Menu

Guy FAUGERE

PARIS

En résumé

Experiments: SAP Technical Architecture & Infrastructure - Audit Tuning & technical management of systems and infrastructures for SAP ERP 6.0, SAP NW 7.0, SRM-MDM 7.0 - Quality, security - Council on Information System
Domains: Utilities - Automotives - Services - Insurances
Formation: Architect (Bordeaux architecture high school) - Data-processing engineer CNAM (option applied numerical methods)
Experience : 21 years on SAP Basis Components (SAP BC) , SAP Architecture & SAP complex Infrastructure

Entreprises

  • GPPCTO - President SAP IT

    2014 - maintenant DRP SAP expertise on DRP solution for TARKETT company.
  • Expertise Dev - Associate

    2013 - 2014 SAP Senior Acrhitect and SI - Responsible of TARKETT DRP Projects
  • Capgemini - SAP Architect Senior

    SURESNES 1994 - 2013 TARKETT : Senior Manager Architect on SAP project to design new ARCHITECTURE and INFRASTRUCTURE with HP 3PAR technology, HP Blade servers, Virtualization with WMWARE ESX and High Availaibility on WINDOWS 2008 R2 & MS SQL SERVER 2008 R2 to reduce the TCO. Proposal of SAP Identity Management to centralise Users provisionning with LDAP ADS, ERP 6.0, EP7, B2B ISA, SAP PI, SAP HCM ERP 6.0 and to manage SSO functions., cost budget values for the new infrastructure and implementation of the solution.
    GENERALI : Senior Architect on PEGASE project for SAP EP 7.0 Ehp1, SRM 7.0, J2EE SUI 7.0, MDM 7.0 under AIX 5.3 & Oracle 10.2g, Add-On SAP Invoice Management 5.2 (OPENTEXT) on SAP R/3 Enterprise 4.7 SR2, scanning software KOFAX (scan of paper bills), FILENET(IBM) usage for storage documents. Workshop management, production of Technical Architecture document, sizing of all environments. Integration of LDAP eDirectory by NOVELL for the authentication and provisionning of users between IAM & SAP EP 7.0 with SSO implementation.
    JC DECAUX : Heterogeneous migration from SAP 46C Solaris/Oracle to Linux/RedHat RHEL5-x86_64/Oracle 10.g, Upgrade & Unicode Conversion to ERP 6.0 EhP4 SR1 with two poductive lines.
    IMPRESS : Project SRM-MDM Catalog 3.0 MDM and 7.01. POC on the solution of catalog management with SAP SRM-MDM Catalog connected to ECC 6.0. Senior Architect to define target architecture & sizing of SRM-MDM Catalog 3.0 for 30 catalogs (6 000 000 catalog entries), installation, administration & tuning of SRM MDM Catalog 3.0 (Suse Linux-DB2).
    CEA : Project SRM-MDM Catalog 2.0, MDM 5.5 for CEA. POC on SRM-MDM Catalog connected to SRM 4.0. Senior Architect, design & sizing of target architecture SRM-MDM Catalog 2.0, management of 55 catalogs (1 000 000 catalog entries), installation (Windows 2003, SQL SV 2005), administration & tuning system, training of CEA SAP administrators.
    ERDF : Senior architect to design General Technical Architecture, Workshop management. SAP involved components for the solution: EP 7.0, ERP 6.0 IS-U, BI 7.0, PI 7.1, Netweaver CE 7.1 SSM 7.0 Wily Introscope with V8, SLD 7.1. Definition of DRP architecture, primary site with High Availability (HA), OS AIX 5.3 64 bit. Sizing of all components for 2 Rollout with 18 environments, that is 128 sizing taking into account replication technologies V3.2/IBM GPFS, Oracle RAC cluster V10.2g and CRS.
    ALSTOM : SAP Basis Manager to setup the Europe ALSTOM SAP organisation (Europe (UK, DE, CH, FR,IT), Brasil) for 22 SAP productive systems (SAP 46C, SAP 4.7) and 30 other SAP systems.
    LA POSTE COURRIER : Senior Architect for the ‘Courrier’ project, architecture design for SAP ECC 6.0, EP 7.0, PI 7.0, BI 7.0, SSM 7.0, NWDI under HP UX 11i & Oracle 10g, transport management with SSM CHARM (Service desk, Incident management…), sizing of all environments (production : 2 500 000 CO documents, peakload 4H, ECC 6.0 & EP 6.0 : 2600 users, BI 7.0 : 1100 users, PI 7.1 : 30 messages/s).
    EDF : Senior architect for technlology survey on SAP NetWeaver 2004s : upgrades strategy for SIMMS project (CRM 5.0, BI 7.0, ECC 6.0 (ISU)). SAP expertise on SAP installations & TUNING (CRM & R/3 Enterprise). Audit of SERVAL production systems for 16000 users on SAP R/3 46C SR2 under AIX/ Oracle, migration AIX 4.33 & Oracle 8.1.7 to AIX 5.2 & Oracle 9.2 64 bits. Architecture gap analysis & new sizing for IRIS, MAGELLAN & GCN productive SAP systems.
    SFR : Senior architect for the P2P eProc project. Design of the target architecture, sizing, technical organisation, installation control, administration and going alive activities for SRM 3.0, ITS 6.20, IPC 4.0, Req. V4, CS 6.20, EP 6, Readsoft, WIN 2000/Oracle 9.2.
    ADP : Technical manager for the PEGASE ePRoc project (SAP SRM 3.0/EBP 4.0/ EAI BIZTALK, R/3 46C, ITS 610, Requisite BugseYe, Poet Server, AIX/Oracle) for 3000 users, design of the target architecture, sizing, production of the Technical Architecture document and operation books
  • SAP France - SAP Expert Basis System Consultant on SAP/R2

