Menu

Guillaume DAVID

Boulogne Billancourt

En résumé

Mes compétences :
Ms project
Requirement management
Management d'équipe
Management de projets
Direction Achats
Management qualité

Entreprises

  • Alten Technology France - Business Manager

    Boulogne Billancourt 2014 - maintenant
  • Actia Corporation - Engineering Project manager

    2012 - 2014 Manage multiple projects at once through a full design cycle. Projects range from 2 months to 3+ years in duration.
    Products designed and industrialized : gauges, dashboard and clusters. Multiplexing systems for transportation vehicle. - Engine controllers.
    Work with the customer to fully define project requirements and turn those into a finished project.
    Responsibilities include:
    • Creating feasibility studies - formal requirements definition, estimating NRE, BOM pricing, obsolete material impact, and MS Project timelines.
    • 
Working directly with vendors on creation of new components and negotiating pricing.

    • Working with Manufacturing and Manufacturing Engineering to define end of line test requirements and assembly instructions.

    • Working with various disciplines within Engineering to guide the design to ensure costs (both material and labor) stay within budget, as well as a finished product that meets the customer's needs.
  • Actia Corporation - Application Engineer

    2011 - 2012 Main customer interface throughout the course of a project. Responsibilities included:

    • Using MS Word, develop a full functional specification. Define aesthetic and cosmetic customer requirements.
    • Create and perform software verification testing, ensuring that our code matched the approved functional specification. Support the customer to perform system validation.
  • Actia Corporation - Continuous improvement / Quality engineer

    2011 - 2011 • Business procedure Set up, training and implementation.
    • Implementation of continuous improvements into processes and products
    • Implementation of Production Part Approval Process PPAP System, Supplier validation process and Supplier performance rating system.
    • Quality follow up with suppliers and Quality assurance with customer
  • Actia China - Operation Manager, International Purchasing Office

    2007 - 2011 • Purchasing (budget of 7MUSD purchases / year)
    - Sourcing of suppliers in China for Actia Group subsidiaries (in 15 countries)
    - Improve prices assessment to facilitate negotiation.
    - The main projects/parts concern different technology, mainly customized parts/Products: PCB, LCD, EMS, TFT, connectors, Cables, Mechanical parts, OEM Products: Card reader, Garage equipment, DVD player…
    - Technical coordination and Technology foresight.
    - Negotiation and cost reduction.

    • Quality / Internal process improvement
    - Perform quality and process audit, organize quality inspection to improve and follow up supplier quality.
    - Set up and follow action plans with Supplier.
    - Coordination of Quality engineer and quality inspector

    • Management
    - Manage a team of 7 people (4 purchasers, 2 quality engineer, and one mechanical engineer)
    - Hire / train people, define/implement objectives, budget reporting, analyze financial result.
    - Collect customer requirement and prepare quotations.
    - Reporting of department Activity to General manager
    - In Charge of the Contracts Reviews
  • Asiainspection - Master internship - Quality and process engineer

    Hong Kong 2006 - 2006 Performed quality inspections and audits in factories in China and through Asia.
    Designed and set up a new audit form. Improved tests protocols for different kinds of products.
    Have participated in the improvement of AsiaInspection IT platform.
  • Neopost industries in Le LUDE (FRANCE) - It developer- Interneship 4 months

    2005 - 2005 Training period where I developed a database on VB.net and SQL server under the visual studio environment. I trained the staff on Photoshop. I also set up projects of organization to improve the productivity and to develop the information flow system.
  • LTR Industries (Tabaco Company) in Le Mans - Technician - internship 2 monthes

    2004 - 2004 Employed as a technician of maintenance in controlled systems and sensors (5 weeks) and in electrical department (4 weeks).

Formations

  • Indiana University South Bend (South Bend)

    South Bend 2012 - 2013 MBA

    Master Business Administration
  • ESEO

    Angers 2001 - 2006 Master
Annuaire des membres :