Menu

Stephane CARLIER

Clichy

En résumé

Mechanical Engineer at BIC, Lighter Manufacturer

Main Missions:
- support the production manager
- improve the production organization, efficiency, productivity

Mes compétences :
AutoCAD
Lean management
Catia v5
Qualité
Manufacturing
Gestion de la qualité
Logistique

Entreprises

  • Bic - Mechanical Engineer

    Clichy 2016 - maintenant BIC (Nantong) Plastic Products Co.Ltd, lighter manufacturer, which focuses on providing high quality products available to all consumers. Bic company produces 5 million lighters every day all among the world which makes it the biggest lighter manufacturer.
    My main missions are relative to support the production manager on the assembly machines besides that I also work on projects to improve the organization, efficiency and productivity.
    By working in production I obtain the chance to work on the field in a multicultural atmosphere which requires me to use my Chinese, English and French flexibly.
  • Cartolux Suzhou - Project Engineer

    2016 - 2016 Project Engineer in a French packaging company in China

    Main missions:
    - improve the organization, efficiency and productivity
    - support French and Chinese team on new industrial projects
    - be responsible for sealing machine activities in China
  • Leroy Somer (Groupe EMERSON) - ME (Mechanical Engineer)

    Angouleme 2014 - 2016 Working in project to validate a Franco-Chinese Master Degree
    Work supported and to be validated by Mr Zhenghua Qian, NUAA professor
    21 months (starting 14/06)
    In China, Fuzhou

    Global arrangement for production line from LSA40-443.(21 months)

    Guider: Daisy Guo

    Work content:
    - Understand rotor process (2 weeks)
    - Understand stator process (2 weeks)
    - Understand VPI process (1 week)
    - Understand Assembly process (2 weeks)
    - Summarize the current manpower arrangement and calculate the efficiency and line balance rate (1-2 months)
    - Action analysis for bottle neck stations (1-3 months)
    - Calculate max capacity based on current layout and equipment (2-4 weeks)
    - Create new manpower arrangement for different capacity requested (3 month)
    - Create proposals for capacity increase and implement (3-6 months)
    - Create proposals for WIP reduction and lead time reduction. (3-6 months)
    - Cooperate with other engineer for the continuous improvement projects
  • Dassault Systemes - Internship

    Vélizy-Villacoublay 2012 - 2013 Nanjing University Science and Technology
    Assess Dassault system 3D modelisation tool, using a virtual factory with 10 universities around the world:
    • Self-training and test Dassault System simulation tools
    • Actively participate to project meeting to solve issues on using Dassault software and on project improvement
  • DEDIENNE AUTOMOTIV - Intern in quality production department

    2011 - 2011 Manufacturer of plastic pieces for the automotive aspects
    Optimization of manufacturing controls in collaboration with control operators, production and quality managers. Result: 10% saving on time spent by controller.
    • Quantification of time spent by controllers on 3D machines
    • Search of optimized solutions and validate them
    • Development of performance indicators and controller training

Formations

  • Nanjing University Of Aeronautics And Astronautics ( NUAA ) (Nanjing)

    Nanjing 2014 - 2016 Master Degree

    Student at NUAA, Aviation and Aerospace Engineering - Nanjing University of Aeronautics and Astronautics
  • Ecole Nationale D'Ingénieurs De Metz (ENIM)

    Metz 2009 - 2016 Engineer diploma

    Main courses: Mathematics, Dynamics, Mechanical Designing, Fluids Mechanicals, Cutting Process, Logistics, Supply Chain, Thermodynamics, Quality, Steel Treatment
Annuaire des membres :