ARIANESPACE
- Head of launcher production division
Evry-Courcouronnes
2008 - maintenant
MANAGEMENT :
- Head of launcher production division for Ariane 5, Soyuz and Vega launchers. (27 collaborators)
- Head of configuration and qualification department for launchers ARIANE 5 and 4, SOYUZ, VEGA.
- Head of technical team during ARIANE 4 and 5. Launch campaign. (~10 peoples)
- Project manager for the end of ARIANE 4 program (Budget 35 M€)
- Responsible for the reengineering of the ARIANE 5 configuration process.
- Responsible of the contract for ARIANE 4 electrical chain. In relation with the following companies
EADS, SAAB (Sweden), ETCA (Belgium).
- Project manager of RAFALE simulator for RBE2 radar testing.
• RESEARCH AND DEVELOPMENT :
- Expert on ARIANE 5 electrical system.
- Project manager for ARIANE 4 electrical system and equipment development.
- Designer of the RBE2 radar real time function. (RAFALE).
- Radar signal treatment patent.
- System designer for RDI radar (MIRAGE 2000).
• TEST AND INTEGRATION :
- Head of launch campaign for ARIANE 4 and 5 in French Guyana, as representative of the head of
ARIANESPACE Industrial Directorate.
- ARIANE 4 electrical technical authority during launch campaign in French Guyana.
- First RBE2 radar integration responsible. (Flight test in Bretigny, Istres, and ship carrier).
- RDI radar system integration responsible. (Flight test in Bretigny, Istres, Cazaux).
• PRODUCTION AND METHODS :
- Member of the ISO 9000 ARIANESPACE piloting comity.
- Internal ISO auditor of ARIANESPACE.
- In charge of the knowledge management tools for ARIANESPACE Industrial Directorate
- Responsible of ARIANE 4 reliability actions for electrical equipment.
- Responsible of on board radar reliability actions.
- Definition of IT tools for test flight analysis.
COMMUNICATION
- ARIANESPACE official commentator for launch worldwide video transmission.