Menu

Guillaume SMRKOLJ

PARIS

En résumé

Team leader. Expertise in supply chain ERP processes automation. >8-year of
successful international experience in Aerospace industry. Top ranking
engineering & business school. MS Excel consulting website. Available Oct. 2019.

Mes compétences :
Conception
Supply Chain
Mécanique
Aéronautique
Production
Management
Design
Gestion de projets
Purchasing
Capacity Planning
Purchase Orders
design change introduction project management
ERP deployment
MRP implementation
managed industrial projects
Project Management
Lean Manufacturing
successful international experience
Microsoft .NET Technology
SQL
Visual Basic
CATIA
Microsoft Excel
SDRC I-Deas
Solidworks
Visual Basic for Applications

Entreprises

  • SAFRAN Cabin Sterling - Supply Chain Director

    2018 - maintenant * In charge of Planning, Purchasing, Sourcing and Warehouse.
    * Up to 20+ employees under responsibility.
    * Implemented multiple automated supply chain processes to restore monthly COTD from 18% to 90% with 68% shortage reduction, 33%
    inventory turnover reduction, favorable PPV & purchasing staff reduction.
    o Multi-pegging shortage reporting system (used across the company).
    o Monthly ERP forecast & safety stocks update (20-step process tool).
    o Material and capacity planning process set up (S&OP, MPS, APS).
    o Automated production scheduling system and daily Gemba.
    o Dynamic ERP purchasing portal (live metrics, drill down feature).
    o Efficient supplier communication flow (demand/supply balance tool and auto emailing system).
    o Warehouse re-layout, sub kitting & hot part flow, lotting in process.
    o Smart ERP quoting tool for Sales department.
    * On track for 600k+ USD annual savings by re-sourcing activities.
  • ZODIAC Electrical Inserts - Planning & Business Process Manager

    2017 - 2018 * Implemented MRP / MPS / S&OP planning processes (recognized as best practice by Zodiac Group).
    * 2 planners under direct responsibility.
    * Designed and deployed multiple automated ERP processes throughout supply chain and operation to operate at maximum efficiency.
    o Production & sales monitoring system.
    o Automated shortage reporting.
    o Warehouse receiving & kitting process set up.
    o New product & design change introduction project management.
    o Purchase order placement & management process set up.
  • ZODIAC Electrical Inserts - NPI & ERP Business Process Manager

    2014 - 2017 * In charge of ERP deployment and MRP implementation.
    * 5 Engineers under direct responsibility.
    * Coordinated interdepartmental workshops and managed industrial projects with other Zodiac companies in Thailand, Germany and USA.
    o New products introduction project management.
    o ERP master data & configuration control.
  • ZODIAC Evacuation Systems - R&D Product Design Engineer

    2011 - 2014 * Product design, qualification and industrialization of evacuation products for airplanes and helicopters in coordination with all departments from
    R&D, tech-pubs, certification, production and maintenance.
  • Dassault Aviation - Engineer internship - Production Management

    Saint-Cloud 2010 - 2010 Little Rock, Arkansas, U.S.A.

    Work provided: Improved Manufacturing processes and stock management. Contributed to the Lean Manufacturing implementation plan (5S Methodology, Automation and improvement of the Dashboards).
    Project coordinator: Evolution of the surface treatment process before painting.
  • Job Service INSA Lyon - End-of-studies Project - Mechanical Design/ Aerodynamic

    2009 - 2009 Lyon, FRANCE

    Construction of a remote-controlled test bench: Studied the airflow around an airfoil placed inside a wind tunnel. Designed, dimensioned and purchased components. Managed controls and acquired data via web with LABVIEW + Excel / VBA.
  • Groupe SEB - Engineer internship – R&D Project

    Vernon 2008 - 2009 Annecy, FRANCE

    Work provided: Established a test bench to validate a new type of force sensor. Studied the mechanical behavior, developed an automatic data processing and computer analysis.
  • Icko - School Project - Development & Mechanical Design

    2008 - 2008 Lyon, FRANCE

    Project (served as part of a 6 member team): Designed a robotic arm and optimized an existing vehicle intended for construction. Mechanical responsible: designed the arm, stability and kinematic studied.
  • Wolverine Tube Inc. - Technician internship - Production Installation

    2005 - 2005 Monterrey, MEXICO

    Work provided: Installed a water recycling machine in the factory (hydraulic and electrical connections).

Formations

  • Ecole Nationale Supérieure Des Arts Et Métiers (Paris)

    Paris 2009 - 2010 Master specialization (Master +1) in Engineering - Congratulations of the jury.

    Aerospace and Management (INSEEC Business School) -
    Bordeaux, FRANCE

    Technical coursework at ENSAM. Management training at the INSEEC Business School of Bordeaux (project management, Supply chain, marketing, finances). Obtained the certificate « Generalities in Aeronautic » (approved Part 147).
  • Institut National Des Sciences Appliquées (Villeurbanne)

    Villeurbanne 2004 - 2009 Engineering Master Degree - 3rd ranked engineering school in France (“Usine Nouvelle”, 2012, 2013)

    Mechanical Design - Lyon, FRANCE

    - Preparatory cycle: International section “Amerinsa” (French/Latin American partnership).
    - 2nd cycle: Mechanical Design. Coursework: General Mechanic.
    - 5th year: specialization in Fluid mechanics and Thermal sciences.

Réseau

Annuaire des membres :