AREVA - Imouraren
- Contract Manager
2012 - 2014
Project: Imouraren Uranium Mine Construction
Acting for the Owner Areva, as contract manager for the construction of the Imouraren Uranium Mine Project, in charge of all duties related to the position including interfacing with contractors, the engineer TSU and the Areva operation's team.
The mine project include earthworks for roads, basins and platforms, concrete, mechanical erections, primary and secondary crushing units, acid sulfuric plant, power plant, yellow cake plant and all the other utilities necessary for the mine erection.
-
BECHTEL
- Senior Contract Administrator
San Francisco
2011 - 2012
Project: Infrastructure Master Plan of Gabon
In charge of the activities of contract formation and administration for the infrastructure development plan of Gabon.
Acting for the Owner ``Maitred'Ouvrage'' for the tenders preparation, the contractor's prequalification, the call for bid, the technical and financial evaluation of the proposed bid and all the other activities related to the pre contract award including negotiations with the selected contractors.
All other activities for the post contract award up to the contract close out as described in the skills highlighting.
-
SALINI Nigeria Ltd
- Senior QS & Contract Engineer
2008 - 2008
Project: Cultural Centre/Millennium Tower projects
Senior QS and Contract Engineer for the construction of IDU development area and Cultural Centre/ Millennium Tower projects
In charge of the active and passive monthly progress evaluations and preparation of the monthly payment certificates.
-
TECHNIP - Koné
- Senior Subcontract Administrator
2008 - 2010
Project: Koniambo Nickel Project
* Senior Contract Administrator for the infrastructures construction of the Koniambo Nickel Project
In charge of 20 contracts for mass earthworks, piling, civil works and various services contracts for a total amount of USD350 million.
Follow up of the monthly contract payment, the study of financial claims, the construction weekly meeting, the contractual correspondence and the preparation of the contracts variation orders.
-
SANDVIK
- Contract Manager
CHAROST
2007 - 2007
Project: ENEL Torrevaldaliga Nord Coal Fired Power Plant (CFPP)
* Contract Manager for the construction of ENEL Torrevaldaliga Nord Coal Fired Power Plant (CFPP)
Study and preparation of a claim regarding obstruction and client responsibilities creating delays and extra cost to the project
-
Sandvik et Salini Nigeria
- Contract manager/senior QS
2007 - 2008
SALINI Abuja Nigeria
Responsable du secteur de comptabilité des travaux des projets d’IDU area, du Centre Culturel et de la Millenium Tower à Abuja, chargé de l’émission des états d’avancement des travaux et des certificats de paiement ainsi que du contrôle comptable des sociétés sous-traitantes.
SANDVIK Civitavecchia (Italie)
Contrat manager pour la construction de la centrale électrique à charbon de Torrevaldaliga Nord pour ENEL, préparation d’un dossier de réclamation sur les retards d’exécution causés par le client et les couts supplémentaires.
-
DCSMI
- Consultant
2006 - 2007
Feasibility study for the installation of a local branch to supply advice and training to civil works local companies for the formation and qualification of their personnel on quality procedures and safety matters.
-
DCSMI Geneve
- Consultant
2006 - 2007
DCSMI Systèmes de Management Intégrés Dakar (Sénégal), Casablanca (Maroc)
Consultant pour une étude de faisabilité technico/commercial pour l’ouverture de filiales pour accompagner les sociétés locales de BTP et génie civil à former leur staff aux techniques et procédures de la qualité et de la sécurité sur les chantiers.
-
GENERAL ELECTRIC
- Contract Manager & Subcontract Administrator
Paris
2004 - 2005
Project: South Baghdad project construction of a new electrical power plant 2x135 MW gas turbines GE type 9000E for a total amount of USD 150 millions.
Site manager
Project: completion of La Goulette Electrical Power Plant, finishing works and Client punch list execution.
-
DCSMI
- Management Consultant
2003 - 2004
Management Consultant
External consultant for technical and administrative matters related to the contracts management and support for the preparation of the construct ability management procedures.
-
SOLESI
- Site Manager
2001 - 2003
Project: Construction of several new units at Tamoil Refinery of Collombey, Switzerland
Site management for Civil Works related to the construction of several new units at Tamoil refinery of Collombey,
In charge of supervision and coordination of the local civil subcontractors, dealing with subcontractors, client, engineer and local authority.
Contract disputes with the local civil subcontractors for the interpretation and definition of charges included in the unit prices description and for the application of the Special Contract Conditions obligations and liabilities, particularly related to the conflicts and overlapping of the different project activities.
