Subsea 7
- Project engineer
SURESNES
2010 - maintenant
West Nile Delta GFR project (Suresnes office) - On-going:
- Rigid Flowline installation analysis (Shore pull, Shallow water normal lay)
Lianzi project (Suresnes office) - 1.5 years:
- Package follow-up (Flexible jumpers/riser supplier /Technip/)
- Risers interference analysis
- Flexible in-place analysis
- Flexible route verification
Erha North Phase 2 project (Suresnes Office) - 6 months:
- Interface engineer (manage engineering interfaces between Lagos office, Sutton office, Lisbon office and Suresnes office)
CLOV project (Suresnes Office, 3 trips to Lobito, Angola) - 2.5 years:
- Riser tower Global validation extreme analyses (2 riser towers)
- Riser tower Global validation interference analyses
- Buoyancy tank towing analyses (towing surface/subsurface)
- Fabrication analyses (support analyses for specific operations on Lobito Yard linked to tower launching in the bay)
- Packages follow-up (Flexible joint supplier /Techlam/ and Riser monitoring system supplier /BMT/)
-
Saipem
- Apprentice
Montigny-le-Bretonneux
2009 - 2010
Third year of ENSIETA as apprentice at Saipem.
Worked in the Naval team:
- RAOs improvement of the S3000
- Miscellaneous RAOs approval to DNV for other installation ships
Software used: Diodore, Moses.
-
Saipem
- Trainee
Montigny-le-Bretonneux
2008 - 2009
Gap year placement at Saipem.
Worked in the Naval team:
- Packages deployment study
- Mooring Calculations
- Pipe Line fatigue calculation
Software used: Orcaflex, Deeplines, Ariane, Diodore.