ABB
- Telecom, instrumentation supervisor
Cergy
2015 - maintenant
- Supervise of telecom work, blowing 335 Km of Fiber Optical cable from Hassi Messaoud to Hassi R’Mel.
- Supervise, servile and following all activity of telecom work (blowing, junction, OTDR test)
- Servile the activity of sub-contractor during the opening of tranches using for Fiber Optical cables
- Reading and check the OTDR tests of Fiber Optic cables as per a project specification.
- Reporting and reception of work, PV, ITR (Inspection test report).
- Manage all activity of telecom & instrumentation work, construction, pre-commissioning and commissioning
activity
- Reception with customer's assistance and subcontractor in respecting of project specification and quality
control plans (construction and pre- commissioning/commissioning activity).
- Preparation of mechanical completions records.
- Preparation of ITR files (Inspection Test Report) for the Pre-Commissioning and Commissioning activity.
- Preparations of the loops check files, records of the ITR loop check.
-
ABB
- Inspector
Cergy
2013 - 2014
(HBK - Progect - HAOUD BARKAOUI - QA/QC instrumentation Inspector (1 year)
- Duties included: construction works (Mechanical completion) and pre-commissioning, commissioning of Instrumentation and control system (DCS & PLC and SCADA), F&G system, HVAC system, electric systems
(MV, LV and UPS SYSTEM).
- Re-instrumentation, transfer and renovation of control system (DCS & PLC and SCADA), F&G system, HVAC system, electric systems (MV, LV and UPS SYSTEM).
- Reception with customer's assistance and subcontractor in respecting of project specification and quality control plans (construction and pre- commissioning/commissioning activity).
- Supervise the electrical and I&C testing.
- Coordinate between constructions (mechanical completion) and commissioning team.
- Complete the test forms at the end of I&C, electrical inspection (construction, pre-commissioning, and commissioning)
- Make the non-compliance reports both during pre-checks and testing phase.
- Prepare the final documentation for all disciplines (mechanical, civil, electrical, I&C).
ABB -Italy PA Division - Wells and GDM Off site of CPF EL MERK
Sonatrach - Anadarko association - El Merk project
-
ABB
- QA/QC instrumentation Inspector
Cergy
2013 - 2014
- Duties included: construction works (Mechanical completion) and pre-commissioning, commissioning of
Instrumentation and control system (DCS & PLC and SCADA), F&G system, HVAC system, electric systems
(MV, LV and UPS SYSTEM).
- Re-instrumentation, transfer and renovation of control system (DCS & PLC and SCADA), F&G system, HVAC
system, electric systems (MV, LV and UPS SYSTEM).
- Reception with customer's assistance and subcontractor in respecting of project specification and
quality control plans (construction and pre- commissioning/commissioning activity).
- Supervise the electrical and I&C testing.
- Coordinate between constructions (mechanical completion) and commissioning team.
- Complete the test forms at the end of I&C, electrical inspection (construction, pre-commissioning, and
commissioning)
- Make the non-compliance reports both during pre-checks and testing phase.
- Prepare the final documentation for all disciplines (mechanical, civil, electrical, I&C).
-
ABB
- Inspector
Cergy
2013 - 2014
(HBK - Progect - HAOUD BARKAOUI - QA/QC instrumentation Inspector (1 year)
- Duties included: construction works (Mechanical completion) and pre-commissioning, commissioning of
Instrumentation and control system (DCS & PLC and SCADA), F&G system, HVAC system, electric systems
(MV, LV and UPS SYSTEM).
- Re-instrumentation, transfer and renovation of control system (DCS & PLC and SCADA), F&G system, HVAC
system, electric systems (MV, LV and UPS SYSTEM).
- Reception with customer's assistance and subcontractor in respecting of project specification and
quality control plans (construction and pre- commissioning/commissioning activity).
- Supervise the electrical and I&C testing. ;
- Coordinate between constructions (mechanical completion) and commissioning team.
- Complete the test forms at the end of I&C, electrical inspection (construction, pre-commissioning, and
commissioning)
- Make the non-compliance reports both during pre-checks and testing phase.
- Prepare the final documentation for all disciplines (mechanical, civil, electrical, I&C).
-
ABB
- Instrumentation Inspector
Cergy
2012 - 2013
(ELM - Progect N° : 20024 - EL MERK- 2012 /Oct 2013
- CPF Offsite water and gas re-injection facilities: 84 wells, 10 substations FGS (field gathering stations)
- All Activities of Pre-commissioning & commissioning assistance test of various equipment's in the wells and
GDM (Gas distubition manufacturing) in the Off Site of El-Merk project.
- Preparation of mechanical completions records. ;
- Preparation of ITR files (Inspection Test Report) for the Pre-Commissioning and Commissioning activity.
- Preparations of the loops check files, records of the ITR loop check.
