  • ECM - Site manager

    velizy villacoublay 2014 - maintenant Discipline: CPF-pipe line
    Client: OMV (Sahara-Tunisia)
    Project: EPCC AED Trunkline (52 km of pipeline Ø8)''
  • ECM - Site manager

    velizy villacoublay 2014 - 2014 Discipline: Bolted tank
    Client: STORM (Sahara-Tunisia)
    Project: Installation of 4 bolted tanks, each tank's capacity is 5000 bbl of crude oil.
  • ECM - Construction Supervisor

    velizy villacoublay 2014 - 2014 Discipline: Pipeline
    Client: STEG (Rades-Tunisia)
    Project: Underground electrical cable: construction of 3 casing with Ø24'' of diameter, the project collaborated with HDI French company for important horizontal drilling.
  • ECM - Commercial

    velizy villacoublay 2013 - 2013 Job position: Commercial.
    Discipline: Bolted tank
    Client: STORM (Sahara-Tunisia)
    Project: The tender: Supply and installation of 4 bolted tanks.
  • ECM - Site manager

    velizy villacoublay 2013 - 2013 Discipline: Pipeline & Piping work
    Client: OMV (Sahara-Tunisia)
    Project: Preparation (shop prefabrication of pipe support) & Installation of new shipment line Ø6''.
  • ECM - Site manager

    velizy villacoublay 2013 - 2013 Discipline: Piping work
    Client: TOTAL (Rades-Tunisia)
    Project: Supply, prefabrication and installation of a new firefighting for 4 tank with medium capacity.
  • ECM - Supervisor

    velizy villacoublay 2013 - 2013 Discipline: Mechanical / Piping work
    Client: TOTAL (Rades-Tunisia)
    Project: Maintenance work of supply lines of oil storage tanks
    Repair floating roof and seal
  • ECM - Commercial

    velizy villacoublay 2012 - 2013 Job position: Commercial.
    Discipline: Pipeline / shelters
    Client: ENI (SAHARA of Tunisia)
    Project: The tender: AO ENI firefighting system upgrading OZ.
    The tender: ENI n°41166 KARMA Gas Lift Line.
    The tender: ENI supply of vertical flare system.
  • ECM - Commercial

    velizy villacoublay 2012 - 2012 Job position: Commercial.
    Discipline: Pipeline
    Client: STEG Gaz (North of Tunisia)
    Project: The tender: Pipeline Ø8'' & Ø4''
  • ECM - Commercial

    velizy villacoublay 2012 - 2012 Job position: Commercial.
    Discipline: CPF
    Client: PPI Technology Services / WAHA OIL COMPANY (Gialo-Lybia)
    Project: The tender: NORTH GIALO EARLY PRODUCTION PROJECT
  • ECM - Commercial

    velizy villacoublay 2012 - 2012 Job position: Commercial.
    Discipline: Tank
    Client: SIRTE (Brigua-Lybia)
    Project: The tender: Supply and reparation of three tanks with floating roof and big capacity damaged in the last war (revolution).
  • MEDCO - Site manager

    2011 - 2012 Discipline: Pipeline
    Client: SAROST / TPS (Kharkenah-Tunisia)
    Project: Installation a new of 10km pipe ligne Ø6 off & on shore.
  • MEDCO - Site manager

    2011 - 2011 Discipline: Piping
    Client: SAROST / SEREPT (Kharkenah-Tunisia)
    Project: construction of two to conduct underwater electrical cables for the platform of ASPF2-SEREPT.
  • MEDCO - Construction Supervisor

    2011 - 2012 Discipline: Structure steel
    Client: ENI (Sfax-Tunisia)
    Project: Supply and prefabrication of 300 ton of structures steel.
  • SCIN - Site manager

    Sfax 2008 - 2011 Discipline: Mechanical / Structure steel / steel work / Tank / Pressure Vessels
    Client: TIFERT (Skhira-Tunisia)
    Project: Supply, prefabrication & erection of two tanks for acid sulphuric (capacity 5000m³).
    Supply, prefabrication & erection of a Stainless steel converter (Ø15-H20, (330 ton).
    Supply, prefabrication & erection of three big three tours for acid sulphuric.
    Supply, prefabrication & erection of one chimney 50 m.
    Supply, prefabrication & erection of 8 Pressure Vessels different capacity.
    Supply, prefabrication & erection of 2500 ton structures steel.
  • Bouchammaoui Industries BI - Superintendent

    2008 - 2008 Job position: Erection superintended.
    Discipline: Tank
    Client: PIONNER (SAHARA-Tunisia)
    Project: Supply, prefabrication & erection of 2 OIL crude Storage tanks with 5000m³ of capacity.
  • Bouchammaoui Industries BI - Superintendent

    2008 - 2008 Job position: Erection superintended.
    Discipline: Tank
    Client: SNDP (Rades-Tunisia)
    Project: Supply, prefabrication & erection of a water tank without roof (Ø20ml).
    Supply, prefabrication & erection of 4 spheres (Punch list & test)
  • SCIN - Supervisor

    Sfax 2007 - 2007 Discipline: Steel work
    Client: COPIT (Tunis-Tunisia)
    Project: Supply, prefabrication & erection of shelters caddy.
    Discipline: Pipeline
    Client: TANKMED (Skhira-Tunisia)
    Project: Reparation of 1 Km of pipeline 20'' between the storage area and the maritime docks.
  • SCIN - Site Manager

