Menu

Châaben AYACHI

PARIS LA DEFENSE

En résumé

My name is chaaben, i'm married and i have two daughters.
I was born in kairouan, Tunisia in 1969. I'm engineer in electricity and i have 20 years experience as technical manager.
My hobbies are football and listening music
My bic objective is to do my professionnal duty and support my family.

Mes compétences :
Able to manage any technical process

Entreprises

  • Visteon - Building Maintenance & Utilities Manager

    PARIS LA DEFENSE 2014 - 2016 Building Maintenance:
    The principle objective is to manage the maintenance of all areas in the plant (plan and follow-up the built of new areas, repair the compounds of areas (wall, floor, roof, doors, paint, lighting, sanitary parking…….)
    Manage and implement new projects
    Utilities:
    Manage and provide technical support as required for delivery of all utilities to support the manufacturing (Provide the electric power distribution, water, compressed air, vacuum system, Nitrogen, air conditioning system, sprinkler system, phone system.........)
    Energies:
    Responsible of the follow-up and the implementation of all projects related to the consumption of Energy and fluids (generate the dashboard of energy and fluids consumption).
    Security and alarm systems:
    Responsible of the implementation, maintenance of all security equipments (fire security, CCTV system....)
  • Johnson Controls - Utilities & Building Maintenance Manager

    Colombes 2008 - 2014 Building Maintenance:
    The principle objective is to manage the maintenance of all areas in the plant (plan and follow-up the built of new areas, repair the compounds of areas (wall, floor, roof, doors, paint, lighting, sanitary parking…….)
    Manage and implement new projects
    Utilities:
    Manage and provide technical support as required for delivery of all utilities to support the manufacturing (Provide the electric power distribution, water, compressed air, vacuum system,
    Nitrogen, air conditioning system, sprinkler system, phone system.........)
    2.2.3 Energies:
    Responsible of the follow-up and the implementation of all projects related to the consumption of Energy and fluids (generate the dashboard of energy and fluids consumption).
    Security and alarm systems:
    Responsible of the implementation, maintenance of all security equipments (fire security, CCTV system......)
  • Johnson Controls - Technical manager (methods of maintenance)

    Colombes 2005 - 2008 The principle objective is to implement a maintenance management system using the
    “Computerized Maintenance Management System” database. This system is including the principle chapters as preparing a maintenance plan (Prepare an asset inventory, Identify maintenance activity and tasks, Identify the frequency of the task, Estimate the time required to complete the task, Develop an annual work schedule, prepare and ensure a work order, determine a Budget), work Scheduling, completing Work Orders, managing a Maintenance Budget
  • Sotubi - Technical manager (methods of maintenance)

    2003 - 2004 The principle objective is to implement a maintenance management system using the
    “Computerized Maintenance Management System” database. This system is including the principle chapters as preparing a maintenance plan (Prepare an asset inventory, Identify maintenance activity and
    tasks, Identify the frequency of the task, Estimate the time required to complete the task, Develop an annual work schedule, prepare and ensure a work order, determine a Budget), work Scheduling, completing Work Orders, managing a Maintenance Budget
  • Gipa poulina - Technical manager (methods of maintenance & maintenance manager)

    2000 - 2003 The principle objective is to implement a maintenance management system using the
    “Computerized Maintenance Management System” database. This system is including the principle
    chapters as preparing a maintenance plan (Prepare an asset inventory, Identify maintenance activity and tasks, Identify the frequency of the task, Estimate the time required to complete the task, Develop an annual work schedule, prepare and ensure a work order, determine a Budget), work Scheduling, completing Work Orders, managing a Maintenance Budget
  • Poulina holding - Audit and quality insurance

    1995 - 1999

Formations

  • ISTIM GAFSA (Gafsa)

    Gafsa 1991 - 1995 Engineer

Réseau

Annuaire des membres :