ;
* Construction contract drafting and negotiation. ;
* Lead the Piping and civil engineering package ;
* HSE plan and QA plan
* Engineering Phase at Muscat
* Leading the French engineering teams
* Mechanical engineering
* Process engineering
* Civil engineering
* Electrical/instrumentation engineering ;
* Piping engineering
* HSE management
* Quality management
* Project control teams
* First SNF representative to PDO
* Procurement
* Leading the Procurement management team
* Suppliers Bid selection
* Inspections and FAT
* Construction
* HSE general management
* QA/QC general management ;
* 650 to 1000 work force mobilized at site during 22 months ;
* Camps and project facilities construction supervision ;
* Civil work contractors' management. (8000 m3 of concrete) ;
* Civil work supervision ;
* Equipment erection /fabrication supervision. ;
* Piping and pipeline supervision (75km of pipeline) ;
* Electricity and instrumentation supervision ;
* Pre-commissioning
* Win Pcs implementation
* Pre-commissioning general management
Results Project delivered and in operation
Tools MS power point, Primavera, MS Project, excel AUTOCAD
-
SNF Floerger
- Project Manager
2006 - 2009
Project manager of Marmul Polymer Flooding Project.
From the Detail Design, procurement, construction to Pre-commisioning stage I was in charge of the project management in Oman. The project of 160M$ included:
Water treatment plan of 80 000m3/d (IGF and HDBF system)
Polymer injection plan with polymer silos, polymer slicing unit, maturation tanks and 30 injection pumps.
75 km of flow lines connected to 27 injection wells.
-
SAUDI OGER
- Directeur des corps technique secondaire
Riyadh
2005 - 2006
Responsible for 4 departments (HVAC, HCU,LCU, Plumber) for the all construction project of the royal family. Administrative, technical and financial management. 1000 employees. Organization of the follow-ups, optimization of the coordination of the departments, definition of intervention procedures and follow-ups of the tasks. Hygiene and safety at work.
-
SAUDI OGER
- HEAD SERVICE MANAGER
Riyadh
2004 - 2006
Project ELECTRICAL, PLUMBING, HVAC, LOW CURENT DEPARTEMENT
Function HEAD SERVICE MANAGER
Tasks * Responsible for 4 departments (HVAC, High current, Low current, Plumbing) for the all construction project. (1600 staff)
* Reporting to the top management. ;
* Organization of the follow-ups, optimization of the coordination of the departments ;
* HSE plan development and implementation ;
* Introduction to the ISO 9001
Results * Optimization and centralization of the material management
* HSE plan development and implementation
Tools MS power point, MS Project, excel
-
Fisher Ship Yard
- Project manager
2002 - 2004
Project Yacht and ship building project
Function Project manager
Tasks New activity of Ship construction start up in the Ship yard
* Construction yard development ;
* Lofting and fabrication training.
* Carpentry yard and training ;
* Planning and project profile ;
* Leading the deep sea fishing trawler engineering team
Results * 45 ft patrol boat for Bangladesh navy
* 42 ft passenger boat ;
* Completion of pilot project of leisure boat design, construction and exportation to Europe
Tools MS power point, MS Project, excel , AUTOCAD
-
Fraciab
- Director Instrumentation
2001 - 2002
Project Sajahal paper mills power plan
Function Director Instrumentation and control
Tasks * I am in charge of the engineering procurement and installation for Instrumentation, tripping controls for Boiler, turbine and generator management system.
* Second hand, steam power plant with 85T-gas boiler. ;
* SOGET steam turbine 4MW
* ALSTOM generator 5.5KV.
Results * Plan in operation
Tools MS power point, MS Project, excel , AUTOCAD
-
TRIMOD
- Executive Director
2000 - 2001
Project Sweater and Buying house management
Function Executive Director
Tasks During the absence of the Managing director, I am in charge for one year of the management of:
* A sweaters factory with 600 employees. ;
* Managing the Buying house and handling the sample campaign of the 2002 winter season.
Results * Succeed the 2002 winter season and hand over back the management to the MD
Tools MS power point, MS Project, excel
-
ZAMIL STEEL
- Construction Director
1999 - 2000
Project Pre-engineered steel building erection
Function Construction Director
Tasks * Management and supervision for the construction of pre-engineering building.
* Mobilization of local contractors ;
* Construction sites follow-up ;
* Technical adviser for local erection companies.
Results * 15 building erected in 6 months in garments sector in Bangladesh
Tools MS power point, MS Project, excel
-
AREL Ingenierie
- Construction Director
1994 - 1999
Project Jute Line Improvement Project at Sylhet Pulp and Paper Mills
Function Construction Director
Tasks Management in Bangladesh of the Jute Line improvement Project at Sylhet Pulp and Paper mills (8M$).
* Selection and contracting to local civil construction companies the piling and building construction package.
* Selection and contracting to local Mechanical, piping, electrical construction companies the plant construction packages
* Construction supervision
* HSE general management
* QA/QC general management ;
* 120 to 300 work force mobilized at site during 17 months
* Civil work contractors' management. (1000 m3 of concrete)
* Civil work supervision ;
* Equipment erection /fabrication supervision. ;
* Piping supervision ;
* Electricity and instrumentation supervision
* , pre-commissioning and commissioning management
Results * Erection completion certificate
* Project completion certificate ;
* Company claim submission to client for 1M$ (0.5M$ succeed)
Tools MS power point, MS Project, excel
-
PROVAL
- Maintenance Manager
1991 - 1994
Description: Frozen food factory PICARD products and others