The Regina Bypass is the largest transportation infrastructure project in the province’s history, is vital to ensuring the continuing economic prosperity and vitality of Saskatchewan and of the Regina region in particular.
This is the first transport infrastructure project to be completed in a public-private partnership (P3) in Saskatchewan and will improve safety, reduce congestion and create jobs.
EUROVIA
- Stagiaire Projet de Fin d'Etude
Rueil Malmaison2015 - 2015VINCI - EUROVIA | Paris (75) - France | 6 months
Thèmes:
- Application des drones en carrières, usines de liant et postes d'enrobage
- Enregistrement de donnée sur les finisseurs lors de la mise en oeuvre d'enrobé
www.eurovia.fr
Colas
- Site Manager Assistant | Assistant Conducteur de Travaux
Boulogne-Billancourt2014 - 2014COLAS - GTOI | Reunion Island (974) - Indian Ocean | 3 months
Role overview: Assisted the site manager in his tasks for 3 months in order to gain experience in site managing.
Relevant achievement:
- Prepared all documents regarding the construction of 3 parking areas at Anse des Cascade
Located in: Sainte Rose, Reunion Island
[ Value of the construction: 1 152 443 € - Construction period : 3 months ]
¤ Quantified raw material needs;
¤ Evaluated and compared consultations from suppliers;
¤ Compared and set up contracts with subcontractors;
¤ Wrote official required documents: Specific health and security protection plan, Environmental Action Plan, Quality Assurance Plan;
- Prepared all documents regarding the construction of the bicycle path: Sentier Littoral Nord
Located in Saint-Denis and Sainte-Marie, Reunion Island
[ Value of the construction: 209 000 € - Construction period: 3 weeks ]
¤ Quantified raw material needs;
¤ Evaluated and compared consultations from suppliers;
¤ Compared and set up contracts with subcontractors;
¤ Wrote official required documents: Specific health and security protection plan, Environmental Action Plan, Quality Assurance Plan;
¤ Set up site planning (short/long term);
- Assisted the foreman regarding the construction of the bicycle path du Sentier Littoral Nord
Located in Saint-Denis and Sainte-Marie, Reunion Island
[ Value of the construction: 209 000 € - Construction period: 3 weeks ]
¤ Managed three teams of three labourers;
- Assisted the Quality-Security-Environment manager
¤ Prepared security cases for foremans;
¤ Created and distributed a security guide for foreman (30 safety sheets);
¤ Animated 'Security Starters' for labourers on sites;
www.colas.com
Colas
- Labourer Internship | Stage Ouvrier
Boulogne-Billancourt2013 - 2013COLAS - GTOI | Reunion Island (974) - Indian Ocean | 2 months
The site was the development of the parc: Coeur Vert Familial - Saint-Denis
Value of the construction: 10 400 000 €
Construction period: 1 year - Surface: 35,5 Hectares
Realization of many amenities:
- Largest Skate Park in the Indian Ocean
- Picnic areas
- Kids areas, including a water play area
- An open air theater
- Kiosks
- Beach football
- Fitness trails
Paris, Cachan2012 - 2015Paris (75) - France | 3 years
Master’s degree in Civil and Building engineering at « Ecole Spéciale des Travaux Publics et du Bâtiment (ESTP) », one of France’s leading engineering schools, with a major in surveying. Specialization: Road Construction.
Bordeaux2010 - 2012Bordeaux (33) - France | 2 years
Two years intensive undergraduated courses to prepare nationwide competitive entrance for exams to the French Grandes Ecoles (Highly selective graduate engineering schools). Major in Mathematics, Physics and Engineering Sciences.