Menu

Abdessamad EL ADOUZI

PARIS

En résumé

Vaste expérience en Gestion de projet (Pétrole et Gaz, centrales thermique, Mines, Tuyauterie,structure,Mecanique).

Mes compétences :
Ressources humaines
Management
Métallurgie
Développement commercial
Ingénierie
Business development
Ing�nierie
Mechanical Installation
Project Execution
business management
budgets
Warehouses
Tank Erection
Quality Assurance
Project Management
Procurement
Onshore Oil & Gas
Offshore Oil & Gas
NGOs
Consolidations
Change Management
Broad experience
Assembly Plants

Entreprises

  • Friedlander (PNR - Congo Brazzaville) - Ortec Group - Sr. Project Manager

    2013 - maintenant Duties:
    * Evaluate technical and commercial risks and set awareness of the same in project team.
    * Definition and approval of execution strategy and validate contract & purchasing strategies.
    * Managing the provision of appropriate resources and expertise to successfully deliver the scope of work within budget, to programme, to agreed quality / specifications as per Contract.
    * Management and control of the Project responsibilities, incl. design as a part of the scope of works (SoW). Ensure HSE and QA/QC are given the highest priority throughout execution.
    * Ensure Construction and Commissioning activities are always managed effectively and safely.
    * Validation of Contracts and Amendments upon negotiation and agreement of T&C.
    * Enforcing Adherence to Contract Insurance Provisions for a Sound Risk Management.
    * Interface with Company representatives along with International and local Contractors.
    * Management of Claims: Avoidance and Settlement of the same whenever they arise. ;
    * Approval of Provisional and Final Acceptance Certificates in line with Contracts provisions.
    * Approval of Close-outs (incl. Back-Charges, Release of Guarantees & Retention Monies).
    Notable Contracts / Projects: TKLS (EPC Onshore, EPIC Offshore) and Open Contracts (on call).
    (Offshore: Loango, Djeno, Foukanda, Awa / Onshore: Mboundi Oil Center, KKL Oil Center).
    Approx. Budget of Managed Contracts: Up to US $100 Million.
    Achievements: Timely and within budget deliverables - up to 90% Business repetitiveness.
  • EIFFAGE - Project Manager & Country Manager

    Vélizy-Villacoublay 2011 - 2013 Project Manager / Country Manager (Industrial Plant - Renault Assembly Factory ).
    Duties:
    * Management of Multidisciplinary Multiple Projects at once incl.: Steel Structure made Facilities and premises and Mechanical Installations (Process Piping Works and Equipment packages).
    * Management of Constructions Managers, Contracts Mangers QA/QC and HSE Managers.
    * Review and approval of the annual budget for revenue, operating profit and operating cash flow.
    * Strengthening construction teams when required to avoid any serious slippage planning.
    * Finance management with P&L accountability and responsibility for managing legal entity.
    * Overseeing Proc. & Contracting: Calls for Tenders, TBE & CBE, Contracts Awarding.
    * Check and Approval of Cost Estimates and overseeing of multiple trades cost engineers.
    * Finalization / Approval of Contracts, Addenda: incl. Claims and Counter-Claims.
    * Review and Approval of Claims and Disputes Settlement Agreements.
    * Enforcing Adherence to Contract Insurance Provisions towards a Sound Risk Management.
    Notable Projects: Industrial Plant - Renault Assembly Factory (400'000 Vehicles /year)
    Achievements: Timely and below budget Project Completion (Spent: 11% less than Planned).
  • Ger2i-Maroc - Exclusively responsible business

    2011 - maintenant
  • EIFFAGE - Construction Manager & Associate Project Manager

    Vélizy-Villacoublay 2010 - 2011 Duties:
    * Management of Construction Activities (Piping, Pipe racks and mechanical installation)
    * Leading daily and weekly meeting with Site Engineers, Supervisors and Surveyors.
    * Review of site measurements and validation of the same to back-up valuations and changes.
    * Reviewing Site Reports completeness and consistency prior to forwarding the same to the PM.
    * Implementation of different solutions to optimize the pre-fabrication and Installation time.
    * Participation in technical alignment meetings with Client's Site Representative.
    * Requisition of the required manpower and materials towards a timely Mechanical Completion.
    * Management of interferences and putting in place solutions and alternatives
    * Review and approval of MTOs for tenders of outsourced / subcontracted activities.
    * Review of Construction organization chart and approval of construction team profiles (CVs).
    * Change Management: Review & approval of Variations (Scope, Budget & Schedule). ;
    * EPC Contract Packages Plans and Procedures: Preparation, based on Project requirements.
    Notable Project: Power Plant LASER MEGAJOULE THALES / CEA (BARP 33 - FRANCE)
    Achievements: Completion and start-up within budget and in line with Work Time Schedule.
  • EIFFAGE - Project Manager

