Stephane CHERRIERE

COURBEVOIE

En résumé

Mes compétences :
commissioning preparation
Commissioning budget
Commissioning planning
hand
technical negotiation
Sulphur Removal
Commissioning management
FPSO
THE E
logistic management
Management of expatriates and local superintendent
the preparation
execution supervision
CLOV development
Commissioning supervision and support
PAZFLOR development
Slug Catchers
Taxation
manage Company interface
technical coordination
proposal preparation
Invoicing > Issuing Invoices
Offshore Oil & Gas
Onshore Oil & Gas
projects
Management of local supervisors and technicians
Internet
Microsoft Access
Microsoft Excel
Microsoft PowerPoint

Entreprises

  • Total E&P - Commissioning Manager

    COURBEVOIE 2016 - maintenant Management of Commissioning activities from Commissioning Engineering up to start up.
    Budget: 56 M euros.
    Commissioning team composed by:
    - Integrated commissioning team by 56 engineers and supervisors with 50% of Company employees and 50% EPSCC contractor employees.
    - E&I commissioning specialist sub contractor: 380 persons
    - HVAC commissioning specialist sub contractor: 180 persons
    - Mechanical commissioning specialist sub contractor: 160 persons
    - Leak test sub contractor
    - Specialist sub contractor for chemical cleaning, catalyst loading, hydraulic flushing etc ...

    Main activities:
    - Management of commissioning preparation performed by EPSCC
    - Responsible for Commissioning budget
    - Responsible for Commissioning planning.
    - Preparation, Commercial and technical negotiation, clarifications.
    - In charge for the Commissioning team recruitment.
    - Management of commissioning execution phase.
    - Management of assistance during the start up by commissioning team
    - Responsible for hand over of the installation to Operation department
  • Total E&P - Commissioning Manager

    COURBEVOIE 2013 - 2016 Kharyaga field phase 3 (package 4): Sulphur removal unit: Supervision and validation of commissioning preparation performed by EPSCC

    - Kharyaga field in-house commissioning: Management of all commissioning preparation and execution for projects performed by EPC contract.
    - Responsible for Commissioning budget (In-house and EPCSS contract)
    - Responsible for Commissioning planning.
    - Bid and proposal review and validation for future project in TEPR. Preparation, Commercial and technical negotiation, clarifications.
    - In charge for the Commissioning team recruitment for all project in TEPR
  • CEGELEC - Manager

    Saint-Denis 2012 - 2013 CEGELEC Oil & Gas Korean Branch Manager (Group Vinci Energies)
    - Installation and start of the Agency in regard of Korean Law, Tax and regulation.
    - HSE manager for activities in Korea.

    - Manager for all Vinci Energies activities in South Korea.
    - Bid and proposal preparation for future project in Korea: preparation, Commercial and technical negotiation, clarifications.
    - In charge for the team recruitment for all project in South Korea.
    - Invoicing and budget responsible for on-going project.
    - Support all development for Vinci Énergies in South Korea
    - Responsible for projects in South Korea
    * FPSO PAZFLOR for DSME and TOTAL.
    * FPSO CLOV for DSME and TOTAL.
    * ICHTHYS FPSO for DSME and INPEX.
    * ICHTHYS CPF for SHI and INPEX.
    * MAFUMEIRA for DSME and CHEVRON.
    * BID for EGINA PROJECT.
    * BID for ROSEBANK PROJECT.
  • CEGELEC Oil & Gas - Commissioning Manager

    saint denis 2011 - 2013 CEGELEC Oil & Gas.
    CLOV area is located in Block 17 offshore Angola. The area lies in 1200 to 1400 meters depth. The field area is approximately 10km x 10km and the distance from the field to the shore is approximately 230km.
    CLOV development is a subsea production system tied-back to an FPSO containing the process, storage and offloading facilities

