Menu

Adel MECIAD

Montigny-le-Bretonneux

En résumé

Mes compétences :
4G Networks
Calibration
Project preparation
Daily work planning
Solenoids
Quality Control
P&ID
Microsoft Word
Microsoft Windows XP
Microsoft Windows 7
Microsoft PowerPoint
Microsoft Excel
MicroStar International
Leak Testing
Control Circuits

Entreprises

  • Saipem - Qa qc

    Montigny-le-Bretonneux 2013 - maintenant
  • ENI - QA- QC Inspector Instrumentation

    Lyon 2012 - 2013 Detaille post:

    - Preparation of project documents database, daily work planning, coordination with subcontractors, client representative and equipment suppliers. ;
    - Participation in the meeting for updates and problems with the seller and engineers regular customers project. ;
    - Running test and calibration of the inspection control valves and on-off valves. ;
    - The inspection instrument calibration. ;
    - Inspection loop test - help the main contractor and client activity loop test inspector.
    - Final exam folder loop with an emphasis on the location of the instrument, instrument location diagram and piping and instrument diagram.
    - Involved in clearing punch list before final delivery to pre commissioning group.
    - Construction activities of monitoring and measurement site security
    - Monitoring reports and non-compliance are not accepted on the side of the building to carry out checks practices.
    -Completion of final data and documents for final acceptance.
    -Supervise cabling junction boxes and panels on control rooms, control loop checking.
    -Site Acceptance Test (SAT) of HONEYWELL DCS, ESD, FGS, Bentley Nevada PLC and Nuevo Pignone compressor PLC.
    -Involved in the inspection of smoke detectors,break glass units,H25 detectors,fire alarm systems and station safe
    guarding systems.
    - Inform systemically to the QA-QC manager on the progress of the site activities relating to quality and assist in
    preparing the supporting quality documentation required to issue the mechanical completion certificate and loop
    release
  • ENI - QC engineer

    Lyon 2011 - 2012 Site: Saipem MLE PROJECT CPF (Central Processing Unit). BLOCK 405B, MLE Illizi Algeria

    position: QC engineer

    Detaille post:

    Able to analyzed every area to be survey and witness prior for RFI to be offered

    to the main client for inspection.

    - Inspection of the final installation of the instruments.
    - Impulse line installation and inspection of leak test.
    - The installation of the airline and leak test inspection
    - Responsible for monitoring the finished work of the construction side in terms of quality and level of project.
    - Inspection work which include control raceways and its supports, JB installation support and proper installation.
    - Followed by dressing appropriate cable routing based on specific drawings
    - Followed dressing current cable entry panel.
    -Inspection and testing of primary and secondary cables (IR and continuity check)
    -Installation Inspection JB before correcting termination of cables to the terminals of the instrument
    - Dimensional control panels before the seller drawings Cabinet
    - Facility Inspection issuers in respect of its points taken before project and specification.
    - Inspection gland and termination of cables from the instrument to JB.
    - Inspection facilities valves regarding its correct orientation with particular emphasis to the direction of flow of the valve ..
    - Installing the Impulse line before drawing instrument hook and includes tests of pipe leak air.
  • Kraytem GTC - Supervisor instrumentation

    2011 - 2011 Revision of power plant A combined cycle 1227MW Hadjret enas TIPAZA
    position: Supervisor instrumentation

    Detaille post:

    Installation and termination of junction boxes.
    Installation of the instrument (solenoid, flame detector, UV sensor, flow transmitter ...) at the site and gas turbines GE / Nuovo Pignone
    Testing and calibration of transmitters (PRV, temperature, level, pressure and flow).Essai de soupapes : test de course (ESDV, BDV, FV et UV).
    Termination of the instrumentation panel: . . . . . (DCS. ESD FGS UCP BMS MMS FACP.
    Installing cable tray and cable tension.
    Installation of primary and secondary cables and earthing..
    Installation of all electrical systems (lighting, the connection and the end of the motor) for turbine GE / Nuovo Pignone.
    Installation warrior and test high-voltage electrical energy.

Formations

  • University Of ORAN (Oran)

    Oran 2003 - 2008 State engineer instrumentation

    : industrial instrumentation.
    institute: MSI, (EX : IAP)

    Final project study: Communication between industrial equipments depending on the fiber Optic..

    internship in the industrial area of SONATRACH (refinery) of Skikda, project preparation for graduation. (6 months).
  • Technical School (Skikda)

    Skikda 2000 - 2003 Bachelor of Electrical Engineering

Réseau

Annuaire des membres :