Menu

Chafik CHERGUI

KHENCHELA

En résumé

Mes compétences :
Quality Control
Quality Assurance
Mechanical Completion
tests pack preparation
Microsoft Word
Microsoft PowerPoint
Microsoft Excel
Dimensional Control

Entreprises

  • ANSALDO energia - Superviseur Mécanique

    2013 - maintenant
  • ANSALDO energia - Supervisor mechanic

    2013 - maintenant superviser le montage de la tyuauterie (piping)
  • SARPI - Ingénieur mécanique

    nanterre 2012 - 2013 : Function: mechanical engineer quality control QA/QC
    Société Algérienne de Réalisation des Projets Industriel.

    -Project : HBK Haoud Berkaoui Ouargla SONATRACH
    PROJECTDETAILS:
    - Recuperation of gases wiped and instrumentation of the production centers
    Skills detail:
    tests pack preparation and follow-up the hydrostatic tests
  • SARPI - Ingénieur QA\QC mécanique

    2011 - 2012 test hydrostatique, test pack
  • SARPI - Ingénieur mécanique

    nanterre 2011 - 2012 Project : CPF MLE : « MENZEL LADJMET EAST PROJECT » ( SAIPEM)
    PROJECTDETAILS:
    -CPF (ferries, spheres, metallic framework, mechanical facilities)
    Skills detail:
    -Preparation of the tests pack and follow-up of the hydrostatic tests
    -Preparation of the mechanical completion files
    -Receipt of gear mechanics, electric equipment, framework
  • QC Society - Ingénieur mécanique

    2008 - 2011 : Function: mechanical engineer quality control QA/ Entreprise Nationale des Grands Travaux Pétrolières
    Project : HBNS Hassi berkine
    PROJECTDETAILS:
    - Installation of surface and adjusting of the wells layer of Hassi berkine ANADARKO
    Skills detail:
    - Dimensional control of the piping and final receipt ;
    - Inspection and receipt of the sanding works and painting of the tubing ;
    - consistent of the works of welding and programming of the NDT ;
    - preparation of the mechanical completion files ;
    - punch list and follow-up the works of coating and electric broom ;
    - to establish the ITR (hydrostatic test, coating, blowing, )
  • ENGTP - Ingénieur QA/QC mécanique

    2008 - 2011 Piping préfabrication et montage, peinture et revetement, test hydrostatique, structure métallique

Formations

Pas de formation renseignée

Réseau

Annuaire des membres :