Menu

Azzeddine CHAHED

CASABLANCA

En résumé

With well over 20 years experience specializing in Project & Construction Management for prestigious clients and multinational companies. with strong field and cost management experience and the ability to manage subcontractors and equipment with the assurance of a safe and quality results. Extensive experience within Mixed-Use Development Projets in energy, building, mechanical, electrical & water/air treatment.
Outstanding ability to direct a team of field engineers for project controls, quality assurance, craft supervision, material expediting, and all other project administration including planning, scheduling, health and safety programs, and purchase agreement administration.


Mes compétences :
5S
Bonnes Pratiques de Fabrication
Sécurité
TPM
Gestion des projets
Facilities management
Direction technique
Leadership
Traitement de l"air
Energue renouvelable
Traitement des eaux usées
Traitement des eaux

Entreprises

  • ST MICROELECTRONICS

    maintenant
  • Confidentielle - Project Manager

    2013 - maintenant • Company Projects Management: Design, costing, planning & Projects Implementation.
    • Ensuring timely and net margin projects
    • Designing and installing a manufacturing line of Monocrystalline PV modules (capacity: 10 MW/year).
    • Design and construction of three photovoltaic stations (30 kW, 380V ).
    • Design and construction of 20 solar pumping station.
  • Label' Vie S.A - Technical Manager

    Rabat 2012 - 2013 • Oversee all on-sites project activity to ensure projects are completed on schedule, within budget, and in accordance with engineering design.
    • Perform inspection of construction activities to ensure conformance with approved designs/plans.
    • Coordinate and communicate between field, designers and client.
    • Obtain approvals and permits for new jobs.
    • Approve sub-contractor and vendor invoices.
    • Ensure that construction plans are in agreement with customer expectations and identify points at which contractual obligations will have been met.
  • TSYPROM - Project Manager

    2008 - 2012 • Took corrective action as needed during projects and/or consulted with construction project manager to resolve issues arising during projects.
    • Oversaw subcontractors and vendors/suppliers performing work on the project.
    • Prepared site inspection/oversight reports documenting the progress to date.
    • Scheduled inspections.
    • Coordinated proposed changes in design with consultants and construction manager while maintaining schedule and budget.
    • Reviewed, recommended and approved all construction change requests, on-site change orders and pay requests.
  • ST MicroElectronics - Facilities Manager

    1994 - 2006 • Electrical, piping, building, DI water treatment, waste water treatment, mechanical maintenance management;
    • Electrical, piping, building, DI water treatment, waste water treatment, mechanical new projects management;
    • Technical purchases optimisation;
    • POWER & GAS reduction project management;
    • Some projects:
    i. Water treatment unit construction project manager (Deionized Water, 18 MoHM & 30CM/H).
    ii. Chilled Water unit construction project manager (8 MW).
    iii. Nitrogen unit construction manager (FLOXAL TYPE, 1000 NCM/H, 98%).

Formations

  • Ecole Superieure De Technologie (Casablanca)

    Casablanca maintenant
  • Université Internationale De Casablanca UIC (Casablanca)

    Casablanca 2015 - maintenant Executive MBA
  • Ecoles Des Mines De Nantes

    Nantes 2002 - 2005 ingénieur d'état

Réseau

Annuaire des membres :