    - Responsible for the preparation and execution supervision of commissioning:
    OTP, Procedures, data base, sub system limits, planning and reporting.
    - Supervise and validate the EPSCC Contractor activities linked to the Commissioning of the FPSO during the Preparation and Execution Phases
    Onshore & Offshore,
    - Promote safety within the commissioning activities and verify that safety procedures and permit to work systems are implemented by the EPCC
    Contractor Commissioning Team.
    - Main activities:
    - To manage and direct the activities of the Company multi-disciplined
    Commissioning supervision and support team in the yards and FAT sites and ensure all relevant commissioning scopes of work between the FPSO EPSCC
    Contractor and the main equipment suppliers is being co-ordinated and executed in a sequenced and timely manner.
    - To manage Company interface and acceptance of Contractors pre commissioning and commissioning preparation, and execution activities both
    Onshore and Offshore ensuring that Company requirements and the OPERCOM and ICAPS methodology are fulfilled in-compliance with the Contractual
    Obligations of the Contracts.
    - To verify that all necessary means: Logistics, Manpower, FAT's, Vendor
    Assistance, Materials, Test Fluids & Gases, Spare Parts, Temporary Supplies, First Fills, Consumables, Tools and Test Equipment have been co-ordinated, planned and mobilised by the EPSCC Contractor to carry out the commissioning activities.
    - To establish technical coordination between all concerned parties; CLOV Project
    Groups and Contractor(s) etc, and initiate corrective action (as may be required) to promote Commissioning Targets and Objectives.
    - To prepare the necessary Project management reports on all aspects pertaining to Pre commissioning and Commissioning Progress and Status by monitoring and verifying planned activities against the actual progress of activities.
    - To prepare RFSU / RFHO dossier for Hand Over to Field Operation Team.
  • CEGELEC Oil & Gas - Commissioning Manager

    saint denis 2010 - 2011 The Greater PAZFLOR area is located in Block 17 offshore Angola. The area lies in 1200 to 1400 meters depth. The field area is approximately 10km x 10km and the distance from the field to the shore is approximately 230km.
    The PAZFLOR development is a sub sea production system tied-back to an FPSO containing the process, storage and offloading facilities
    -
    - Responsible for the preparation and execution supervision of commissioning:
    OTP, Procedures, data base, sub system limits, planning and reporting.
    - Supervise and validate the EPCC Contractor activities linked to the Commissioning of the FPSO during the Preparation and Execution Phases
    Onshore & Offshore,
    - Promote safety within the commissioning activities and verify that safety procedures and permit to work systems are implemented by the EPCC
    Contractor Commissioning Team.
    - Main activities:
    - To manage and direct the activities of the Company multi-disciplined
    Commissioning supervision and support team in the yards and FAT sites and ensure all relevant commissioning scopes of work between the FPSO EPSCC
    Contractor and the main equipment suppliers is being co-ordinated and executed in a sequenced and timely manner.
    - To manage Company interface and acceptance of Contractors
    Precommissioning and commissioning preparation, and execution activities both Onshore and Offshore ensuring that Company requirements and the OPERCOM and ICAPS methodology are fulfilled in-compliance with the Contractual Obligations of the Contracts.
    - To verify that all necessary means: Logistics, Manpower, FAT's, Vendor
    Assistance, Materials, Test Fluids & Gases, Spare Parts, Temporary Supplies, First Fills, Consumables, Tools and Test Equipment have been co-ordinated, planned and mobilised by the EPSCC Contractor to carry out the commissioning activities.
    - To establish technical coordination between all concerned parties; PAZFLOR
    Project Groups and Contractor(s) etc, and initiate corrective action (as may be required) to promote Commissioning Targets and Objectives.
    - To prepare the necessary Project management reports on all aspects pertaining to Precommissioning and Commissioning Progress and Status by monitoring and verifying planned activities against the actual progress of activities.
    - To prepare RFSU / RFHO dossier for Hand Over to Field Operation Team
  • TOTAL E&P - Commissioning Site Leader

    2008 - 2010 CEGELEC Oil & Gas. TUNU 12/13A Commissioning Site Leader

    TOTAL - Project TUNU 12 / 13A 5 GTS (
    Gathering and testing Satellite platform: 135 MMsc/d in MP mode for each GTS extension connected to existing GTS (Tie in).

    - Commissioning management for all discipline.
    - Follow up of up dated of design dossier
    - Follow up of pre commissioning.
    - Planning and logistic management

    - Reporting to Commissioning manager
    - Follow up of `` As Commissioned'' dossier
    - Hand over of the platform to Operation team with training
    - Start up assistance.

    Equipment :
    - Instrumentation Rosemount, Chloride, Coriolis.
    - System: HONEYWELL.
    - Power distribution: Schneider
    - Power production: CCVT Ormat.

    Team: (27 People):
    - Management of expatriates and local superintendents.
    - Training of local superintendents.
    - Management of local supervisors and technicians
  • TOTAL E&P - Commissioning Site Leader

    2007 - 2008 CEGELEC Oil & Gas. PECIKO 5 Commissioning Site Leader

    TOTAL - Project PECIKO 5 - Platform SWP-F (
    Gas production platform with 4 legged jacket 8 slots for a production of 250
    MMScf/d in MP Mode connecting by pipeline to existing platform SWP-E

    - Commissioning management for all discipline.
    - Follow up of up dated of design dossier
    - Follow up of pre commissioning.
    - Planning and logistic management
    - Reporting to Commissioning manager
    - Follow up of `` As Commissioned'' dossier
    - Hand over of the platform to Operation team with training
    - Start up assistance.

