Total E&P
- Commissioning Manager
COURBEVOIE
2016 - maintenant
Management of Commissioning activities from Commissioning Engineering up to start up.
Budget: 56 M euros.
Commissioning team composed by:
- Integrated commissioning team by 56 engineers and supervisors with 50% of Company employees and 50% EPSCC contractor employees.
- E&I commissioning specialist sub contractor: 380 persons
- HVAC commissioning specialist sub contractor: 180 persons
- Mechanical commissioning specialist sub contractor: 160 persons
- Leak test sub contractor
- Specialist sub contractor for chemical cleaning, catalyst loading, hydraulic flushing etc ...
Main activities:
- Management of commissioning preparation performed by EPSCC
- Responsible for Commissioning budget
- Responsible for Commissioning planning.
- Preparation, Commercial and technical negotiation, clarifications.
- In charge for the Commissioning team recruitment.
- Management of commissioning execution phase.
- Management of assistance during the start up by commissioning team
- Responsible for hand over of the installation to Operation department
-
Total E&P
- Commissioning Manager
COURBEVOIE
2013 - 2016
Kharyaga field phase 3 (package 4): Sulphur removal unit: Supervision and validation of commissioning preparation performed by EPSCC
- Kharyaga field in-house commissioning: Management of all commissioning preparation and execution for projects performed by EPC contract.
- Responsible for Commissioning budget (In-house and EPCSS contract)
- Responsible for Commissioning planning.
- Bid and proposal review and validation for future project in TEPR. Preparation, Commercial and technical negotiation, clarifications.
- In charge for the Commissioning team recruitment for all project in TEPR
-
CEGELEC
- Manager
Saint-Denis
2012 - 2013
CEGELEC Oil & Gas Korean Branch Manager (Group Vinci Energies)
- Installation and start of the Agency in regard of Korean Law, Tax and regulation.
- HSE manager for activities in Korea.
- Manager for all Vinci Energies activities in South Korea.
- Bid and proposal preparation for future project in Korea: preparation, Commercial and technical negotiation, clarifications.
- In charge for the team recruitment for all project in South Korea.
- Invoicing and budget responsible for on-going project.
- Support all development for Vinci Énergies in South Korea
- Responsible for projects in South Korea
* FPSO PAZFLOR for DSME and TOTAL.
* FPSO CLOV for DSME and TOTAL.
* ICHTHYS FPSO for DSME and INPEX.
* ICHTHYS CPF for SHI and INPEX.
* MAFUMEIRA for DSME and CHEVRON.
* BID for EGINA PROJECT.
* BID for ROSEBANK PROJECT.
-
CEGELEC Oil & Gas
- Commissioning Manager
saint denis
2011 - 2013
CEGELEC Oil & Gas.
CLOV area is located in Block 17 offshore Angola. The area lies in 1200 to 1400 meters depth. The field area is approximately 10km x 10km and the distance from the field to the shore is approximately 230km.
CLOV development is a subsea production system tied-back to an FPSO containing the process, storage and offloading facilities
- Responsible for the preparation and execution supervision of commissioning:
OTP, Procedures, data base, sub system limits, planning and reporting.
- Supervise and validate the EPSCC Contractor activities linked to the Commissioning of the FPSO during the Preparation and Execution Phases
Onshore & Offshore,
- Promote safety within the commissioning activities and verify that safety procedures and permit to work systems are implemented by the EPCC
Contractor Commissioning Team.
- Main activities:
- To manage and direct the activities of the Company multi-disciplined
Commissioning supervision and support team in the yards and FAT sites and ensure all relevant commissioning scopes of work between the FPSO EPSCC
Contractor and the main equipment suppliers is being co-ordinated and executed in a sequenced and timely manner.
- To manage Company interface and acceptance of Contractors pre commissioning and commissioning preparation, and execution activities both
Onshore and Offshore ensuring that Company requirements and the OPERCOM and ICAPS methodology are fulfilled in-compliance with the Contractual
Obligations of the Contracts.
- To verify that all necessary means: Logistics, Manpower, FAT's, Vendor
Assistance, Materials, Test Fluids & Gases, Spare Parts, Temporary Supplies, First Fills, Consumables, Tools and Test Equipment have been co-ordinated, planned and mobilised by the EPSCC Contractor to carry out the commissioning activities.
