Responsible for the field implementation of the Capital equipment solutions (£5 million project) : 3 decanters and 2 trickling filters (largest in Europe)
o Analyze site solutions and raise defects and issues with the contractor (NEC3 contract, CDM)
o Implement additional work required to close project contractual gaps/scope deficiencies
o Manage project invoices and forecast spending projections
o Verify system capacity to finalize contractual agreements with Scottish Water
Verify process and laboratory compliance and initiate site wide improvements
-
OREGE
- Commissioning & process engineer
Jouy-en-Josas
2016 - 2016
Commissioning Engineer – Orege
Autonomously commissioned new, patented, sludge treatment technology (SLG) at various water treatment sites around the world (USA, Germany, UK)
Developed and implemented FAT and SAT documentation
Developed and presented reports to management
-
Saur
- Maintenance manager
2015 - 2016
Wastewater treatment site Maintenance Manager – SAUR Group
Managed the electrical and mechanical maintenance department (4 employees)
Managed tender and contractor relationships, specifically outstanding work and purchase orders
Managed and controlled a budget of £600,000
Scheduled maintenance work and managed planned and unplanned downtime
Kicked off a project for a site wide replacement of PLCs, ~£1 million budget
-
Saur
- Process advisor for industrial waste water plant and management
2014 - 2015
Process Advisor – MaSa
Process advisor for the joint venture of Marafiq and Saur
Superintendent of the industrial and the domestic wastewater plant
Responsible for 80 employees, managed day-to-day process activities
Managed the implementation of a new industrial, wastewater treatment plant project (site capacity = 48,000 m3/day): raised defects, trained associates, initiated logistics, ordered supplies, etc
Technical Service department lead: pipe connections, repairs and renewals, pollution control, and new customer network pipeline integrations, etc.
-
Saur
- Commissioning engineer
2014 - 2014
Commissioning Engineer – STEREAU
Commissioned Djibouti’s (40.000 EH) domestic waste water treatment plant
Tested offline, inline, and process startups
Setup process laboratory and trained lab associates in analysis testing
-
Saur
- Lead engineer wastewater treatment
2012 - 2014
monitoring the commissioing of new expasion of industrial wastewater plant (55 000m3/day) to produce irrigation water form petrochemical wastewater:
- coagulation/floculation
- activate sludge
- fenton reactor
- pressure filter
- GAC filter
- chlorination for irrigation distribution
-
Saur
- Expansion & Studies Lead Engineer - MaSa JV - Kingdom of Saudi Arabia
2012 - 2014
Expansion & Studies Lead Engineer - MaSa
Took over an industrial wastewater treatment facility expansion (55,000m3/day)
Project managed the reduction of waste water treatment chemicals (32% saving)
Managed and optimized advanced chemical treatment operations e.g. FENTON Process and GAC filter, DAF and other technologies
Supported the startup of a new wastewater department
Change Management: Reduced employee headcount from 513 employees to 400
Restructured and optimized the organizational chart for maintenance and operations departments (associate level)
Managed invoices, project issues and reporting, and gave project oversight
Reviewed and coordinated CAPEX project while maintaining the budget
-
Saur
- Project Manager for CMMS Deployment Project - SCOTLAND
2011 - 2012
Sludge Dewatering Operations Manager – SAUR Group
Acted as the liaison between SAUR and Scottish Water’s wastewater treatment plant
Ensured the smooth and continuous operations of Saur’s dewatering services
Defined, set-up and operated the site’s emergency plan
Project managed the deployment of a CMMS: software selection and implementation, includes work order scheduling, preventative maintenance, resourcing, downtime tracking, inventory management, budgeting, reporting, etc
Project Manager for CMMS Deployment Project
- Scope of work definition
- Subcontractor selection
- Deployment and handover
-
Saur
- Sludge Dewatering Operation Manager - SCOTLAND
2011 - 2012
Resource management and operations, wastewater treatment, and waste recovery Group serving 18 million customers in Europe and worldwide
- Daily Liaison with Dalmuir wastewater treatment plant (Scottish Water) to ensure the smooth and continuous operation of their dewatering services
- Set up and operate the operations emergency plan
-
Veolia Water
- Commissioning Engineer in VIETNAM
Paris
2010 - 2010
Commissioning Engineer - Véolia Water STI,(activated carbon factory)
Commissioned the activation of carbon furnaces and the de-mineralization plant
Set up the process control laboratory and delivered staff training