    Equipment :
    - instrumentation Rosemount Endress & Hauser, Coriolis.
    - System: Rosemount
    - Power distribution Diesel Generator: 2H Energy

    Team: (25 People):
    - Management of expatriates and local superintendents.
    - Training of Local Superintendents.
    - Management of local supervisors and technicians
  • TOTAL E&P - Commissioning Site Leader

    2006 - 2007 CEGELEC Oil & Gas. SISI NUBI Platform SNPS Commissioning Site Leader

    TOTAL - Project SISI NUBI Platform SNPS (
    Slug catcher (finger type) platform connected to 3 wellhead platforms for a production of 350 MMcs/d.

    - Commissioning management for all discipline.
    - Follow up of up dated of design dossier
    - Follow up of pre commissioning.

    - Planning and logistic management
    - Reporting to Commissioning manager
    - Follow up of `` As Commissioned'' dossier
    - Hand over of the platform to Operation team with training.
    - Start up assistance
    - Punch list clearance for all project platform (off shore and on shore).

    Equipment:
    - Instrumentation Rosemount, Coriolis.
    - System: HONEYWELL.
    - Power distribution: Diesel generator 2H Energy
    - MCC: SCHNEIDER.

    Team: (25 People):
    - Management of expatriates and local superintendents.
    - Training of Local Superintendents.
    - Management of local supervisors and technicians
  • TOTAL E&P - Commissioning Site Leader

    2005 - 2006 CEGELEC Oil & Gas. Commissioning E&I Superintendant

    TOTAL - Project TAMBORA 2 / TUNU 10 (
    Installation of three extra gas platforms: production 250MMsc/d with pick at 350
    MMsc/d with tie in on existing pipeline.

    - Follow up of up dated of E&I design dossier
    - Follow up of E&I pre commissioning.
    - Commissioning for E&I discipline.
    - Reporting to Commissioning Site Leader
    - Follow up of E&I `` As Commissioned'' dossier
  • TOTAL E&P - Commissioning Site Leader

    2005 - 2010
  • CEGELEC Oil & Gas - E&I superintendant

    saint denis 2005 - 2005 CEGELEC Oil & Gas. Engineering, construction and Commissioning E&I Superintendant

    - Gas Production OML 58 Obite field
    Gas production de-bottlenecking to increase production from 7,15 MSm3 to 9,46
    MSm3 of OBITE Gas Plant

    - Construction - Pre-Commissioning E&I Superintendent.
    - Design endorsement for electricity ,instrumentation and control command
    - Construction superintendent for electricity and instrumentation.
    - Pre-commissioning of the plant.
    - Punch list clearance

    Equipment:

    - instrumentation ROSEMOUNT, FOXBORO
    - monitoring: vibration system MECASON
    - digital control YOGOKAWA
    - Metering DANIEL
    - Power distribution and motors MERLIN GERIN
  • CEGELEC Oil & Gas - E&I superintendent

    saint denis 1999 - 2004 PERFOMANCE TESTS PHASES.

    TOTALFINAELF - KHARYAGA field - Russia (Siberia)

    - Construction - Commissioning Superintendent for Phase 2 Extension.
    - Design supervisor for electricity ,instrumentation and control command
    - Construction supervisor for electricity and instrumentation.
    - Modifications of drawings phase for phase 2.
    - Pre-commissioning and commissioning of the plant.
    - Start up of the plant
    - Punch list, lifting following.
    - Performance tests.

    Equipment:
    - - Instrumentation ROSEMOUNT FOX BORO, ENDRESS & HAUSER
    - - monitoring: vibration system BENTLEY NEVADA
    - - Digital control FISHER ROSEMOUNT DELTA V
    - - Metering JORDAN KENT
    - - Power distribution and motors 6 KV SWITCHGEAR & INSTRUMENT
    - - Speed controller ABB
  • CEGELEC Oil & Gas - Design supervisor

    saint denis 1999 - 1999 E&I SUPERVISOR FOR DESIGN TO PERFORMANCE TESTS

    for electricity ,instrumentation and control command
    - Construction supervisor for electricity and instrumentation.
    - Modifications of drawings phase for injection of naphtha of the pipeline
    - Pre-commissioning and commissioning of the plant.
    - Start up of the plant
    - Punch list, lifting following.
  • Total - Commissioning manager

    COURBEVOIE 1998 - 2019