- To establish technical coordination between all concerned parties; CLOV Project
Groups and Contractor(s) etc, and initiate corrective action (as may be required) to promote Commissioning Targets and Objectives.
- To prepare the necessary Project management reports on all aspects pertaining to Pre commissioning and Commissioning Progress and Status by monitoring and verifying planned activities against the actual progress of activities.
- To prepare RFSU / RFHO dossier for Hand Over to Field Operation Team.
-
CEGELEC Oil & Gas
- Commissioning Manager
saint denis
2010 - 2011
The Greater PAZFLOR area is located in Block 17 offshore Angola. The area lies in 1200 to 1400 meters depth. The field area is approximately 10km x 10km and the distance from the field to the shore is approximately 230km.
The PAZFLOR development is a sub sea production system tied-back to an FPSO containing the process, storage and offloading facilities
-
- Responsible for the preparation and execution supervision of commissioning:
OTP, Procedures, data base, sub system limits, planning and reporting.
- Supervise and validate the EPCC Contractor activities linked to the Commissioning of the FPSO during the Preparation and Execution Phases
Onshore & Offshore,
- Promote safety within the commissioning activities and verify that safety procedures and permit to work systems are implemented by the EPCC
Contractor Commissioning Team.
- Main activities:
- To manage and direct the activities of the Company multi-disciplined
Commissioning supervision and support team in the yards and FAT sites and ensure all relevant commissioning scopes of work between the FPSO EPSCC
Contractor and the main equipment suppliers is being co-ordinated and executed in a sequenced and timely manner.
- To manage Company interface and acceptance of Contractors
Precommissioning and commissioning preparation, and execution activities both Onshore and Offshore ensuring that Company requirements and the OPERCOM and ICAPS methodology are fulfilled in-compliance with the Contractual Obligations of the Contracts.
- To verify that all necessary means: Logistics, Manpower, FAT's, Vendor
Assistance, Materials, Test Fluids & Gases, Spare Parts, Temporary Supplies, First Fills, Consumables, Tools and Test Equipment have been co-ordinated, planned and mobilised by the EPSCC Contractor to carry out the commissioning activities.
- To establish technical coordination between all concerned parties; PAZFLOR
Project Groups and Contractor(s) etc, and initiate corrective action (as may be required) to promote Commissioning Targets and Objectives.
- To prepare the necessary Project management reports on all aspects pertaining to Precommissioning and Commissioning Progress and Status by monitoring and verifying planned activities against the actual progress of activities.
- To prepare RFSU / RFHO dossier for Hand Over to Field Operation Team
-
TOTAL E&P
- Commissioning Site Leader
2008 - 2010
CEGELEC Oil & Gas. TUNU 12/13A Commissioning Site Leader
TOTAL - Project TUNU 12 / 13A 5 GTS (
Gathering and testing Satellite platform: 135 MMsc/d in MP mode for each GTS extension connected to existing GTS (Tie in).
- Commissioning management for all discipline.
- Follow up of up dated of design dossier
- Follow up of pre commissioning.
- Planning and logistic management
- Reporting to Commissioning manager
- Follow up of `` As Commissioned'' dossier
- Hand over of the platform to Operation team with training
- Start up assistance.
Equipment :
- Instrumentation Rosemount, Chloride, Coriolis.
- System: HONEYWELL.
- Power distribution: Schneider
- Power production: CCVT Ormat.
Team: (27 People):
- Management of expatriates and local superintendents.
- Training of local superintendents.
- Management of local supervisors and technicians
-
TOTAL E&P
- Commissioning Site Leader
2007 - 2008
CEGELEC Oil & Gas. PECIKO 5 Commissioning Site Leader
TOTAL - Project PECIKO 5 - Platform SWP-F (
Gas production platform with 4 legged jacket 8 slots for a production of 250
MMScf/d in MP Mode connecting by pipeline to existing platform SWP-E
- Commissioning management for all discipline.
- Follow up of up dated of design dossier
- Follow up of pre commissioning.
- Planning and logistic management
- Reporting to Commissioning manager
- Follow up of `` As Commissioned'' dossier
- Hand over of the platform to Operation team with training
- Start up assistance.
