SICA-France
- Material Expediting coordinator
2014 - 2015
* TOTAL France - INCAHUASI Project
Conduct of Expediting visits to main subcontractor in Europe and abroad, for material delivery for TOTAL - INCAHUASI project in BOLIVIA.
Monitoring and leading of expediting meeting.
Minutes of Meeting redaction.
Documentation punch list coordinator.
Schedule supervision, and reviewer.
Material involved: Valves (all type), heaters, heat exchangers, chimney, primary and secondary structures, control panels....
-
Piping & Structures - SICA-France
- QC Inspector-welding
2012 - 2014
* TECHNIP France
Inspection of raw material (Flanges, Fittings, pipes, seamless or welded either...) for piping, for structure, pressure vessel, and other.
Witness of Heat treatment, for duplex, super-duplex, or else
Inspection of Valves (any type or size) as per API 598, API 6D, API 6DSS.......
Material test certificate, supplier specification review and
Mechanical test and/or NDT witnessing or supervision for Valves, raw pipes and Fittings.
Welding inspection, Welding NDT/NDE Supervision and inspection, for piping, structure, pressure vessel, and other.
Witness of Heat treatment, for duplex, super-duplex, or else
Welding book, Testing procedure, FQCP reviewer and/or validator.
Participation of PIM, kick of meeting.
All for project Braskem, Prelude, Alger, Dong, Martin Linge, Moho 1Bis, Yamal, ......
-
SICA SAS
- QA/QC inspector
Neuilly Sur Seine
2012 - maintenant
-
SICA-France
- QA/QC engineer
2012 - 2012
Review of material Test Certificates, Technical Analysis Review, NDT Review, Mechanical Test review, Codes, norms and rules review in view of qualification and certification (eg. ABS EH36, ASTM A105-11, A106-10, A 131, A 234-11, A 350 -10, A 420-10, A 694-08, A 751-08, A 860-10, A 960-10, EE MUA 144-145-146...), Chemical Review, SPWHT Review
-
SICA-France
- QA/QC engineer
2012 - 2012
* TECHNIP / ASIAFLEX
Reel and Cradle Inspection, including: welding inspection, coating inspection, documentation review, pressure testing, MPI, UT, and Mechanical test supervision, in Singapore, Indonesia, and Malaysia.
HSE responsibilities regarding the mission.
* VMOG
Raw pipes (OCTG) inspections for various subsidiaries in TIENDA manufacturer facilities (Chuzhou, China)
Documentation review, pressure testing, MPI, UT, Mechanical test, as per API 5 CT
HSE responsibilities regarding the mission.
-
SICA-France
- QA/QC engineer
2011 - 2012
* Total TEC CQI
Valves inspections for various subsidiaries (Congo, Gabon, Russia,...) in different manufacturer facilities (Sri, Darco,..).
Documentation review, pressure testing, FAT with actuators, paint according to relevant TOTAL GS.
HSE responsibilities regarding the mission.
-
PROJECT - BOCCARD
- PREPARATOR MANAGER
2010 - 2011
Piping preparation management on gas under- earth storage plant,
Isometrics reception, preparation, supervision and diffusion follow-up,
Material request follow-up,
Technical request redaction and follow-up,
Applicable documents and Client documents lists follow-up,
-
DEGREMONT SA
- MECHANICAL AND PIPING SUPERVISOR
2009 - 2010
* KOUDIAT ACERDOUN (Algeria), duration: 12 month
Mechanical and piping supervisor on water treatment for drinking water producing plant,
QA/QC of welding, NDE/NDT,
Visual Inspection on Structure and piping
HSE responsibilities regarding the mission.
-
COCKERILL MAINTENANCE & INGENIERIE
- QA/QC SUPERINTENDENT
2008 - 2009
* AZZOUR KOWEIT (Indonesia), duration: 14 month
Site and workshop supervisor for a supplier of CMI
Supervision and control on HRS equipment: Large bore and small bore pipes, mechanically welded profile and chimney,
QA/QC of welding, NDE/NDT supervision,
Qualification of welders
Supervision of technical manual preparation (manufactory data book)
In charge of the QC of the production., HSE responsibilities regarding the mission.
-
OFF-SHORE - ACERGY SA
- HOOK-UP PREPARATOR
2007 - 2008
Interpretation and preparation of isometrics drawings for UFR pipes and structures
Pipe supports calculation verification and design
Red-lines marking and follow up.
Welding progress follow-up
Material query follow-up
NDT/NDE Procedure and Welding Procedure follow-up
Progress report, HSE responsibilities regarding the mission.
-
SAIPEM SA
- PRODUCTION COORDINATOR
Montigny-le-Bretonneux
2007 - 2007
* BP GREAT PLUTONIO (Angola), duration: 6 month
Coordination of work to do for Subsea Jumpers, SPS/UFR material fabrication for BP GREAT PLUTONIO project
Welding progress follow-up
Material query follow-up
Progress report
NDT/NDE Procedure and Welding Procedure follow-up
HSE responsibilities regarding the mission.
-
SAIPEM SA
- PUNCH-LIST MANAGER
Montigny-le-Bretonneux
2007 - 2007
* ZEEBRUGE NLG STORAGE PLANT (Belgium), duration: 4 month
Coordination of punch list for ZEEBRUGGE LNG TERMINAL EXTENSION
Work progress on punch list point follow-up
Coordination of working team for closing punch list point
Material request follow-up
Progress report
Engineering and mark-up execution and follow-up
HSE responsibilities regarding the mission.
-
SAIPEM SA
- PRODUCTION COORDINATOR
Montigny-le-Bretonneux
2006 - 2007
* BP GREAT PLUTONIO (France), duration: 4 month
Coordination of work to do for Subsea Jumpers, SPS/UFR material fabrication for BP GREAT PLUTONIO project
Material request follow-up
Relationship with Client and SOYO deep offshore yard
Progress report
Welding progress follow-up
NDT/NDE Procedure and Welding Procedure follow-up
HSE responsibilities regarding the mission.
-
GAZTRANSPORT ET TECHNIGAZ
- SITE REPRESENTATIVE
Saint-Rémy-lès-Chevreuse
2006 - 2006
* LNG ULSAN Shipyard (South Korea), duration: 9 month
Supervision of LNG containment MARK III systems building: steel plate's works, welding inspection (visual)
Technical assistance for HYUNDAI HEAVY INDUSTRIES
Relationship with owners and classification companies
Progress report
-
AXETUDE OR ATS BE
- PIPING DESIGNER & SUPERVISOR
2004 - 2005
Conception and realization of process schemes pipes and tubes works
Application field: Heat-insulating, chemical pipes, a.s.o. ...
Realization of framework and frame to support hopper and pipes
Supervision of pipe and piping equipments installation
-
WATER TREATMENT PLANT - CORELEC SA
- ASSISTANT MANAGER SALES DEPARTMENT
2001 - 2004
Conception and realization of electroplating water treatment plant
Supervision of research done by sub contractor
Supervision of manufacturing those materials by sub contractors
Supervision of working sites for construction
Orders administration
Management of Back-office for sales department
Calculation for dimensional of water treatment plant
-
DIFFERENT ENGINEERING OFFICE
- DESIGNER
1998 - 2001
Conception and realization of technical drawings with AUTOCAD in several fields: Engineering, robots, automobile mechanics, fire safety device, piping...
Conception and realization of cooking and sterilization materials based on infra red radiation
Supervision of research done by sub contractor
Supervision of manufacturing those materials by sub contractors
Supervision of working sites for construction and starting of robots