    Paris 1991 - 1993 Courses followed on SAP/R2
    RS110 : tuning of SAP system under CICS
    RS112 : debugging of SAP system under CICS
    RS020 : architecture of SAP system under CICS
    RS312 : interactive reporting with ABAP
    RS340 : DATA DICTIONNARY
    RS690 : introduction to EDI
    RS015 : management of authorizations under SAP version 50X
    Education followed on SAP/R3 (UNIX-ORACLE)
    BC010 : Basic system R3
    BC020 : administration of SAP system R3

    Education followed on IBM products
    BE530 : MVS/ESA (from MVS/ESA SP4.2 to MVS/SP 2.2)
    OPC : production with OPC/ESA
    CI900 : Course delta CICS v3
    DB805 : DB2 concepts and utilities
    DB841 : DB2 structure and applications
    DB850 : DB2 for the production
    IM250 : IMS management of the DB and DC system
    IM297 : IMS/DBRC recovery & restart, security and sharable DB

    Teacher course on SAP / R2 (v44x and v50x)
    RS210 : basis application course
    RS010 : basis system course RS030 : architecture of SAP under IMS
    RS510 : maintenance of SAP system
    RS520 : installation - put level - migration
    RS310 : basic course ABAP 4
    RS311 : interface with SAP
    DELTA 5x: course delta 50x

    System consultant under SAP/R2:
    - Installation of SAP (CICS/IMS/VSAM/DL1/DBCTL on MVS/ESA and DOS/VSE)
    - ADDENDUM of component 43B and 50C (addendum)
    - MIGRATION from V43X to 44X and 50X
    - PUT LEVEL from 44B to 44C
    - ADDENDUM of complex corrections or special functions (transport module)
    - holding the hotline system
    - Council and tuning of SAP production systems for the following customers: TOTAL - TRT - SAT - VALLOUREC - RHONE POULENC AGRO - ELF AQUITAINE - EUROCOPTER
    - Education given to the clients around 70 days/year + specific courses.
  • CAP GEMINI SOGETI - Expert on TELEMATIC systems

    1983 - 1991 1990
    Expert on TELEMATIC systems on main frame IBM, Basis System knowledge on the SAP/R2 product.
    1989
    Maintenance, UPGRADE MULTITEL 90 product (400 000 lines of assembler and macro assembler code with GTM-OSI).
    File Transfert Protocol ETEBAC/4 integration to MULTITEL 90.
    CARD MEMORY integration in MULTITEL 90 for security features.
    Management of 6 engineers to realize new MULTITEL functions (600 days, 2 MF).
    1988
    Management of 3 engineers for the conception, analysis and achievement of MULTITEL 90 running under GTMOSI (180 days, 1 MF).
    Sale of news functions on MULTITEL 90.
    Management of 2 engineers on this project (120 M Days, 700 KF).