    Vélizy-Villacoublay 2008 - 2010 : EIFFAGE / ETCM -
    (Heavy Structures and Mechanical Installations)
    Duties:
    * Approval of Project Execution Plan (PEP), Scope of Work and Project Schedule and Budget.
    * Management of all project phases, incl. Engineering, Procurement and Construction.
    * Accountable for financial and technical success of project delivery in timely manner.
    * Overseeing and monitoring project personnel equipments to avoid delays and deliver on time.
    * Fostering client's mission, vision and values while meeting safety and Quality standards.
    * Ensuring changes in scope of work and schedule are captured and manage properly.
    * Reporting to the Board of Management on project status (physical progress and billing).
    * Improvement of project cost effectiveness, applying rigorously change management principles.
    * Cost analysis, Budget Control, reporting and liaison with suppliers and sub-contractors.
    Notable Projects: Linde Gas Factory (azotes, oxygen and argon) - output 300 Tons / day.
    Flevo Power Plant - Revamping of Water Desalination System CEM BII à Bouillante
    Achievements: Structures and MEP install.: EUR 360 Million (Margin increase by 15%).
  • Eiffage - Regional Manager

    Vélizy-Villacoublay 2006 - 2008 : PROFIL TUBMECA - NORMANDIE -
    (Oil & Gas + Civil + MEP)
    Duties:
    * Leading local teams and managing resources to deliver timely and within budget projects.
    * Promoting company compliance with national laws, regulations and QHSE standards.
    * Strengthening Engineering, Procurement and Construction teams towards timely deliverables.
    * Management of annual budget for revenue, operating profit and operating cash flow.
    * Monitoring Business development plans to achieve the budget and strategic objectives.
    * Overseeing bid preparation by commercial team and managing senior customer relationships.
    * Ensuring the safe execution of the company's services to meet the customers' requirements.
    * Tender analysis of all construction packages inherent to numerous landmark projects.
    * Review and Approval of Schedules, Budgets and Claims (Construction & MEP Contracts).
    Notable Clients: Total Petrochemicals, Total Raffinage, Exxon Mobil NDM et Chevron Oronite.
    EPC Contracts: Piping and Steel Structures for LNG, Oil and Condensate Storage Facilities.
    Achievements: 15% Margin increase / Deliverables within Schedule and Budget Frames.
  • NORDON INDUSTRIES - Cost Estimator

    2004 - 2005 Duties:
    * Preparation of Tender Packages (Levels N1 and N2) and Invitations to Bidders.
    * Review and Analysis of Bids, Benchmarking and Selection of winning Sub-Contractors.
    * Compilation and Presentation of Technical-Commercial Offers to potential Clients / Companies.
    * Preparation of wide range of Cost Estimates from conceptual to detailed design for complex by developing project work breakdown structures, calculating complete scope of work take-offs, assisting contracts staff with statements of work for subcontractors and vendors.
    * Maintaining and updating Cost Database (rates), review and incorporation of historical data from purchase orders, subcontracts, productivity analysis reports and actual costs.
    * Review of design documents, proposals, specifications, drawings, attendance of engineering design development meetings, site visits and other duties as required defining the scope of work and inherent cost impacts.
    * Review bids, estimates, change orders and claims evaluation prepared by Contractors and preparation of subsequent feed-backs with appropriate comments and relevant corrections.
    * Maintaining Delay & Disruption records for EoT Extension of Time & Additional Payments.
    Notable Projects / Clients: George Besse II, Laser Mega Joule, Exxon Mobil, Total Raffinage.
    Achievements: Early delivery, 10% below budget (Budget at completion: US $ 200 Million).
  • NORDON INDUSTRIES - Construction Manager

    2003 - 2004 Duties:
    * Revamping of. ;
    * Implementation of the assigned Contracts, in accordance with the Project Execution Plan.
    * Adherence to Procedures on Safety and Quality Control within the man-hour and cost budgets.
    * Regular review of the project execution schedule developed by the Cost and Planning Department to ensure that Site and fabrication progress will be achieved in a timely manner.
    * Management and supervision of groups of engineers and supervisors assigned to the project.
    * Monitoring continuously and improving the group personnel's performance in all areas.
    * Ensuring that all changes affecting the contractual scope (SoW) are properly raised and recorded man-hours, costs and schedule impacts and transmitted to Contracts Manager.
    Notable Projects: Storage tanks and piping interconnections - Total Refinery of Donges - France
    Prefabrication and Installation of boilers and steam piping spools and loops EDF France - Corse.
    Achievements: Timely delivery, claimless and cost cutting (budget around $ 120 Million).
  • PONTICELLI FRERES - Fabrication Yard Interim Manger

    2002 - 2003 Duties:
    * Management of pre-fabrication of mechanical Oil &Gas spools and structures.
    * Monitoring and checking after own workforce and subcontractors teams on daily basis.
    * Reporting to the Project Manager on the works progress: Done against remaining to completion.
    * Attending site visits, notifying eventual punches and taking measures to clear them ASAP.
    Notable Projects: Total Refineries - Flandres, Gonfreville and Q8 Rotterdam ca. 120 EUR Million. Achievements: Timely completion without budget over-runs or shortfalls and client satisfaction.
  • ... - ..

    2000 - 2000 3éme prix Projet régional: thème porté sur la conception et réalisation d'une dégauchisseuse amortisseuse.

Formations

Réseau

Annuaire des membres :