Menu

Eliott ANTONIO

Montigny-le-Bretonneux

En résumé

Pas de description

Entreprises

  • SAIPEM-SA - Electrical Superintendent

    Montigny-le-Bretonneux 2010 - maintenant
  • ETDE DI - BOUYGUES CONSTRUCTION - Ingenieur Contrat/Planning/Coordination

    2009 - 2010 December 2009 : Projet THT - Ingénieur contrat
  • ETDE DI/ BOUYGUES CONSTRUCTION - Project manager

    2008 - 2009 Project Manager (Ventilation, Fire Detection and Protection on the subway in Santo Domingo)

    December 2007: Project management of the project and local subsidiary with an average number of (2 expatriates, 6 administrative people and 45 local workers)

    • Ventilation :
    Mechanical and electrical installation (civil works excluded) of 11 extraction units inside tunnel with for each extraction units:
    2 air fans for the mechanical extraction of the tunnel (with variable speed drives with for each fan a nominal air flow of 200000 m3/h and a total pressure of 680Pa.
    Temperature, humidity and air flow sensors, lighting, earthing protection.
    Acoustic treatment
    Communication loop via fiber optic to the SCADA.

    • Fire Detection
    Complete installation of the fire detection of the 16 stations, control room building (4floors), maintenance workshop, diesel emergency room building and substations.

    • Fire Protection
    Complete installation of the fire protection network of the workshop area and control room building (fire pumps, piping, sprinklers…)
  • SAIPEM SA - Ingénieur Electricité

    Montigny-le-Bretonneux 2002 - 2007 WORK EXPERIENCE

    September 2006: Lead discipline on BRASS LNG U&O Project (BID). NIGERIA
    • Reading, checking and validation of projects documents (Specifications, datasheets…)
    • Issue of MTO of main & secondary equipment
    • Follow up of the project as lead discipline

    August 2005: Chief electrical COMMISSIONING Engineer on GUANGDONG Project CHINA
    • Redaction of electrical procedures for commissioning.
    • Tests, Troubleshooting, validations of procedures and start up of the whole plant
    • Set up of LV and HV protective relays.
    • Management of a mix team (Filipino and Chinese) - (technical and safety points)

    October 2004: Zeebrugge Project BELGIUM
    • Design of slab heating system of LNG tank.
    • Power balance and consumer list.
    • Technical Bid Evaluation(Transformer/Heating System)
    • Issue of Specifications and Requisitions.


    June 2003: Guangdong LNG Receiving terminal CHINA
    • Creation and updating of power balance.
    • Follow up of UPS and battery chargers.
    • Mission in Beijing (2 weeks) as electrical supervisor at sub contractor office.
    • Issue of transformers datasheets(HTB/HTA et HTA/BT)
    • FAT of an autotransformer for Hazira Project

    June 2002: YOHO EPC2 Project NIGERIA
    • Follow up of Electrical consumers, creation and regularly updating of power balance (load study).
    • Follow up of Navigational aids package.
    • Follow up of UPS and battery chargers.
    • Factory Acceptance Tests (FAT) of UPS and battery chargers.
    • FAT of 4.16kV switchgear and two 480V Motor Control Centre.
    • Mission at Appleton GE (Wisconsin) to validate an instrument air compressor.
    • Checking of supplier’s documents.

    PROJECTS

    February – August 2001: AIR LIQUIDE WELDING FRANCE
    • Study of the waveforms of a welding power supply by a Digital Signal Processor
    April – July 2000: NITRUVID FRANCE
    • 50 kW power supply dedicated to a plasma oven
    February – June 1999: ESIEE – Amiens FRANCE
    • Control / Command of the water level of a tank.
    July 1996: EDF-GDF (West Indies) FRANCE
    • Work experience

Formations

Réseau

Annuaire des membres :