-
Saipem
Montigny-le-Bretonneux
maintenant
-
Saipem
Montigny-le-Bretonneux
maintenant
-
ENI Saipem sa
- Field Engineer
2007 - maintenant
Field Engineer onboard construction vessels on Deep and Shallow water projects:
FDS, Ultra Deep water field development ship
SEMAC I, Semi-Submersible Lay Barge
S355, Derrick Lay Barge
Assist Vessel SuperIntendent in technical matter
Responsible and coordinator of projects quality control
Responsible of project materials
Responsible and coordinator for deck layout and vessel configuration changes along the different project phases
AKPO UFR GEL Mobilization Congo, FDS Client: TOTAL
Firing Line upgrade & as-built, Analysis SW GEL campaign with S355, Budget Subcontractors, Documentation, Material request
AKPO UFR GEL DW Campaign Nigeria, FDS Client: TOTAL
16’’ flowline of over 85 km from 190 to 1300m WD- Pre-lay & As-built survey - ROV operations - PLG/PPMS
BURULLUS WDDM Phase IV Project Egypte, FDS Client: BURULLUS Gas Company
7 x 10’’ ¾ flowlines for a total of 65km from 330 m to 780 WD
7 x initiation PLET & 7 x abandonment PLET with Hydraulic Triplate
14 x 10’’ Jumpers installation & 1 x 20’’ Jumper removal with CVC tool
4 UTA Mudmat installation
2 x 20’’ hard pressure caps removal & 1 x 10’’ soft pressure cap installation - ROV operations
Wenchang/Weizhou/Ledong Projects China, SEMAC I Client: China National Offshore Oil Corporation
16” gas pipeline of over 1.9 km & 10’’ of over 25.1 km between production platforms from 10 to 100m WD
12” x 8” gas pipeline of over 3.4 km & 14” x 10” of over 34.2km between production platforms- ROV & diving operations
Ministinger Study & construction for angle modification
Taichung-Tunghsiao-Tatan Project Taiwan, SEMAC I Client: Chinese Petroleum Corporation
36” x 40 Kms of Gas pipeline within pre-dredged trenches and over grout mattresses, cable crossings and pipeline Crossing
3 Above Water Tie-in at 25 meters WD
Concrete mattresses, Grout bags & Buoyancy tanks installation - ROV & Diving operations
SEMAC I Dry Dock Singapour, SEMAC I Client: SAIPEM
Firing line upgrade, Superstructure modification, Cranes structural modification and Accommodation modification
Transversal Projects, Paris
IT: Daily Progress Report software implementation on Saipem fleet, FDS Firing Line productivity software prediction
R&D: AUT at high temp, HiLo Measurement tool, Cooling tool for welding system
Quality: Implementation worldwide Lessons learnt software
-
Saint-Gobain
- Responsable élaboration du verre
Courbevoie
2005 - 2006
Responsable des ateliers composition et four dans une usine de verre plat à Aniche
Travaux lourds d’entretien du four, 1M€ : placage de la cuve et soudure céramique. Organisation des équipes internationales, contact et négociation avec les sociétés spécialisées, planification et réalisation des opérations
Construction d’une installation de transfert pneumatique de matières premières, 200 k€.
Encadrement du personnel 20 personnes, mise en place de la méthode de travail 5S, optimisation et développement du process par différents investissements.
-
Saint-gobain
- Responsable atelier equarri
Courbevoie
2004 - 2005
Responsable de l’atelier équarri en avril (découpe et stockage du verre) à Thourotte
Encadrement du personnel 30 personnes, planification de la production, optimisation et développement des installations : achat de nouveaux appareils de découpe, achat de mesureur de dimension en ligne, mise en place de la méthode de travail 5S, projet avec l’aide d’un stagiaire d’optimisation du traitement du verre.
-
Saint-Gobain
- Ingénieur développement
Courbevoie
2003 - 2004
Adjoint au responsable fabrication dans une usine de verre plat (formage et exploitation du verre) à Thourotte
Projet de réduction des émissions atmosphériques polluantes, mise en place d’une méthodologie usine pour appliquer la norme ISO 9001, projet d’utilisation d’une nouvelle couche semi réfléchissante, responsable maintenance des engins usine.