Menu

Gregory CARDONA

COURBEVOIE

En résumé

Positions summary:
From May 11 to present: Project engineer revamping Oil and Gas project
From May 08 to June 11: Project & construction engineer for an Oil & Gas major
From November 06 to April 08: Site project engineer for an EPCM company
From February 06 to July 06: Assistant project manager for industrial construction company

Mes compétences :
Construction
Flexible
Microsoft Project
Oil and gas
Planning
Procurement
Project Engineer
Reporting
Subsea

Entreprises

  • TOTAL Gabon - Project Engineer

    COURBEVOIE 2011 - maintenant Project Engineer - TOTAL Gabon
    In charge of procurement activities for revamping project

    Total budget of procurement: ~ 25 MUSD
  • TOTAL E&P Congo - Project engineer

    COURBEVOIE 2008 - 2010 Team responsible for conversion, modifications and upgrades on NKOSSA & ALIMA units

    Total budget per year ~ 20 MUSD

    • Sub sea activities with operation vessels (Normand Installer & S3000)
    Projects: Replacement of flexibles on Nkossa with platform shutdown – 12 MUSD
    Operation of wire winch replacement – 2 MUSD
    Securization of anchoring lines on Nkossa – 2 MUSD

    - Responsible for budget estimation, cost follow up & planning
    - In charge to define specification requisition for flexible pipes and installation aids
    - Vendors interface for flexibles (vendor Technip)
    - Responsible for Task plan / Bridging document writing and review
    - In charge to define interface between internal department and contractors
    - In charge of mobilzation plan (vendors rep., installation aids, etc)
    - In charge of precommissionning activities for flexibles
    - Establishment of procedures
    - Mobilization of human and material resources
    - Site follow up for dewatering & hydrotest

    • Structure, Piping & Instrumentation projects
    - Responsible for budget estimation, cost follow up & planning
    - In charge to assign and to manage TOTAL supervision team to follow the Project from engineering to site activities
    - Responsible for project call for tenders establishment
    - In charge to review and validate commercial and technical supplier proposals
    - In charge to monitor contractors activities from engineering to construction steps and
    ensure respect of project milestones
    - Kick off meeting leader for the subcontractor’s site intervention (risk and safety issues, method statements)

    • Plant shutdown leader - Nkossa offshore field (10 days / 100 workers)
    - In charge to define material and human ressources (Contractors and Company)
    - In charge to manage the project interfaces between internal departments and Contractors
    - In charge to develop and ensure shutdown execution planning
    - Responsible of vendor’s mobilization
    - Top management reporting for production concerns
  • ENTREPOSE CONTRACTING - Site project engineer

    Colombes 2006 - 2008 Site project engineer - ENTREPOSE CONTRACTING Algeria Sahara
    Expansion project EPC of a crude oil and natural gas plant (CONOCO PHILIPS)

    • Precommissioning / commissioning leader
    - Gas turbine and centrifugal compressors
    - Reciprocating compressors
    - Dehydration package
    - Metering export package
    - Air unit, nitrogen unit, process vessels, air coolers, pumps, piping
    - Well heads unit

    • SIMOPS and total plant shutdown coordination
    - Responsible for feasibility and realisation engineering
    - In charge to establish job cards
    - In charge to define method statements and risk assessments
    - Site work activities coordination

    • Vendors site coordinator for dehydration package, air unit, nitrogen unit

    • Permit to work management (risk analysis on site, definition with Operations of the controls and safety measures to put in place)

Formations

Réseau

Annuaire des membres :