Polyvalent engineer, ambitious, with experience in the design, supervision, planning and cost cotrole having acquired knowledge in project management by the EVM methods, which are summarized as follows:

-Planning, cost's Estimation;
-Budgeting / Forecasting ;
-Monitoring And Control;
-Varriance and performance;
-trends ;
-PRIMAVERA P6(Advanced);
-MS-PROJECT(Medium).

-Opting for a Career in project management in the sector of industry or oil & gas.

Mes compétences :
Microsoft Office
Planning stratégique
Project controle
Calcul de structure
PRIMAVERA P6
Monitoring
Reporting
Budgeting
Microsoft Project
KPI & Dashboards
Contrôle des coûts
Erned Value management
Project Management
Planning

Entreprises

  • Rheinmetall international engineering GmbH - Project Control engineer

    2015 - maintenant Sector : Military plant
    Project : Construction of military armored vehicles plant FUCHS 2

    -Development of the EPC Base Line Schedule using Planning Software PRIMAVERA P6;
    -Issue the Planning & Scheduling Procedure and the Progress Measurement Procedure with subcontractors;
    - Estimate the resources requirement and the development of resources planning (manpower/equipment/material);
    - Generation of Project Budget by taking into account the direct cost and Indirect cost incurred in the project.;
    - Analysis of critical path, Set-up of progress measurement system and schedule follow-up in coordination with Project Control Manager;
    - Monitoring of detailed schedules and look-ahead (Weekly, Monthly and Quarterly) for various project phases;
    - Analysis and approval of various subcontractors, partners, vendors, schedules and coordinate their interventions ;
    - Different progress reports (daily, weekly, monthly, S-Curve);
    - Updating of the project EPC master schedule and ensure compliance with contractual deadlines;
    - Revision of the Project Initial Budget;
    - Preparation and updating of project cash flow ;
    - Organize and Animate site meetings with stakeholders;
  • INERGA Filliale du groupe SONELGAZ - Planning and cost engineer

    2014 - 2015 Sector : energetic Infrastrucutres
    Project : Combined cycle power plant (1200MW)


    Main tasks :

    -Development of project's master schedule (WBS LEVEL1-2);
    -Estimate the resources needed and their costs and the development of resources planning (manpower / equipment / materials);
    -Development and update of the forecast budget (BAC);
    -Development of detailed planning of works (WBS LEVEL-3-4-5 ...);
    -Preparation and updating of project cash flow;
    -Analyze variances (SV/CV) and performances (CPI/SPI) between the planned and actual in "time / cost"​ with determining trends (EAC/ETC) and provide corrective solutions;
    -Prepare various reports (weekly, monthly, progress,histograms and S-CURVE, Quarterly update ...... Etc) with different stakeholders;
    -Assist site managers in achieving the target in different construction phases
    -Ensuring project manager's interim on several occasions;
    -Participate in the implementation of a database for use by futur projects.
  • Cosider - Construction supervisor

    Alger 2013 - 2014 Sector : Building.
    Project :Construction of 300 housing.

    Main tasks :
    -Technical monitoring work ;
    -Preparation of weekly and monthly progress reports;
    -Manage and track subcontractor;
    -Preparation of instalation of site plan
    -Organize and Animate site meetings with stakeholders;
    -Monitor the various workshop at the site.
  • BET LECACT - Design engineer

    2013 - 2013 Main tasks :
    -Development of design calculations for different types of engineering structures;
    -Design execution plans;
    -Develop specifications;