Paul BOILEAU

Beynes

En résumé

Petroleum Engineer

Mes compétences :
Management
Management projet
Oil and gas
Performance

Entreprises

  • STORENGY - Project engineer

    Beynes 2016 - maintenant Project engineer on Stublach project, phase 2: upgrade of a gas storage site. 10 new wells with associated cavity conversion (salt caverns) and Gas Processing Plant upgrade (compression, dehydration, utilities).

    400MMm3 of storage capacity expected after full commissioning (2020)
  • EFOR - Supplier Quality Inspector - Contract for GE Steam Power System

    Champagne-au-Mont-d'Or 2016 - 2016 On duty to inspect manufactured equipment for a coal fired power plant project.

    Across all Europe, in charge to inspect Pumps, valves, transformers, turbines - in line with GE spécifications
  • GDF SUEZ E&P UK - Project engineer (apprenticeship IFP School)

    2015 - 2016 Cygnus project: Hook-up & Commissioning of an offshore gas platform complex in north sea ; 2 well head platforms, 1 production platform and 1 living quarter (target: 250 MMscfd). Within engineering, in charge to support offshore team (technical queries & as-built coordination with all disciplines). Support HU&C team to speed-up functionnal system handover to operation.
  • GDF SUEZ E&P International - Petroleum Architect (apprenticeship IFP School)

    2015 - 2015 In the frame of a LNG project in pre-FEED phase. Control of the OPEX / CAPEX of the upstream gas producer (5 producers spread-over 20 licenses). Alternatives solution for concept define. Risk analysis and economical model of the project. Deliverables to support FID decision.
  • TOTAL E&P Indonésie - Production engineer (Engineering degree Internship)

    COURBEVOIE 2013 - 2014 Integrated within well performance team, working on artificial lift method: Gas lift plus Foam activation for brown fields. First step is to prepare a model in order to prove the reliability and the economy of that innovative brown field artificial lift. Purpose of the model is also to figure the potential gain of production after application of the artificial lift.
    Second step is to prépare the transfer of Foam Assisted Lift technology from Gas (TUNU field) to Oil well (HANDIL field).
  • Vinci Construction Grands Projets - Production Engineer (internship - gap year)

    Rueil-Malmaison Cedex 2013 - 2013 Hallandsås project (railway tunnels in Sweden, TBM excavation for the main tunnel, 18km spread over two tunnels, 10.6 m diameter). In charge of the preparation of dismantling tunnel equipment (steel bracing, industrial pumps, DN 18 networks '' [...]), and industrial site (concrete plant, water treatment plant), in terms of schedule, budget, methods. Coordination dismantling / best work. Annex, production monitoring.
  • Direction TP Hydraulique Sud Ouest Vinci Construction France - Methods engineer (internship - gap year)

    2012 - 2012 Deploying a handbook site preparation. Establishment of a pilot site and application of processes
    across all subsidiaries in Aquitaine, France. Integration of the handbook in quality procedures, in
    light of certifications ISO9001, ISO14001 and MASE-UIC.
  • Veolia Water - Site manager assistant (Internship)

    Paris 2011 - 2011 On a directional drilling site (1.5 km) Keeping a budget site, Help the execution
    methods, coordination of teams, ensures compliance with safety regulations.
  • SADE Bordeaux - Ouvrier canalisateur

    2010 - 2010 Ouvrier canalisateur : Pose de canalisation en eau potable et assainissement, dans le cadre d 'un stage ouvrier
  • Clinique St. Martin - Brancardier

    2008 - 2008 Brancardier durant l'été 2009.
  • Mc donald's - Cuisinier

    guyancourt 2007 - 2007 Équipier durant 2 mois, cuisine et caisses.
  • Château les giraudels de milon - Ouvrier agricole

    2006 - 2006 Vendanges vertes