Mes compétences :
Industrialisation de l'exploitation
Air Traffic Management
Ingénieur système
Aerospace
Team management
Avionics
Production
Analyse de données
Python
MATLAB
Entreprises
Airbus
- Digital Ambassador & Data Analyst for Airbus Quality Engineering
Blagnac 2018 - maintenantCoordinating development of Digitalization & Data Analytics for Airbus Quality Engineering.
Investigating and developing business opportunities.
Development
Coordination of Quality Engineering performance management
Airbus Group
- Head Of Production Control
Blagnac 2016 - 2018Lead a team of 12 white collars and 3 temps.
Ensure delivery on time for Machining & Forming parts.
250000 parts delivered/year, 40 work centers.
Airbus Group
- Production Control Deputy
Blagnac 2015 - 2016Deputy HO Production Control Machining Unit St ELOI
Leading industrialization of A320 NEO & A330 NEO for machined parts
Airbus
- Responsible for Program Industrialization of A350 Systems, AIRBUS
Blagnac 2012 - 2015• Solve major system delivery slippage in coordination with Production, Design Office, Procurement to secure Aircraft planning
• Update Aircraft Production sequence to improve lead times
• Manage at aircraft level industrialization of system updates to ensure Production Ramp-up.
Achievements:
Save 8.1M€ to Airbus by adapting the hydraulic test work sharing
Manage industrial retrofit campaign on A350 (roughly 9000 equipment retrofit to reach Type Certificate)
Ensure industrialization aspects through configuration management process
Airbus
- System Designer on A320 Avionics, AIRBUS
Blagnac 2009 - 2012 Technical focal point for aircraft functions design:
• Gather operational needs from airlines, pilots and air traffic control centers
• Lead Technical definition and Operational Verification and Validation activities
• Support standardization activities
Achievements:
Coordination of a multi-disciplinary teams with International partners (supplier management)
Sub-contractors Management
Displayed creativity and innovation: 2 patents issued in 2011& 2012
Initial 4D Flight Test February 2012, ASPA S&M flight test 2012, Initial 4D project rewarded at ATC Global 2012
AEROLIA
- Production Engineer Assistant
Colomiers2007 - 2007Worked on reorganization of A380 landing gear compartment assembly
Achievements:
Decreased the production time and costs by 25%
Reduced bottlenecks and find curative solutions by re-organizing work-stations
Classes préparatoires
- Etudiant Grandes Ecoles
2003 - 2005
Formations
Georgia Institute Of Technology Georgia Tech (Atlanta, Ga)