-
Technip
- Lead Instrumentation, Control System and telecommunication
Paris
2012 - maintenant
LEED INSTRUMENTATION, CONTROL SYSTEMS and
TELECOMMUNICATION -
Engineering Feed & EPC Contract - MOHO NORD phase 1Bis - TOTAL
- Responsible of the contractual scope of work
- Responsible of the Manhour and Cost Budget ;
- Management of the interface with client and other external entities (Licensors) ;
- Management of the Quality and HSE for the discipline ;
- Management of the schedule of the activities and mobilisation plan ;
- Coordination of the ICST activities with the engineering multi-disciplines ;
- Organisation and management of the ICST team ;
- Management of the performance appraisal of the ICST team in charge ;
- Report to engineering management and to head of ICST service ;
- Definition of the initial quantities and track the changes (material quantity, MTO...) for subcontracts) ;
- Assistance to the procurement (vendor list, vendor selection, ..) and subcontract management (breakdown, price, schedule,)
- Assistance to the documentation Controller (document distribution matrix, document list...)
-
Technip
- INSTRUMENTATION ENGINEER
Paris
2010 - 2012
Engineering EPC Contract - Plateau Maintenance Project, Qatar
- Issue of material conception design specifications, data sheets, requisitions for order and technical bid tabulations for flowmeters, control valves, on/off valves
- Supervision of instrument studies performed by other operating centers (India) and checking of relevant documents as per coordination procedure
- Vendors follow-up after purchase
- FAT
PAHNTOS ENGINEERING - (Paris)
-
PAHNTOS ENGINEERING
- INSTRUMENTATION SITE ERECTION SUPERVISOR
Asnières-sur-Seine
2009 - 2010
INSTRUMENTATION SITE ERECTION SUPERVISOR - TOTAL (CERT)
Lindsey Oil refinery HDS3 project - United Kingdom
- Supervise Engineering Contractor and E&I Sub-Contractor work activities during plant erection
- Ensure that construction / installation is in line with Company specifications, procedures,
method statements and schedule
- Monitor Pre-commissioning activities, liaise with Commissioning department and report to head of Project
-
PAHNTOS ENGINEERING
- INSTRUMENTATION & INSTALLATION ENGINEER
Asnières-sur-Seine
2008 - 2008
Engineering FEED Contract - ARZEW Ethane recovery unit, Algeria - TECHNIP Paris
- Issue of conception design specifications for instrumentation and installation in coordination
with Client project team (control and on/off valves, relief valves, instrument cables, instrument
installation...)
- Issue of material requisition for pricing and follow-up with Vendor.
- Estimation works in instrumentation for the total cost of the investment project
- Involvement to Vendor design technical meeting for major packages in coordination with client project team.
-
PAHNTOS ENGINEERING
- INSTRUMENTATION DEPUTY LEAD ENGINEER
Asnières-sur-Seine
2007 - 2008
Engineering FEED Contract AL SHAHEEN refinery, 250 000 Bpsd crude, Qatar - TECHNIP Paris
- Issue of conception design specifications for instrumentation materials and sub-systems (Compressor Control system, Machine Monitoring System, Burner Management System) in coordination with Client project team
- Supervision and coordination of Technip Abu Dhabi engineering works
- Issue of material requisition for pricing and follow-up with Vendor.
- Estimation works in instrumentation for the total cost of the investment project
- Involvement to Vendor design technical meeting for major packages (compressors) in
coordination with client project team.
-
PAHNTOS ENGINEERING
- INSTRUMENTATION FIELD ENGINEER
Asnières-sur-Seine
2007 - 2007
QATARGAS II PROJECT for LNG trains - TECHNIP in Qatar
- Technical support to construction for instrumentation design problems raised on site
- Update and ensure that instrumentation documents and data base are revised in order to prepare final documentation
-
PAHNTOS ENGINEERING
- INSTRUMENTATION ENGINEER
Asnières-sur-Seine
2006 - 2007
Engineering EPC Contract - QATARGAS II PROJECT for LNG trains, Qatar - TECHNIP Paris
- Issue of design base data sheets (Intools software) and material requisition for inquiry/purchase (Control valves, on/off valves and transmitters)
- Analyse of technical offers, clarification & Kick-Off meetings with vendor and client for
final technical bid tabulation
- Vendor design and fabrication follow-up
- Level design studies ;
- Requisition leader for a desuperheater package (FAT, SAT)
-
PAHNTOS ENGINEERING
- INSTRUMENTATION ENGINEER
Asnières-sur-Seine
2006 - 2006
Engineering EPC Contract - DALIA FPSO - TECHNIP Paris
- Intrinsic safety loops study
Engineering EPC Contract - OFON2/AMENAM TIE-IN PROJECT, Nigeria - TECHNIP Paris
Instrumentation & system study of the impact of the export gas sea line between
OFON2 platform (future) and AMENAM 1&2 platforms.
- Issue of instrument design data sheets (S4I software) and material requisition for
inquiry/purchase
- Feasibility studies
- Vendor design and fabrication follow-up
- Instrument List (S4I software)
- Coordination meeting with the Company ;
- Study of field instruments modification/integration in an existing installation (instruments cable routing, loop diagrams, marshalling cabinet modification/implementation...)
-
SEITHA TECHNICAL & REALIZATION - (SUEZ GROUP - Lyon)
- HVAC SUPERINTENDENT
2003 - 2005
Chemical, Pharmaceutical, Tertiary Sectors & Tunnel Ventilation Systems
- Managing and supervising commissioning teams (up to 10 French technicians - Multi sites)
- Managing and supervising the external contractors (up to 1 M EUR / year)
- Estimation & Cost Control of Projects ;
- Elaboration of tenders to suppliers and analysis of proposals ;
- Team management planning (MS Project) ;
- Several technical operations during the guarantee period for the EL HAZAR ROAD TUNNEL in EGYPT
-
SEITHA TECHNICAL & REALIZATION - (SUEZ GROUP - Lyon)
- COMMISSIONING AND START-UP PHASES ENGINEER
1999 - 2003
Chemical, Pharmaceutical, Tertiary Sectors & Tunnel Ventilation Systems
- Several site surveys ;
- Several Site Acceptance Tests and Factory Acceptance Test ;
- Commissioning, run tests and start up
EL HAZAR ROAD TUNNEL in EGYPT (during 3 years) - VINCI France
- E&I Supervisor on site for construction, commissioning and start-up phases
- Managing and supervising a team of 5 Egyptian technicians.
-
MESSIER BUGATTI GROUP – CARBON INDUSTRIE - Lyon
- INSTRUMENTATION MAINTENANCE TECHNICIAN
1997 - 1999
Perform the corrective & preventive maintenance plan in electricity and instrumentation ;
- Main manager for a Computerized Maintenance Management Systems project on site ;
- Start-up of industrial Furnaces
- Writing of calibration test procedures ;
- Control process programming and configuration for an industrial heater