Writing of the contractual correspondence during the construction period and preparation of the technical and contractual memorandums needed by the legal representative for the negotiation and settlement of disputes.
-
SUB SAHARA Services Inc.
- Subcontract Administrator
2001 - 2001
Project: ESSO Chad/Cameroon oilfield Project
Subcontract administrator, working for the consortium (Kellogg, Bouygues, Comelex), for the execution of the Esso Chad/Cameroon oilfield exploitation project in the southern region of Chad and the related pipeline trough the Cameroon.
* In charge of all the subcontracts tasks
* Bids preparation and evaluation
* Contracts negotiations and management
* Coordination of the subcontractors for all the construction activities
Follow-up of the monthly work progress and payment certificates
* Dealing with the final client ESSO
-
DCSMI et IREM
- Consultant conducteur trx
2000 - 2004
DCSMI Systèmes de Management Intégrés Genève SUISSE
Consultant externe pour le soutien à la gestion contractuelle et pour la préparation des procédures techniques/administratives de management de la construction pour un client saoudien.
Groupement SOLESI SRL IREM en SUISSE
Responsable des travaux de génie civil pour la construction d’unités de production supplémentaires à la raffinerie Tamoil de Collombey, chargé de la supervision et coordination des sociétés de génie civil sous-traitantes des travaux ainsi que de la gestion contractuelle pour l’exécution du projet et des relations avec le Maître d’0uvrage, les sociétés d’ingénierie et les autorités locales.
Négociations contractuelles avec les sous-traitants locaux de génie civil concernant les charges comprises dans la description des prix unitaires et pour l’application des obligations et responsabilités décrites dans les Conditions Spéciales du Contrat concernant les conflits entre les disciplines et le chevauchement des activités.
Emission de la correspondance contractuelle pendant l’exécution du projet et préparation des mémoires techniques pour la négociation et clôture définitive des négociations.
Etude de faisabilité pour l’extension de la raffinerie Tamoil de Collombey ; étude des marchés, préparation des documents contractuels et techniques pour les sociétés sou traitantes de génie civil, comparaison des offres , négociations commerciales et élaboration du prix global pour la soumission.
Mise en place du service de comptabilité des travaux pour la construction des infrastructures liées au projet pétrolier Valle d'Agri au sud de l’Italie avec Agip, leader du consortium d’exploitation : métrés sur site, préparation des décomptes d’avancement relatifs et rapports mensuels, suivi des certificats de paiement et individuation et préparation des dossiers de réclamation technique liées à l’application des prix unitaires et des quantités supplémentaires exécutées.
-
SOLESI
- Lead QS
2000 - 2000
Lead QS
Project: Infrastructural works related to the new oilfield project in Valle d'Agri south of Italy (AGIP)
Coordination and organization of the QS Company Department for the execution of the infrastructural works related to the new oilfield project in Valle d'Agri south of Italy, with AGIP leader of the consortium
Preparation of financial monthly statements and reports
Identification of claims related to the unit rates application
* Follow up of the payment certificates
-
SOLESI
- Subcontract Engineer
2000 - 2001
Project: Polynaphta and New Craking Units at Tamoil refinery of Collombey, Switzerland
Coordination of the feasibility study for the construction of polynaphta and new cracking units for the Tamoil refinery of Collombey
* Market enquires
* Preparation of tender documents for the civil subcontractors
* Analysis of the offers and commercial negotiations
-
ABB SAE
- Lead QS
1998 - 2000
Lead QS
Project: 2x350 MW Coal Fired Power Plant (CFPP)
Responsible of the QS Department for all subcontractor activities for the construction of a 2x350 MW Coal Fired Power Plant
Support to the Contract Manager for the Contract and Subcontract Administration
-
SOLESI
- Civil Works coordinator & Contract Manager
1995 - 1998
Project: Construction of a 25 MW Cogeneration Power Plant at TAMOIL refinery of Collombey, Switzerland
Claims to the Engineer regarding disruption and delay in execution caused by the late delivery of material and equipments on site,
Contract disputes with the civil local subcontractor regarding application and interpretation of unit prices and method of works measurement established by the Engineer.
Site Manager
Project: Extension of the compression gas station in Ruswil, Switzerland
Project manager
Project: Execution of an 18 inches gas line feeder in Athens, Greece
-
IREM SPA SUISSE
- Contract manager
1995 - 1998
Responsable des travaux de génie civil et de la gestion contractuelle pour la construction d’une centrale de cogénération à cycle combiné de 25 MW à la raffinerie TAMOIL de Collombey et pour la construction d’une centrale de compression gaz pour TRANSITGAS à Ruswil en SUISSE.
