2011 -today : Proposal Manager - Cockerill Maintenance & Ingénierie :
- In charge of the proposal department
- Support of the sales manager
- Member of the strategic committee
www.cmigroupe.com
__________________________
2008 - 2011 : Project Manager - De Smet Engineers and Contractors :
- Vice-President Biomass & Energy
- offer preparation for oil, sugar and biomass EPC turnkey plants
- business development in biomass
- member of the executive board
___________________________
2006- 2008 CMI HRS (boilers) : Project Manager :
- Turn key power plant boilers - HRSG - (2 units) leader in the consortium with Skoda. (250 MW - 30 Million €).
- Turn key power plant boilers - HRSG - (2 units) leader in the consortium with Initec. (250 MW - 62 Million €).
___________________________
2001-2005 CMI Defence : Configuration manager. Managing a team of 5 persons. Responsible for the configuration of all the CMI Defence products. In the meantime project manager for the product Lifecycle management IT implementation in the company (all services involved)
____________________________
1999-2001 CMI Defence :
Project Manager (contract 250 Million €) with GDLS Canada. Team leader of a task force.Array
____________________________
1998 Hamon Thermal : Project manager :
Air cooled Condenser (ACC)(300 MW – 8 Million USD) in consortium with Mitsubishi Heavy Industry , in Singapore (project and site manager for 6 months in Asia). Project Manager for installations in USA and Taiwan (in consortium with Bechtel USA).
www.spx.com
_____________________________
1997 Hamon - Lummus : Project manager :
Contract : turn key ACC (30 MW – 2 Million USD) : ABB Nürnberg, Germany
Contract : turn key ACC (42 MW – 2,3 Million USD) INDAVER, Belgium
______________________________
1995-1997 Hamon-Lummus Commissioning engineer :
commissioning - start up – performance tests – training of :
2 ACC in the Netherlands (ABB Stal – Sweden) 2 x 50 MW
1 ACC in Belgium (Indaver – Belgium) 42 MW
1 ACC in Germany (ABB Nürnberg – Germany) 30 MW
______________________________
1993-1995 NESA - Union Minière Group
Project engineer :
Automatisation of the pilot station : 5 Furnaces – Belgium (100 000 USD)
Contract of 2 Furnaces in Belgium (300 000 USD)
System engineer : Design and realisation of one DCS system for a prototype : sludge dryer for waste water cleaning plant. From basic design to commissioning with Degremont in France, Dijon)
www.nesasolution.com
Mes compétences :
Biomass
Directeur de projet
Energie
Energy
EPC
Management
Manager
Microsoft Project
Organisation
Renewable energy
Décence - systèmes terrestres
Offres - contrats