Menu

Eva RISCH

Paris

En résumé

Pas de description

Entreprises

  • General Electric Healthcare - HSE intern

    Paris maintenant High risk operations review, Health & Safety framework validation, risk analysis of the air cooling towers
  • Saint-Gobain Recherche, Aubervilliers - HSE intern

    maintenant To develop a semi quantitative Risk analysis method and to help build the reference document
  • Saint-Gobain High Performance Materials R&D (Northboro, MA) - HSE intern

    maintenant To implement the Toxic Risks and the Safety Risks Management tool in a R&D center.
  • Irstea Montpellier - Pôle ELSA - Environmental Engineer

    2010 - maintenant Recherche appliquée en méthodologie Analyse de Cycle de Vie (ACV) sur les systèmes d'assainissement.
  • CSIRO Sustainable Ecosystems / Urban Systems Program, Canberra ACT Australie - Industrial trainee

    2009 - 2009 The main objective of the project was to determine what infrastructure technology innovations are most suitable for a national showcase of innovation in sustainable urban development at East Lake, Canberra. The infrastructure options assessed include the water treatment and solutions, the alternative energy sources, the by-product exchange schemes and the solid waste treatment, and finally the transportation systems.

    The implied strategy was to explore a range of scales – on-block through to district/regional – but with particular emphasis on options that allow to ‘close the loop’ on East Lake’s resource requirements, reducing reliance on Canberra’s larger centralised infrastructure system. A comprehensive desktop review to identify and evaluate ‘candidate’ technology options was carried out and submitted to the relevant CSIRO sustainability experts and key ACT stakeholders at a joint CSIRO/ACT Government workshop.

Formations

Réseau

Annuaire des membres :