Mes compétences :
Piping
Bill of Materials
P&ID
Technician Training
Solidworks
Petroleum
Performed supervision
PDMS
Gas Lift
Employee Training
CESAR
Autodesk Inventor
Autocad
Entreprises
Alpha
AUBAGNEmaintenant
MERI
- Projeteur Mécanique & Tuyauteur/Superviseur
2011 - maintenant
MERI
- Projeteur Mécanique/tuyauteur/superviseur
2011 - maintenant* Position : « Design Engineer » ;
* Company : « ALPHA-Engineering International » (Tunisia) ;
* Web Site : http://www.alpha-engineering.com.tn/ ;
* Field : Oil & Gas Engineering
2.1- TASKS PERFORMED BY PROJECT:
A - PROJECT : " REPLACEMENT TRAIN "
Company : PIONEER-TUNISIA Location : Waha Well Site Facilities
1. General Plot Plan
2. Piping & Instrumentation Diagram P&ID's
3. 3D Model
4. Isometric drawings
5. Bill of material
6. Piping & Instrumentation Layout
7. Lighting System Layout
8. Junction Boxes Layout
9. Cable routing layout
10. Earhing System Layout
B - PROJECT : " GAS LIFT "
Company : PIONEER-TUNISIA Location : Waha Well Site Facilities
1. Piping & Instrumentation Diagram P&ID's
2. Tie In List
3. Line list
4. 3D Model
5. Isometric drawings
6. Bill of material
7. Piping Arrangement Layout
8. Lighting System Layout
9. Junction Boxes Layout
10. Cable routing layout
11. Earhing System Layout
12. Supervision
C - PROJECT : " DJEBAL GROUZ-OIL CENTER RELOCATION "
Company : ENI-TUNISIA Location : Oued Zar
1. 3D Model
2. Isometric drawings
3. Bill of material
4. Piping Arrangement Layout
D- PROJECT : " SURGE TANK BLANKETING SYSTEM "
Company : TPS-TUNISIA Location : Cercina Sfax
1. 3D Model
2. Isometric drawings
3. Bill of material
4. Piping Arrangement Layout
E- PROJECT : " TRIGENERATION POWER PLANT "
Company : PARENIN-TUNISIA Location : Enfidha Airport
1. 3D Model
2. Isometric drawings
3. Bill of material
4. Piping Arrangement Layout
5. Tie-In List
6. Line List
2009 - 2011* Position : «Lead Mechanical Piping Designer » ;
* Company : « Mondiale des Etudes et Réalisations Industrielles » (Tunisia) ;
* Web Site : http://www.meri.com.tn/ ;
* Field : Industrial Engineering & Construction
3.1- TASKS PERFORMED BY PROJECT:
A- PROJECT : " UNITE DE SUPPRESSION F4 "
Company : 5éme SAISON-TUNISIA Location : Chott El Fejij
1. 3D Model
2. Isometric drawings
3. Bill of material
4. Piping Arrangement Layout
B- PROJECT : " POSTE DE CHARGEMENT HYDROCARBURE "
Company : SHELL-TUNISIA Location : Dépôt Rades
1. 3D Model
2. Piping & Instrumentation Diagram P&ID's
3. Isometric drawings
4. Bill of material ,