- Preparations of Functional Test and Safety Test for Wells and FGS of ELM Project.
- Telecom: telecommunications followed and update of situation of works (Fiber Optic, Ethernet...) ;
- Manage the test-schedules with client according with ABB schedules
- Loop checks, functional test and safety test assistances according to the narrative control of DCS, ICSS &
SCADA.
-
ABB
- QA/QC Instrumentation Inspector
Cergy
2012 - 2013
(ELM - Progect N° : 20024 - EL MERK- 2012 /Oct 2013
- CPF Offsite water and gas re-injection facilities: 84 wells, 10 substations FGS (field gathering stations)
- All Activities of Pre-commissioning & commissioning assistance test of various equipment's in the wells and GDM (Gas distubition manufacturing) in the Off Site of El-Merk project.
- Preparation of mechanical completions records.
- Preparation of ITR files (Inspection Test Report) for the Pre-Commissioning and Commissioning activity.
- Preparations of the loops check files, records of the ITR loop check.
- Preparations of Functional Test and Safety Test for Wells and FGS of ELM Project.
- Telecom: telecommunications followed and update of situation of works (Fiber Optic, Ethernet...)
- Manage the test-schedules with client according with ABB schedules
- Loop checks, functional test and safety test assistances according to the narrative control of DCS, ICSS &
SCADA.
PUL - PETROFAC SPA - CPF Central Process Facility
Sonatrach - Anadarko association - El Merk project
-
ABB
- Ingénieur QA/QC en Instrumentation
Cergy
2012 - 2013
- CPF Offsite water and gas re-injection facilities: 84 wells, 10 substations FGS (field gathering stations)
- All Activities of Pre-commissioning & commissioning assistance test of various equipment’s in the wells and
GDM (Gas distubition manufacturing) in the Off Site of El-Merk project.
- Preparation of mechanical completions records.
- Preparation of ITR files (Inspection Test Report) for the Pre-Commissioning and Commissioning activity.
- Preparations of the loops check files, records of the ITR loop check.
- Preparations of Functional Test and Safety Test for Wells and FGS of ELM Project.
- Telecom: telecommunications followed and update of situation of works (Fiber Optic, Ethernet…)
- Manage the test-schedules with client according with ABB schedules
- Loop checks, functional test and safety test assistances according to the narrative control of DCS, ICSS &
SCADA.
-
Petrofac
- Instrumentation Supervisor & Project Coordinator
Jersey
2012 - 2012
Prepared daily working permit and organization of the time activity's and task. ;
- Analysis of the technical documentation of project. ;
- Take part in the planning and final accounting of the construction activities.
- Ensure that all activities are carried out respecting the safety procedures.
- Manage, verify, supervise and certify that all tasks and work are performed and the results are in accordance
with design specifications.
- Coordination and collaborations management between the sub-contractor and Contractor Company for 2
month (Coordinator of project for Cevielec SPA).
-
Abb
- QA/QC
Cergy
2012 - maintenant
(HEK - Progect - HAOUD EL HAMRA, Telecom, instrumentation 2015 until to day
- Supervise of telecom work, blowing 335 Km of Fiber Optical cable from Hassi Messaoud to Hassi R'Mel.
- Supervise, servile and following all activity of telecom work (blowing, junction, OTDR test)
- Servile the activity of sub-contractor during the opening of tranches using for Fiber Optical cables
- Reading and check the OTDR tests of Fiber Optic cables as per a project specification.
- Reporting and reception of work, PV, ITR (Inspection test report).
- Manage all activity of telecom & instrumentation work, construction, pre-commissioning and commissioning activity
- Reception with customer's assistance and subcontractor in respecting of project specification and quality control plans (construction and pre- commissioning/commissioning activity).
- Preparation of mechanical completions records.
- Preparation of ITR files (Inspection Test Report) for the Pre-Commissioning and Commissioning activity.
- Preparations of the loops check files, records of the ITR loop check.
ABB -Italy PA Division - Constraction of station for recuperation gas flare
SONATRACH Haoud Berkaoui project
-
CEVIELEC
- Instrumentation Supervisor & Project Coordinator
2012 - 2012
Prepared daily working permit and organization of the time activity's and task.
- Analysis of the technical documentation of project.
- Take part in the planning and final accounting of the construction activities.
- Ensure that all activities are carried out respecting the safety procedures.
- Manage, verify, supervise and certify that all tasks and work are performed and the results are in accordance with design specifications.
- Coordination and collaborations management between the sub-contractor and Contractor Company for 2
month (Coordinator of project for Cevielec SPA).
-
Petrofac
- Ingénieur en Instrumentation
Jersey
2012 - 2012
Supervisé et gérais la réalisations et la mise en places des instrument des mesures de pression, débit, température, niveau, et système d'alarme fier and gaz dans la raffinerie de oil and gaz d'el merk a illizi, algerie.