Six-years’ experience as Planning Manager and Planning & Scheduling Engineer in the engineering and the construction of industrial gas plants for both Onshore and Offshore projects.

Experience of leading a Planning and Scheduling team on a turnkey Offshore EPC project within consortium with a foreign company.

Experience of an internationally financed, multi-currency, turnkey project valued more than USD 900 million, executed for a major international client within a multinational Project Team and with (non-)European working partners.

Able to interface and communicate on schedule management issues to different stakeholders and aware of the competitive business environment worldwide.

Extensive knowledge of work progress measurement and scheduling tools such as Primavera P6.

Mes compétences :
Project
Offshore
EPC

Entreprises

  • Technip - Planning Manager

    Paris 2011 - maintenant Mar 2012 – Feb 2013 Consortium (TECHNIP / DSME) Planning Manager

    DONG E&P, engineering, procurement, fabrication, construction, transport and hook-up of a manned, integrated wellhead platform for 5 HP/HT wells with 11,500 ton dry weight topsides, an eight-leg steel jacket substructure and living quarters for 70 people, in shallow water; Hejre field, North Sea, offshore Denmark.

    Developed and Controlled EPCC Schedule (3,700 activities for Level 3) including reviews with Project Stakeholders
    EPCC Earned Value Management
    Managed Consortium Planning team (3 Scheduling Engineers in TECHNIP / 1 Scheduling Engineer in DSME)

    Developed and approved Consortium-integrated Scope and Schedule Management plans
    Defined and agreed Engineering / Fabrication interface milestones
    Work performance measurement
    Performance reports production including status review meetings


    Sep 2009 – Feb 2012 Planning Manager – Multiple tenders for EPC contracts

    Develop EPC Schedule including reviews with Project Stakeholders
    Developed Schedule Management plans
    Participation to technical clarifications meeting with Client.

    Major assignments:

    DONG E&P, tender for engineering, procurement, fabrication, construction, transport and hook-up of a manned, integrated wellhead platform for 5 HP/HT wells with 11,500 ton dry weight topsides, an eight-leg steel jacket substructure and living quarters for 70 people, in shallow water; Hejre field, North Sea, offshore Denmark.

    UZ 750K – Islands Surface Facilities (EPC2), Zakum Development Company (ZADCO), UAE.
    EPC Tender for grassroots Process and Utilities facilities on 4 artificial islands, with maximization of modularization.

    PETROBRAS NETHERLANDS BV, EPC Tender for a floating LNG facility, in consortium with JCG and Modec, Technip being the leader of the consortium, Lula, Santos Basin, Brazil.


    Apr 2011 – Aug 2011 Planning Manager

    PETROBRAS NETHERLANDS BV, Pre-EPC project (engineering, procurement services and project management) for a floating LNG facility, in consortium with JCG and Modec, Technip being the leader of the consortium, Lula, Santos Basin, Brazil.

    Pre-EPC Contract consisted mainly in inquiring for Long Lead Items and Early Works for Process design.

    Developed simplified Schedule Management Plan for Pre-EPC follow-up.
    Developed and Controlled Pre-EPC Schedule.
    Work performance measurement.
    Performance reports including status review meetings.
  • Technip France - Planning & Scheduling Engineer