Indaver
- Health and Safety Manager
2017 - maintenant
Construction Green-field d'une unité de transformation de déchets Chlorés.
Invest de 40 Ml € sjur Loon-Plage - France
-
ecophos
- HSE Manager
2016 - 2017
Manager HSE pour la construction d'une unité de production de phosphate pour l'alimentation animal.
-
Voltalia
- Consultant HSE
Neuilly-sur-Seine
2015 - 2015
Audits des sites Français, Guyanais et Brésiliens pour des énergies éoliennes, hydrauliques et biomasses..
Etude et conception de la documentation HSE corporative et construction
-
ATEIM - AREVA – Biomass Power Plant at Commentry - France
- • Safety and Health Manager
2013 - 2015
• Interference Management between ADISSEO (production plant) and BEC Project.
• Budget - 42 Million Euros.
Achievements:
• Drafting of the Safety management Plan, implementation and coordination of the safety organization of the site (procedures, means and human),
• Recruiting of the safety team
• Member of the steering committee,
• Analysis and management of method statements and work permits,
• Management of info-center during the safety phases and management of interferences,
-
ATEIM - Rio Tinto Alcan – Pechiney – Aluminium Dunkerque – France
- • Safety and Health Manager
2012 - 2013
• Budget - 32 Millions Euros.
Achievements:
• Drafting of the General Coordination Plan, implementation and coordination of the safety organization of the site (procedures, means and human),
• Recruiting of the safety team (posted) and medical team (3 safety supervisors, 2 nurses),
• Member of the steering committee,
• Analysis and management of method statements and work permits,
• Management of info-center during the safety phases and management of interferences,
• Privileged interlocutor with the building owner, the CHSCT and officials institutions,
• Peak workforce supervised: 600 persons. 250 000 worked hours on site without accident - SR 0 – FR 0.
-
ATEIM - ArcelorMittal - Al Jubail – Saudi Arabia – Greenfield
- Safety, Health Protection and Security Manager
dampierre en burly
2009 - 2012
ArcelorMittal - Al Jubail – Saudi Arabia – Greenfield - Seamless pipe mill project
• Budget: 800 Million USD
Achievements:
• Safety, Health Protection and Security Site Manager during the construction phase,
• Drafting, setting-up and coordination of the site safety organization (procedures, means and human),
• Recruitment of ArcelorMittal security team, validation of safety / health staff for the outside companies (about 90 people: 8 nurses, 15 safety supervisors and 60 security guards),
• Workforce peak: 4000 people for a total of 17 million worked hours,
• 12 800 000 worked hours without LTI – Tg = 0.0004 - Tf = 0.19.
-
ATEIM - Saint-Gobain Ain El-Sokhna - Egypt – Greenfield
- Safety, security and health manager
dampierre en burly
2008 - 2009
Invest: 125 Millions Euros
Achievements:
• Safety and Health Protection Site Manager during the VRD (driveways and various) and construction phases,
• Drafting, setting-up and coordination of the site safety organization (procedures, means and human),
• Recruitment of security personnel for the project, validation of safety / health staff for the outside companies (about 90 persons: 10 nurses, 15 safety supervisors and 65 security guards)
• Analysis and management of method statements and work permits,
• 780 000 worked hours without LTI Tf = 0 – Tg = 0.
-
ATEIM - Saint-Gobain Glass Călăraşi - Romania – Brown Field
- Safety, Health Protection and Security Site Manager
2007 - 2008
Investment of 44 Million Euros on a running site
Achievements:
• Construction of a flat glass treatment unit of Coater type for SAINT GOBAIN GLASS (245 000 hours)
• Safety and Health Protection Site Manager during the construction phase,
• Setting-up of the safety organisation (procedures, means and staff),
• Training and assistance to the exploitation safety director of the « Coater » and glass production site.
-
ATEIM - Isover Ploiesti - Romania
- Safety and Health Management during the rehabilitation phase
2007 - 2007
Investment of 30 Million Euros
Achievements:
• Setting in conformity for the final acceptance of a line producing a fiberglass insulating material,
• Safety and Health Protection Site Manager during the site/process transition phase,
• Setting in conformity of process facilities,
• Support for the reception of installations,
• Design of production data-sheets posts,
• 290 000 worked hours without LTI - Tf = 0.007 Tg = 0.0001.
-
ATEIM - Saint-Gobain Glass Călăraşi - Romania
- Safety, Health and Security Manager
2004 - 2006
Investment of 120 Million Euros
Achievements:
• Health and Safety and Security Manager for the project, tempering and operational transition phase,
• Drafting, setting-up and coordination of the site safety organization (procedures, means…),
• Recruitment of the Health team (1 Doctor - 10 nurses).
• Recruitment and training of the security staff (15 safety supervisors). Establishment of an access control and security means (70 guards, a guardhouse with badges control),
• Establishment of infrastructure, emergency, fire fighting, access to the site, nursery,
• Implementation of the training service for the project – 12.800 hours of training during the project,
• Training and support of the safety Director for the production,
• 2 700 000 worked hours – Tg = 0.06 Tf = 3.58.
-
ATEIM
- Safety Manager - Coodonator SPS L1
2004 - maintenant
-
Bureau Veritas, Nord Pas De Calais Agency
- Safety prevention expert in the field of the car industry - Projects Department,
1999 - 2004
Achievements:
• Long lasting mission of technical assistance and consulting on site dedicated to the car industry (Renault Douai, Maubeuge, Sevel-Nord…),
• Technical assistance to the external services in charge of new projects,
• Technical support for new Works (Mechanical plant of Valenciennes, Sevel-nord…) in user companies,
• Analysis, drafting and setting-up of procedures on revamping or new projects sites,
• Supervision of the prevention plans (decree of 1992, February, 20)
• In link with the various official organizations (Labour inspection, CARSAT, OPPBTP…),
• Studies on the working under particular environmental conditions:
Air contamination by high pulmonary bio persistent fibres,
Work in containment, height, or in the presence of high voltage…
-
ANS - Asbestos Neutralisation Systems
- Safety Manager
1998 - 1999
Achievements:
• Drafting of withdrawal plans for all sections,
• Relationship with clients, suppliers and authorities,
• Management and follow-up of asbestos scraps (choice and distribution in the classified dumps),
-
Cegelec, Euro Aspartam
- Safety supervisor
1993 - 1994
Greenfield - Construction of a synthetic sugar production unit – electrical batch
Achievements:
• Leading and coordination of safety actions,
• Technical assistance to the clients,
• Setting-up and follow-up of the conformity of facilities with hygienic and safety standards,
• Interlocutor of the official bodies,
• Managing of 24 people including a safety agent,
-
ENTREPROSE MONTALEV, EUROTUNNEL BUILDING SITE
- Safety organizer for the dismantling phase
1992 - 1993
Dismantling of the TBM (tunnel boring machines) T2 and T3 - Construction of the Channel Tunnel - The Shuttle - Eurotunnel
Achievements:
• T1 and T2 tunnel boring machine dismantling,
• Study, design construction and implementation of two cranes of Atlas type on railway platform,
• Reorganization and coordination of safety teams (management of 8 safety supervisors),
• Specific risks Trainer (high pressure cleaning, confined atmospheres, oxycutting...),
• Study and setting-up of fire fighting facilities,
• Checking of safety on fire protection equipments (extinguishers, fire hose reel, atmospheric analysis posts…),
• Fire fighting training (first and second intervention team-members).