    1987
    MULTITEL90 software product manager (GTM-CICS-IMS).
    Sale, Installation, Maintenance of this product in 13 CREDIT AGRICOLE departments.
    Sale of MULTITEL 90 for the bank BNP and integration of this product to the new TELEMATIC network architecture of this bank (NAT).
    Project leader with 6 engineers for conception, analysis and realization of the MULTITEL 90 version under IMS V210 with news functionnalities for the BNP bank.

    1985 - 1986
    Manager of the VIDEOTEX monitor TEXAGRI-IBM for the CREDIT AGRICOLE bank.
    Definition of standards VIDEOTEX with ARCHITEL concepts.
    Study and achievement of the cohabitation of TEXAGRI concepts with the native VIDEOTEXT monitor MULTITEL20/40 owned by CAP GEMINI (MULTITRANS under MVS/SP,MVS/XA, CICS GTM).
    Conception and realization of monitor TEXAGRI/IBM under GTM for the management of the network, the MINITEL data presentation with hierarchical data model.
    Achievement of transactions and data base access for this server (30 Transactions and 10 DB).
    Management of 10 engineers on this project (1200 days, cost 4 MF).

    Oct 1983 - Apr 1985
    Engineer manager for "systemic study for electronic card risks" project for CREDIT AGRICOLE bank (methods RACINES & MERISE).
    Authorization system and opposition system conception, acceptance of this systems and management of 4 engineers.
  • SG2 - Project Leader on Network software development

    1981 - 1983 Nov 1982 - Sept 1983
    Manager for BULL environment of the network administration in the project MAJIC II attached to the MINISTERY OF TAX.
    Network administration specification under DSA (Distributed System Architecture) and heterogeneous terminals for the company DASSAULT ELECTRONIC SYSTEMS (ESD).
    New functions development to survey and manage the network with applications running under TDS and ISDII on DPS7/GCOS7 monitor.

    Nov 1981 - Nov 1982
    Project manager with 3 engineers to connect bank terminals of ESD (money distributor) in VIP7700/7760 teleprocessing procedure, to a BULL 64/66 and MINI6 computers.
    Emulation of the application layer with transactions under TDS/HB66 across front end DN355 / DN7100 running with GRTS and DNS software (300 Man DAYS, cost 2 Million Francs).

  • INTERTECHNIQUE - Software Engeener

    1980 - 1981 Conception and realization of a software to connect banking terminals of the SOCIETE GENERALE Bank
    for the RTA (Réseau Terminaux d'Agences) project with micro Z80 in BSC3270 procedure, across the MULTI/10S computer from the INTERTECHNIQUE Company.
    Product leader on OASIS system under IN55 provided by the company PHASE ONE CORPORATION in California (USA).
    Coding an emulation protocol BSC 2780/3780 to connect the IN55 computer to the CISI network (AMDHAL & IBM main frames).
  • SSII INFORMATIS - Software Engeener

    1978 - 1980 Conception and achievement of a 'PROCESS CONTROL' software sorting posts with HM12 and HM13 machine of the THOMSON Company for 'La Poste' Group.
    Project manager with 4 engineers to connect 'TTS7800 station sorting banking cheque' to the COLLINS network of the bank CREDIT LYONNAIS.
    (layer SDLC, station of transport SVM, file transfer protocol BI/BO and applicative transactions correcting electronics cheque under the CD2 V7 monitor of the BULL company).
  • MINISTRY OF TOWN and COUNTRY PLANNING (CETE Bordeaux) - Software Engeener

    1971 - 1978 Manager of "PROCESS CONTROL and TELECOMMUNICATIONS" entity (5 persons).
    ARPA, CYCLADES, RCP, TRANSPAC networks thesis.
    TELE PROCESSING network administration for the Regions Ministry located in BORDEAUX city
    (20 Remote Batch Stations and 40 time sharing terminals connected to SIRIS8/C10 monitor of BULL).
    Cluster terminals study of MITRA 15 stations using the TMM Remote Batch and TMM UC protocol.
    Remote Batch software RB1 and RB2T development.
    Conception and coding of new specific software to connect the BENSON plotter to IRIS80/SIRIS8 machine in "real time".
    Generation of remote batch stations in multi tasks environment with the SIRIS8 monitor (Stations under MITRA MTRD monitor from BULL Company).

Formations

Pas de formation renseignée

Réseau

Annuaire des membres :