Emile TERMOZ

London

En résumé

Des décennies consacrées à l'énergie et "Oil & Gas". Dans les groupes TECHNIP , ALSTOM et TOTAL E&P. Construction, Precom,Commissioning. Dans le monde entier: Afrique/Asie/Pacific/Moyen Orient/Amérique. Bon cursus également en Assurance Qualité et Expertises, réception chez les fournisseurs, expéditions. Pour: Mécaniques, Machines tournantes,Electricité,Instrument. Plus de 30 ans d'expérience.

Mes compétences :
HAUTE TENSION/ALTERNATEUR/TRANSFOS/MOTEURS
compresseurs ,câbles HT ,sous marins,connections.
Assurance qualité.Contrôle qualité;
Aide à l'élaboration de plans qualité.
Offshore Oil & Gas
FPSO
Quality Control
Low Voltage
Wellheads
Gas Compressors
Antennas
cranes processing
Transformers
Steam Turbines
Steam Cracking
Siemens Hardware
SPP
Rotating Equipment
Power génération management
Power Inverters
Petroleum
Petrol
Oncology
Joint Venture
Hangars
Gas Lift
For ALSTOM management
Electrical Maintenance
Cranes
CA-Datacom
Audit
Air Compressors
4WD

Entreprises

  • BALFOUR BEATTY - QUALITY COORDINATOR/Forecasting and planning

    London 1990 - 1993 /SPIE BATIGNOLES J.V. Channel tunnel project French side inspection: 15 Inspectors for 50 visits per week in manufacturing places of
    equipment both in Europe and U.S.A.: electrical and catenary system. Kick off meeting organisation. Assessment audits. Inspection& survey of 3500 deliveries. Official laboratories approval items: cables/resin cable trays/ lighting/corrosion treatment/etc.
  • TECHNIP - Electrical supervisor

    Paris 1989 - 1990 plant AL ZUBAIR near BASRAH IRAK Diagnosis report up-grading .Rehabilitation, commissioning and start-up of all electrical components of the ``Cocooning'' gas plant.
    Included 2 imported 33KV supply. Main transformers33/13.6KV 0.4KV/HV cells/oil immersed breakers. Vacuum contactors. HV
    Asynchronous motors high power 5MW. Inverters Merlin Gerin .Batteries and chargers CHLORIDE/COREDEL.
  • TOTAL E&P - Electrical supervisor

    1986 - 1988 Quality Ctrl involved in pre-commissioning and start-up targets .Power distribution dispatched through PLC system 2 master and 2 slaves .PB 400 Merlin Gerin. Plus 6.6KV motors re-acceleration after electrical production troubles. Re-accelerations process presented to Lloyd's representative for agreement. Also Fire alarm and public address by ``Tannoy Call'' Language : English.
  • ELF - Diagnosis and maintenance engineer

    1984 - 1984 ELF CONGO Pointe-Noire for offshore accomodations Yanga/Sendji power generation issued of Nuovo Pignone gas turbines.
  • ELF - Electrical maintenance engineer

    1984 - 1985 Refinery 10MT/Year Donges Atlantic shore Responsible from electrical supply management.63KV antenna feeder .GEC gas turbine 20MW 1 steam turbine CEM/ABB 4MW. Speed variator motors:2MW .22 switchgears, ship terminal accommodations.
  • ZADCO and UMM - Electrical supervisor

    1982 - 1983 Emirates Persian golf . U.A.E.
    .Pre commissioning from wellheads, North and South satellites included a crude oil pre-treatment. Electrical power supply incoming from 33KV sub-marine cables, main transformers 33/6.6KV. Dry transfo.HOLEC. Safety boats,H.V. transformer and
    Switchboards provided by Merlin Gerin. Low voltage switchgear MITSUBISHI.HVAC. Fire detection. Language: English.
  • IPEDEX for ALSTOM - Electrical supervisor & dispatcher

    1981 - 1982 S.I.R.Refinery ABIDJAN utilities unit. 2 steam turbines driven ALSTOM alternators 25MW/15KV. Pre-commissioning , Commissioning, start-up and exploitation. Training of local operators
  • CONTROLE & TECHNIQUE - Site manager

    1980 - 1980 ESSO Refinery Botlegweg plant ROTTERDAM NEDERLAND
    volve Offsite extensions . 20 expatriate peoples: instrument technicians, electricians, pipe fitters ,. Engineered from FLUORDANIEL Nederland and WESTINGHOUSE Nederland . Targeted just in time. Financial management. Language: English.
  • ELF - Electrical maintenance supervisor

    1978 - 1980 Locations : Granpuits 40Km East of Paris.-Feyzin 10Km South of Lyon.-Gargenville30Km West of Paris.
    Electrical maintenance supervisor. HV - LV Switch-rooms. Fan motors. Compressors Utilities, steam cracking ,off site, expediting from
    trucks tank and railways. Tank & gas capacities level gauge EVERSHED maintenance & management .
  • TOTAL E&P - Electrical superintendent

    1963 - maintenant TOTAL.CLOV.FPSO DSME YARD : Involved for construction pre-commissioning of TOPSIDES : 4 Turbo-alternators 11KV/25MW GE PIGNONE. Switchgears 11KV, 0,4KV SCHNEIDER- Battery chargers & Inverters Schneider Gutor. High power VFD motors CONVERTEAM . ABB /FRAMO .