-
ANSALDO Cesen
- Technical Consultant
1993 - 1995
Project: Infrastructure works in an agricultural development project Casamance region (roads, bridges, hospitals, water storage tanks, sesame oil transformation plant, wells,...)
Acting for the supervision body of the Italian Ministry of Foreign affairs and responsible of technical and financial checks of executed works, the study of the claims submitted by the operating companies, the approval of payment certificates, the relations with the local Authority and the coordination of the various projects.
-
ANSALDO/CESEN SENEGAL
- Expert en infrastructure Ingénieur chef
1993 - 1995
Expert en infrastructures et génie civil dans un projet de développement rural financé par le Ministère des Affaires Étrangères Italien dans la région de Casamance.
Chargé du contrôle et de la surveillance des travaux exécutés, de l’évaluation des réalisations, de l’approbation des décomptes de remboursement et du suivi financier, des relations avec les autorités locales bénéficiaires des projets et la proposition de nouvelles actions pour le développement et le désenclavement de la région intéressée par le programme.
Ce poste demande une connaissance technique et administrative reconnue; à deux reprises dans ma carrière professionnelle, j’ai couvert la position d’ingénieur chef dans le cadre de travaux publics financés par le gouvernement italien ; en Somalie et au Sénégal notamment pour des projets de développement intégrés du Ministère des Affaires Étrangers Italien.
Une loi italienne datant de 1895 prévoie pour tous projets engageant des fonds publics de l’État, la figure de l’ingénieur chef, figure au-dessous des parties qui œuvre comme représentant de l’administration publique agissant dans tous les domaines techniques et administratifs dans les projets jugés d’intérêt public
Cette loi avec tous ces amendements suivants est encore actuelle est c’est donc pour cela que l’administration italienne préconise à chaque fois que des fonds publics sont engagés, cette figure avec mandat de garantir à la fois la bonne exécution des ouvrages, le respect des délais d’exécution et le monitorage des budgets établis.
-
FOCHI
- Lead QS
1991 - 1993
Lead QS
Project: Construction of a Petrochemical Plant in the region of Arak, Iran for a total amount of USD 450 million.
* Responsible for the preparation and submission of company payment certificates
* Coordination of civil subcontractors
* Support to the contract management
-
MALTAURO
- Site Manager
1990 - 1991
Project: Irrigation project in a hilly region of center of Italy
-
ANSALDO Cesen
- Site Supervisor
1986 - 1990
Project: Integrated development project in Somalia (roads, bridges, wells, ...) financed by the Italian Ministry of Foreings Affairs
Responsible for the checks of executed works, the approval of financial statements submitted by the contractors the examination of technical variations proposed and the relations with the local Authority.
Support to the engineer for the preparation of contract correspondence to reject the contractor's claims and requests, technical advices to the Ministry and proposal of variations to the projects to avoid change orders to the main contracts and increase of the approved contract budgets.
Site manager
Project: Feasibility study of an iron ore deposit in the Majunga region in the north of Madagascar
* Responsible of the execution of 2.000 mt.of deep boring in order to assess the deposit quality and power.
-
ANSALDO Cesen
- Site Supervisor
1986 - 1990
Project: Integrated development project in Somalia (roads, bridges, wells, ...) financed by the Italian Ministry of Foreings Affairs
Responsible for the checks of executed works, the approval of financial statements submitted by the contractors the examination of technical variations proposed and the relations with the local Authority.
Support to the engineer for the preparation of contract correspondence to reject the contractor's claims and requests, technical advices to the Ministry and proposal of variations to the projects to avoid change orders to the main contracts and increase of the approved contract budgets.
Site manager
Project: Feasibility study of an iron ore deposit in the Majunga region in the north of Madagascar
* Responsible of the execution of 2.000 mt.of deep boring in order to assess the deposit quality and power.
-
Fiat Impresit
- Sole agent
1983 - 1983
charge of the Cost Control department to and from the beginning of 1985 the sole agent of the company in Saudi Arabia taking up all the duties regarding the project final handing over, the contractual maintenance, the preparation of the as built drawing and the final account together with all the other tasks technical and administrative connected with the end of the project.
Site Manager
Project: Reinforcement of the 50 km asphalted road Yamoussoukro - Bouafle in Ivory Coast.
