KBR Inc
- Piping supervisor
2009 - 2011
- In load of the deviation of the feeder gas line of the Project mega-train LNG.
Prefabrication of the new line, followed NDE, installation, ties-in (hot-topping), tests hydrostatic.
- Installation of all the networks underground:prefabrication and installation of the networks of drainage, fire protection network, (oily water HDPE.)
- followed prefabrication of the aboveground piping of the project in Hassi Messaoud and Skikda.
- Supervision of the installation of aboveground piping in the various units of project LNG MEGATRAIN SKIKDA.
-
CPECC China petroleum construction group
- Piping Engineer
2007 - 2008
since AUG-2007
In load of the control of Process systems, utilities and interconnections,
welding of the piping of the various units of the refinery:
Storage systems:condensas, kerosene, LGO, HGO, spheres butane storage.
- Responsible for the welders qualification of the.
- Follow-up and quality control of all the underground system:(drainage, used water, fire protection network (oily-water system) road crossing, control of trenches , installation of the manholes, leak-test, coating and tests.
Follow-up of the recordings Interface quality with the Owner for the daily-report and Follow-up NDT.
Preparation of the hydrostatic tests.
Mechanical- clearance, establishment of the punch-lists.
NDT-clearance, ?controls NDT, RT, Pt, (pwht, hardness).
-
BENTINI CONSTRUCTION Italia
- QA/QC
2006 - 2007
Since AUG-2007:
BENTINI CONSTRUCTIONS ITALIA.
PROJECT SP2 BISKRA
( construction of oil and condensat pumping station )
Position :QA/QC
In load of quality for the construction of the pumping station SP2. Biskra
Follow-up of quality for the installation of the rotating and static equipment.
Control welding of the networks piping.
Follow-up quality of buildings, control room, HVAC, electricity, instrumentation.
Interface of the building owner as regards quality control.
Interface mines inspectorate (DMI, DPP) for the hydrostatic tests.
2006:
BENTINI CONSTRUCTIONS ITALIA.
PROJECT SP3 MSILA ALGERIA
( construction of oil and condensat pumping station )
Position :QA/QC
- Follow-up of the prefabrication of the piping of station SP3 of Me SILA.
Quality control and of conformity of the delivered material.
Follow-up of the quality of construction of the storage tanks .
- Qualification and followed welders.
- Follow-up of the assembly of pipings.
-
ENGTP
- QA/QC
2005 - 2006
QA/QC Responsible.
In CHARGE with the SNC-lavalin building site for construction for the POWER STATION CYCLE COMBINES 825 MW SKIKDA.
Management of the quality control according to the procedures, the methods of the customer and standards' of the project.
And installation processing control of the systems of pipings.
Control installation of the equipment (chimneys, exchangers, heaters, metering - skid (system of gas counting), various other equipments.
- Coordinates supervisors QC
The engineer welding
Inspectors of welding.
Activities NDT related to welding:(visual inspections, RT,PT, hardness tests.)
monitore the quality assurance: (management of materials - tracability - , the rods, filler, furnaces of cooking, maintenance, the foot-warmers, the quality of gases of protection (argon)
- the equipments used:welding equipments, power generating units machines and materials for the heat treatment.(PWHT) as well as the various testing devices and their calibrations.
-
SONATRACH ENIP PETROCHEM
- Maintenance engineer/ head of office insp & controle
1975 - 2004
1989---2004 HEAD OF OFFICE MAINTENANCE /INSPECTION & CONTROLE.
within the central management technique, in charge for monitoring the maintenance of various units over industrial complexes. incident tracking techniques, audits, debottlenecking.
1985---1988 MAINTENANCE ENGINEER
-implementation of preventive maintenance programs for units ethylne, polyethylene, chain-plastic, utilities etc ...
-preparation, planning and implementation of annual work stops.
-responsible for the renovation of the effluent treatment unit.
-charge of revamping the section liquifaction chlorine (unit: chlor-alkali)
1982---1984 TRAINING ENGINEER
1979---1981 SONATRACH Division (PGR) PETROCHEM GAS REFINING
finishes construction-work-commissioning verification rotating equipments, flushing lignes.-preparation-start assistance teams process
1975---1978 SONATRACH Division engineering & development
Mechanical supervisor
CMPS project;construction of the complex plastics of skikda.
WITH CONSTRUCTOR T.E.C (Toyo Engineering Corporation Ltd) JAPAN.
Follow-up of the assembly of the rotating equipments, the infrastructures of hydrant of sea.
Follow-up of the construction of storage spheres of chlorine.