Equipment :
- instrumentation Rosemount Endress & Hauser, Coriolis.
- System: Rosemount
- Power distribution Diesel Generator: 2H Energy
Team: (25 People):
- Management of expatriates and local superintendents.
- Training of Local Superintendents.
- Management of local supervisors and technicians
-
TOTAL E&P
- Commissioning Site Leader
2006 - 2007
CEGELEC Oil & Gas. SISI NUBI Platform SNPS Commissioning Site Leader
TOTAL - Project SISI NUBI Platform SNPS (
Slug catcher (finger type) platform connected to 3 wellhead platforms for a production of 350 MMcs/d.
- Commissioning management for all discipline.
- Follow up of up dated of design dossier
- Follow up of pre commissioning.
- Planning and logistic management
- Reporting to Commissioning manager
- Follow up of `` As Commissioned'' dossier
- Hand over of the platform to Operation team with training.
- Start up assistance
- Punch list clearance for all project platform (off shore and on shore).
Equipment:
- Instrumentation Rosemount, Coriolis.
- System: HONEYWELL.
- Power distribution: Diesel generator 2H Energy
- MCC: SCHNEIDER.
Team: (25 People):
- Management of expatriates and local superintendents.
- Training of Local Superintendents.
- Management of local supervisors and technicians
-
TOTAL E&P
- Commissioning Site Leader
2005 - 2006
CEGELEC Oil & Gas. Commissioning E&I Superintendant
TOTAL - Project TAMBORA 2 / TUNU 10 (
Installation of three extra gas platforms: production 250MMsc/d with pick at 350
MMsc/d with tie in on existing pipeline.
- Follow up of up dated of E&I design dossier
- Follow up of E&I pre commissioning.
- Commissioning for E&I discipline.
- Reporting to Commissioning Site Leader
- Follow up of E&I `` As Commissioned'' dossier
-
TOTAL E&P
- Commissioning Site Leader
2005 - 2010
-
CEGELEC Oil & Gas
- E&I superintendant
saint denis
2005 - 2005
CEGELEC Oil & Gas. Engineering, construction and Commissioning E&I Superintendant
- Gas Production OML 58 Obite field
Gas production de-bottlenecking to increase production from 7,15 MSm3 to 9,46
MSm3 of OBITE Gas Plant
- Construction - Pre-Commissioning E&I Superintendent.
- Design endorsement for electricity ,instrumentation and control command
- Construction superintendent for electricity and instrumentation.
- Pre-commissioning of the plant.
- Punch list clearance
Equipment:
- instrumentation ROSEMOUNT, FOXBORO
- monitoring: vibration system MECASON
- digital control YOGOKAWA
- Metering DANIEL
- Power distribution and motors MERLIN GERIN
-
CEGELEC Oil & Gas
- E&I superintendent
saint denis
1999 - 2004
PERFOMANCE TESTS PHASES.
TOTALFINAELF - KHARYAGA field - Russia (Siberia)
- Construction - Commissioning Superintendent for Phase 2 Extension.
- Design supervisor for electricity ,instrumentation and control command
- Construction supervisor for electricity and instrumentation.
- Modifications of drawings phase for phase 2.
- Pre-commissioning and commissioning of the plant.
- Start up of the plant
- Punch list, lifting following.
- Performance tests.
Equipment:
- - Instrumentation ROSEMOUNT FOX BORO, ENDRESS & HAUSER
- - monitoring: vibration system BENTLEY NEVADA
- - Digital control FISHER ROSEMOUNT DELTA V
- - Metering JORDAN KENT
- - Power distribution and motors 6 KV SWITCHGEAR & INSTRUMENT
- - Speed controller ABB
-
CEGELEC Oil & Gas
- Design supervisor
saint denis
1999 - 1999
E&I SUPERVISOR FOR DESIGN TO PERFORMANCE TESTS
for electricity ,instrumentation and control command
- Construction supervisor for electricity and instrumentation.
- Modifications of drawings phase for injection of naphtha of the pipeline
- Pre-commissioning and commissioning of the plant.
- Start up of the plant
- Punch list, lifting following.
-
Total
- Commissioning manager
COURBEVOIE
1998 - 2019