-
Fiat Impresit
- Sole agent
1983 - 1983
charge of the Cost Control department to and from the beginning of 1985 the sole agent of the company in Saudi Arabia taking up all the duties regarding the project final handing over, the contractual maintenance, the preparation of the as built drawing and the final account together with all the other tasks technical and administrative connected with the end of the project.
Site Manager
Project: Reinforcement of the 50 km asphalted road Yamoussoukro - Bouafle in Ivory Coast.
-
IMPRESIT
- Lead QS and Cost Control Manager
1980 - 1986
Project: 150 Km sewer system in the city of Riyad for a contract amount of USD200 millions.
Responsible of preparation and submission to the Client of financial statements and payment certificates, the preparation of monthly reports, the relations with the engineer and the technical support for the preparation of a USD 100 million claim based on project disruption and following acceleration due to the increase of scope of work related to the change of pipe diameters from bigger to smaller and to the execution of works in narrow and congested areas instead of open areas as foreseen at the beginning of the project.
-
IMPRESIT
- Lead QS and Cost Control Manager
1980 - 1986
Project: 150 Km sewer system in the city of Riyad for a contract amount of USD200 millions.
Responsible of preparation and submission to the Client of financial statements and payment certificates, the preparation of monthly reports, the relations with the engineer and the technical support for the preparation of a USD 100 million claim based on project disruption and following acceleration due to the increase of scope of work related to the change of pipe diameters from bigger to smaller and to the execution of works in narrow and congested areas instead of open areas as foreseen at the beginning of the project.
-
IMPRESIT ARABIE SAOUDITE/COTE D'IVOIRE
- SENIOR QS/CHEF DE CHANTIER
1980 - 1896
Responsable du service de comptabilité des travaux dans un projet pour la construction du réseau des égouts de la ville de Riyad d’un montant de 200 millions de USD environ; préparation des décomptes de paiement, du contrôle des sociétés sous-traitantes, de relations avec la mission de contrôle et le Client ainsi que de la formulation des réserves de réclamation techniques.
Responsable dès 1983 du secteur du planning des travaux et du contrôle des coûts des divers secteurs de la production.
Unique responsable de la société dès 1985, chargé des vérifications provisoires et finales du projet, de la maintenance contractuelle du réseau, de la réception définitive ainsi que de toutes les autres tâches techniques et administratives indispensables pour la fin du projet.
Chef de chantier pour le renforcement d’une route goudronnée de 50 Km en Cote d’Ivoire.
-
ITALCONSULT
- Site Supervisor
1978 - 1980
Project: Construction of the military Brak Airport in the Fezzan region
* In charge of the land surveying and the earthworks activities for a runway of 3.200 mt.lenght.
-
ITALCONSULT
- Site Supervisor
1978 - 1980
Project: Construction of the military Brak Airport in the Fezzan region
* In charge of the land surveying and the earthworks activities for a runway of 3.200 mt.lenght.
-
COLAS Routière
- Land Surveyor
1976 - 1978
Project: Construction of Garoua international airport
* Responsible of land surveying department for the construction of Garoua international airport
Runway of 2.800 mt.and total embankment of 1.200.000 m3
-
COLAS Routière
- Land Surveyor
1976 - 1978
Project: Construction of Garoua international airport
* Responsible of land surveying department for the construction of Garoua international airport
Runway of 2.800 mt.and total embankment of 1.200.000 m3
-
C.LOTTI and COLAS
- Land Surveyor
1975 - 1976
* Responsible of land surveying department for the construction of Garoua international airport
* Land surveyor and earthworks assistant for an agricultural development project financed by the World Bank in the region of Tandjile south of Chad
* Topographical checks and survey for the N'djamena international airport runway reinstatement.
-
ITALCONSULT/COLAS/LOTTI LIBYE-TCHAD-CAMEROUN
- Superviseur/chef topo
1975 - 1980
ITALCONSULT en LIBYE
Superviseur pour la mission de contrôle dans un projet de construction d’un aéroport militaire à Brak dans la région du Fezzan.
SOCIETE ROUTIERE COLAS au CAMEROUN
Responsable du bureau topographique pour la construction du nouvel aéroport international de la ville de Garoua.
LOTTI au TCHAD
Responsable du bureau topographique et des travaux de terrassement pour un projet de développement agricole financé par la Banque Mondial au sud du Tchad dans la région de la Tandjlé.
-
MATRELLA
- Land Surveyor & Land surveyor
1969 - 1974
* Land surveyor for roads and civil works projects; earthworks execution, volume calculation and all the other tasks related to a technical office.