- Contributed in engineering phase of project development FEED and EPC (Detail Design) as consultant
-Acted as manager and head of discipline (Instrumentation) in plant construction (gas and crude oil stabilization plant), Installation and Pre-Commissioning activities.
- Acting as member of engineering team in the phase of plant commissioning, and Start-up,
- Contributed to improve Operation and Maintenance procedures after hand over from EPC Contractor.
- Contributed in Risk Assessment, HAZID, HAZOP, SIL, as consultant
- Deep experience and skills in ICSS systems in general and specially Honeywell DCS (Experion PKS R410) and ESD, FGS, WHCP, RTU, (Safety Manager R152), achieving the installation, the functional tests and the modifications as a lead of instrumentation and control system.
- Deep experience in building management system BMS (Honeywell, Johnson controls), contributed in control systems installation as supervisor
- Experience in telecom Radio HF, VHF, and telecom system SDH multiplexer and fiber optic

Entreprises

  • touatgaz (sonatrach -Engie) - Senior instrument and control system engineer

    2017 - maintenant - Contributed to improve preparations of documents and procedures of operation and maintenance in order to be ready after startup such as maintenance procedures and job plan of instruments , control system and PLCs
    - Acting as a skilled engineer to review all OPMs and VDLs to cover any omissions or errors
    - Review of control philosophy, P&I diagrams, cause & effect diagrams, instruments I/O list, Preparing master data sheet for PMs schedule; ensuring safe and efficient performing of CMs
    - Acting as technical reference for the instrument team to check Spares balance investigation and inventory control for all instrument’s spare parts
  • OC BMS(Sonatrach-Cepsa-Petronas) - Construction Manager

    2014 - 2015 - Tracking construction progress and comparing to planned construction schedule
    and trying to minimize the gap with establishing a trust dialog with contractor
    - Managing construction budgets
    - Internal daily meeting with supervisors to discuss progress and constrains
    - Weekly meeting with the main contractor to discuss progress and construction schedule in order to ameliorate the ratio
    - Monthly meeting with top management to expose and clarify any confusion in construction status
    - Managing all pre-check and tests of instruments , and rotating machines
    - Managing all NDTs tests with highly involved to comply with safety requirements and national legislations
    - Managing material and human resources involved in construction
    - Highly conscious about safety by giving to safety team all the rights to stop works at any time if they found that is dangerous
    - Installation of rewards system to encourage workers to adhere and accept safety culture

  • OC.BMS(Sonatrach-Cepsa-Petronas) - Lead Instrumentation and Control

    2013 - 2014 - Checking and tracking Master Schedule for construction and instrument and control system installation
    - Performed pre-inspection such as : ITP ,ITR ,for ESDV,SDV , and control valves
    - Performed Inspections and calibration (LT, PT, TT, Displacer LT, Control valve, Etc.).
    - Performed ICSS SAT (Honeywell Experion PKS and clear Punch lists
    - Tracking progress Instrument Erection and managing the non-conformities
    - Elaborate daily, weekly and monthly report and look ahead activities.
    - Achieving loop tests and configuration of DCS loops
    - Performed loop check for DCS, ESD, FGS, packages systems loops.
    - Involved in DCS,ESD, FGS and Package systems site acceptance test (SAT)
    - Ensuring Punch list point follow up with system vendor for completeness of the system activity before plant start up.
    - Ensuring After functional check supporting operation to smooth and safe plant start up.

    - Explaining operation staff for major equipment interlocks like heaters, boilers, compressors etc.,
    - Ensuring that as-built drawings are prepared and maintained completed project files including all loop drawings, updated interlock and logic drawings.
    - Ensure that before any intervention safety requirement is respected by the team
    - Make sure that Toolbox talk made before any intervention.


  • OC BMS( SONATRACH-HESS-PETRONAS) - Consultant instrumentation and control

    2011 - 2012 - Involved in HAZID, HAZOP, SIL, SRS,RAM ,LOPA, Package HAZOP studies
    - Review and approval Cause & Effect Matrix, 3DModel, and engineering docs in accordance with standards and project specifications
    - Review and comment narrative process control and shutdown philosophy documents.
    - Review and finalize with EPC contractor the control system architecture
    - Technical bid analysis for ICSS( DCS,ESD,FGS) systems
    - Review and approval of system detailed engineering drawings.
    - Actively involved in system Installation and configuration with system vendor.
    - Involved in safety reviews, process hazardous analysis, and ensure safe and cost effective design in compliance with applicable codes and standards and project specification.
    - Review and approval construction contractors detailed scope of work and work pack.
    - Review and approval of Basic engineering documents.
    - Review and approval of P&IDs and drawings
    - Review and approval of Instrument database and datasheets.
    - Review and approval of Specification for Control and Shutdown systems.
    - Review and approval of ICSS I/O database.
    - Review and approval Sizing of Orifices, and other Flow Elements
    - Review and approval Sizing of Relief valves and Control Valves.
    - Attended FATs for DCS/ESD /PLC/Control panels and systems.
    - Review and approval Vendor document
  • SONAHESS( SONATRACH-HESS) - Instrument engineer

    2010 - 2011 - Achieving Installation, calibration and loop checking of the field instruments (Emerson Rosemount, ABB, Endress & Hauser, Bently Nevada, Honeywell, Yokogawa,)
    - Performed Maintenance and calibration of the control valves (Pneumatic, Part turn, MOV,) of Flowserve, Valtek, Masoneilan,
    - Achieving flowmeters configuring (electromagnetic, orifice plate, ultrasonic, turbine, variable area) of ABB, Rosemount, Krohne ...
    - Designing, Implementing and Commissioning of new control loops as per site requirements.
    - Troubleshooting of the communication of third party devices like ESD (triconex) system, package PLCs, Vibration monitoring system with DCS (Emerson DeltaV).
    - Re-Configuration of DCS loops after modification or change.
    - Loop check for DCS,ESD,package systems loops after any modification or troubleshooting
    - Involved in preparation of safety Interlock checking procedure
    - Performed Checking of safety interlocks, plant complex loops in co-ordination with operation team
    - Supervision of instrument and control system, maintenance activities.
    - Testing and Commissioning Fiber Optic network system.
    - Identifying critical instrumentation and control system spares for procurement.
    - Applying safety requirement before any intervention by following company’s safety procedures
  • Sonatrch Direction generale ACT DGS - Process engineer

    2007 - 2010 - Recovery monthly reports from projects development and assistance of project team to deal with authority’s authorizations and permits
    - Tracking project progress and made a dashboard for management
  • B&R-C( Sonatrach-KBR) - Supervisor

    2003 - 2007 - Supervises installation of control systems (Building Management System, GTC (Johnson controls), CCTV, Fire Detection systems, LAN Network,).
    - Performed commissioning and Start-up activities.
    - Supervises cables pulling , loop check of instruments and calibration,
    - Performed inspections and tests of controllers.
    - Elaborates daily and weekly report for management
  • Laboratoire des Travaux Publics Est/ travaux publics - Metrologist

    2001 - 2003 Calibration,Maintenance

Formations

Pas de formation renseignée

Réseau

Annuaire des membres :