Menu

Bertrand SAGARDILUZ

BORDEAUX

En résumé

9 full lifecycle SAP implementation projects: blueprint, built, cutover, go-live, and support.
Expert knowledge of Order-to-cash (SD, LE), Procure-to-pay (MM, IM), Logistics (LE, WM), Remote Logistics Management (RLM).
In-depth design and configuration skills of Quality Management (QM), Plant Maintenance (PM), Project System (PS), and cross-applications functionalities (Master Data, Batch, Classification, EDI, LIS, Queries, LSMW, etc…).
Full official SAP training curriculum of S/4 HANA Enterprise Management On-premise Edition (13 courses).
Experienced in Project Management.
Experienced in international projects: Denmark, UK, China, Canada, France, Spain.
Experienced in SAP Industry Solutions: Oil & Gas (upstream); Discrete Industries & Mill Products.
Industry Experience: Oil & Gas, Computers, Paper, Construction, Retail & Distribution (building materials; decoration goods); Waste Treatment, Manufacturing (building materials , shooting materials, textile, plants, gas and water appliances, automotive components; parking equipment)

Mes compétences :
Logistics
SAP
SAP IS
SAP IS Oil
SAP MM
SAP PS
SAP SD
SAP S/4 HANA

Entreprises

  • ENGIE E&P - SAP Solution Architect/ SCM & Logistics Consultant

    2017 - maintenant Greenfield project of SCM & Logistics solutions (RLM / LE / WM / PM / QM) for ENGIE E&P Netherlands. Conception, blueprint.
    Support and improvement of SCM & Logistics solutions (RLM / LE / WM / PM / QM) for ENGIE E&P Norway , and ENGIE E&P UK
  • Maersk Oil (Copenhagen - Denmark) - SAP SCM/RLM Solution Architect & Consultant

    2014 - 2016 Design, configuration, go-live, and support of SAP SCM & Logistics solutions (RLM / LE / WM / PM / QM for Maersk Oil BU’s (Denmark, UK, Qatar, Angola, Kazakhstan)
    Remote Logistics Management (RLM): Packing, Shipping, Returns, Rentals, Voyage Management Information System (VMIS), integration with Plant Maintenance (PM).
    Logistics Execution (LE)
    Quality Management (QM)
    Warehouse Management (WM)
  • GDF-SUEZ E&P UK (Aberdeen,UK, www.gdfsuez-energy.co.uk) - SAP MM/WM/RLM Solution Architect

    2012 - 2014 In charge of the design and implementation of the SAP Logistics Management (ECC6), including:
    SAP Plant Maintenance (PM) & Interface with Maximo: for maintenance & operations.
    SAP IS Oil Remote Logistics Management (RLM): Packing, Shipping, Returns, Rentals, Voyage Management Information System (VMIS)
    SAP PS Network (PS): for Drilling.
    SAP Logistics Execution (LE): Shipping & Transport
    SAP Warehouse Management (WM)
    SAP Quality Management (QM)
  • Lenovo (Beijing China, www.lenovo.com) - SAP SCM (SD/MM/LE) Solution Architect

    2011 - 2012 In charge of the localization for Western Europe countries roll-outs. ECC6 (EP5).
  • Bell Canada (Createch Group) (Montréal, Canada, www.groupecreatech.com) - SAP Logistics Consultant (SD, MM)

    2010 - 2011 In charge of the design and configuration of the SD & LE modules (ECC6) in a full life cycle SAP implementation for CASCADES, leading Canadian company of the paper industry (http://www.cascades.com/). Project led by SAP Canada.
  • TOTAL Exploration & Production (Pau, France; www.total.com) - SAP MM/PS Project Manager / Upstream IS Oil Consultant

    2008 - 2010 In charge of leading the implementation of enhancements of the Supply Chain Management module for overseas subsidiaries (Angola, Nigeria, Russia, Canada….) and the configuration of the Remote Logistics Management (RLM) functionalities. Lead on the PS module Total E&P template implementation.
  • Seidor Consulting - SAP Logistics Consultant (SD, MM, PS) / SAP Project Manager

    1999 - 2008 February 1999 – June 2008
    SEIDOR Consulting (Barcelona, Spain; www.seidor.es)
    Best SAP Business Partner Worldwide in 2003 and 2004. Spain number one SAP Value Added Reseller since 1999.
    SAP Project Manager
    SAP Logistics Consultant (SD, MM, PS)

    Projects:
    LEON GROSSE (Aix-les-bains; France ; www.leongrosse.fr) ; 09/06 – 06/08
    Major French building construction company (4th in the French ranking); 300 users; 30 companies; Version 6.0; Full life cycle implementation project. Go-live: 08/07. .
    Project Manager. SD, MM, PS, CO (ECP, PCA, CCA), DPC, BI Consultant
    SOPENA, (Valencia, Spain; www.gruposopena.com); 11/04 – 09/06.
    Manufacturing and distribution of materials for construction; 40 users; Version 4.7; Full life cycle implementation project. Go-live: 05/06.
    Project Manager. SD, MM Consultant.
    IBERSEGUR/MABYC (Barcelona, Spain; www.ibersegur.es); 03/04-09/06
    Manufacturing and distribution of material for parking; 30 users; 3 companies; Version 4.7; Roll out project. Go-live: 01/05.
    Project Manager.
    TIRME (Majorca, Spain; www.tirme.com); 10/03 - 09/06.
    Urban waste treatment of Majorca Island. Power Station. 40 users; Version 4.6C; Full life cycle implementation project. Go-live: 09/04.
    Project Manager. SD, MM, CO Consultant.
    SEDAL (Barcelona, Spain; www.sedal.com); 03/04 - 09/06
    Manufacturing of water mixers. Supporting project.
    Project Manager.
    GAMO (Barcelona; Spain; es.gamo.com); 03/02 – 03/04
    Manufacturing and distribution of goods and clothing for shooting, textile products, plants and flowers; 5 companies; 50 users; Version 4.6C; Full life cycle implementation project. Go-live 01/03
    Team Manager; SD, MM, WM Consultant
    KROMSCHROEDER (Barcelona, Spain; www.kromschroeder.es); 03/01- 03/02
    Manufacturing and distribution of gas meters and gas heating appliances; 20 users; version 4.6B. Full life cycle implementation project. Go-live: 01/02
    SD, MM Consultant
    GKN AYRA (Barcelona, Spain; www.gknayra.com); 07/00-03/01
    Manufacturing and distribution of spare automobile parts; 15 users; Version 4.0; Full life cycle implementation project. Go-live: 01/01
    SD, MM Consultant
    ARANCE (Seville, Spain; www.arance.com); 04/00-07/00
    Retailer of material for construction.
    SD Consultant.
    IDEAL FLOR. (Barcelona, Spain; www.idealflor.com); 02/99-04/00
    Importation and distribution of goods for decoration; 15 users; Version 3.1I; 3 companies; Full life cycle implementation project. Go-live: 01/00
    SD, MM Consultant.

Formations

Réseau

Annuaire des membres :