  • Subsea 7 - Project engineer

    SURESNES 2010 - maintenant West Nile Delta GFR project (Suresnes office) - On-going:
    - Rigid Flowline installation analysis (Shore pull, Shallow water normal lay)

    Lianzi project (Suresnes office) - 1.5 years:
    - Package follow-up (Flexible jumpers/riser supplier /Technip/)
    - Risers interference analysis
    - Flexible in-place analysis
    - Flexible route verification

    Erha North Phase 2 project (Suresnes Office) - 6 months:
    - Interface engineer (manage engineering interfaces between Lagos office, Sutton office, Lisbon office and Suresnes office)

    CLOV project (Suresnes Office, 3 trips to Lobito, Angola) - 2.5 years:
    - Riser tower Global validation extreme analyses (2 riser towers)
    - Riser tower Global validation interference analyses
    - Buoyancy tank towing analyses (towing surface/subsurface)
    - Fabrication analyses (support analyses for specific operations on Lobito Yard linked to tower launching in the bay)
    - Packages follow-up (Flexible joint supplier /Techlam/ and Riser monitoring system supplier /BMT/)
  • Saipem - Apprentice

    Montigny-le-Bretonneux 2009 - 2010 Third year of ENSIETA as apprentice at Saipem.

    Worked in the Naval team:
    - RAOs improvement of the S3000
    - Miscellaneous RAOs approval to DNV for other installation ships

    Software used: Diodore, Moses.
  • Saipem - Trainee

    Montigny-le-Bretonneux 2008 - 2009 Gap year placement at Saipem.

    Worked in the Naval team:
    - Packages deployment study
    - Mooring Calculations
    - Pipe Line fatigue calculation

    Software used: Orcaflex, Deeplines, Ariane, Diodore.