    Sfax 2007 - 2007 Discipline: Structure steel
    Client: MTT / ATTT (Gabes-Tunisia)
    Project: Supply, pprefabrication & erection of steel building for the technical center
  • SCIN - Supervisor

    Sfax 2006 - 2006 Discipline: Tank
    Client: STEG (Sousse-Tunisia)
    Project: Installation new internal piping heater serpentines for fuel Storage tank (Ø20ml).
    DAXTRA MERGED
  • SCIN - Site manager

    Sfax 2006 - 2006 Discipline: Mechanical & Piping work
    Client: ALKIMIA (Gabes-Tunisia)
    Project: Demolish & erection of new ventilator and piping into chemical installation.
  • SCIN - Superintended

    Sfax 2006 - 2007 Job position: Erection superintended.
    Discipline: Tank
    Client: PIRECO / SOUR-GAZ / BG (Nakta-Tunisia)
    Project: Supply, prefabrication & erection of 1 tank with smaller capacity, HANNABAL project for BGT terminal.
  • SCIN - Site Manager

    Sfax 2006 - 2007 Discipline: Tank
    Client: PIRECO / PETROFAC / BG (Nakta-Tunisia)
    Project: Supply, prefabrication & erection of 6 tanks project HASDRUBAL for BGT terminal.
  • SCIN - Site Manager

    Sfax 2006 - 2006 Discipline: Structure steel / Tank
    Client: BMT (Feriana-Tunisia)
    Project: Supply, prefabrication & erection of medium steel building.
    Supply, prefabrication & erection of two tanks in stain steel with smaller capacity.
  • SCIN - Designer & supervisor

    Sfax 2006 - 2006 Discipline: Shipbuilding
    Client: ``MEDINE PÈCHE MARINE'' (Sfax-Tunisia)
    Project: Trawler 25ml for an Algerian Company.
    DAXTRA MERGED
  • SCIN - Site Manager

    Sfax 2006 - 2007 Discipline: Mechanical / Structure steel / steel work for the second Power Generation Thyna II
    Client: PIRECO / GEII (Thyna-Tunisia)
    Project: Supply, prefabrication & erection of steel building.
    Prefabrication, erection of chimney (30ml length)
    Installation of mechanical equipment's
    Reparation chimney for the first Power Generation Thyna I
    Supply, prefabrication & erection of ladders acces of three building steel for the first Power Generation Thyna I-Feriana-Goulette
  • SCIN - Designer & quantity surveyor

    Sfax 2006 - 2006 Discipline: Shipbuilding
    Client: SOMATRA (Sfax-Tunisia)
    Project: Reparation of two decks « SIDI SALEM & SIDI DAOUD ».
    Discipline: Pipeline
    Client: TANKMED (Skhira-Tunisia)
    Project: Reparation of 1 Km of pipeline 20'' between the storage area and the maritime docks.
  • SCIN - Designer

    Sfax 2005 - 2005 Discipline: Steel work
    Client: POLYSUS (Oum Khelili-Tunisia)
    Project: Supply, prefabrication of steel work equipment for new cement installation Company.
    DAXTRA MERGED
  • SCIN - Supervisor

    Sfax 2005 - 2005 Discipline: Steel work
    Client: CPG (Moulares-Tunisia)
    Project: Installation a new rotary dryer with multi-tubes for phosphate.
    DAXTRA MERGED
  • SCIN - Site Manager

    Sfax 2005 - 2005 Discipline: Steel work
    Client: MTT / KNAUF (Meknassi-Tunisia)
    Project: Supply, prefabrication & erection of 3 Silos «Ø8ml, 22m length », « Ø5ml, 9m length», «Ø3ml, 5m length» for Plaster Company.
  • SCIN - Supervisor

    Sfax 2005 - 2006 Discipline: Piping
    Client: TRAPSA (Skhira -Tunisia)
    Project: Supply, prefabrication, installation a fire water system around a 11 tanks with floating roof (Ø56ml).
  • SCIN - Supervisor

    Sfax 2005 - 2005 Discipline: Tank
    Client: GCT (Gabes-Tunisia)
    Project: Supply, prefabrication, installation a new two Pressure Vessels for chemical installation.
    DAXTRA MERGED
  • SCIN - Supervisor

    Sfax 2004 - 2004 Discipline: Tank
    Client: STEG (Gabes-Tunisia)
    Project: Installation new internal piping heater serpentines for fuel Storage tank (Ø20ml).
    Discipline: Spheres
    Client: SUDGAZ / SHELL (Gabes-Tunisia)
    Project: Reparation of spheres supports for ``S1 & S2''
  • SCIN - Supervisor

    Sfax 2004 - 2004 Discipline: Spheres
    Client: SUDGAZ / SHELL (Gabes-Tunisia)
    Project: Replacement all piping & accessories of Gas Spheres ``S1 & S2''
  • SCIN - Supervisor

    Sfax 2004 - 2004 Discipline: Tank
    Client: TANKMED (Skhira-Tunisia)
    Project: Replacement a new bottom for three tanks with fixed roof (Ø20ml).
  • SCIN - Designer

    Sfax 2004 - 2004 Discipline: Tank
    Client: TANKMED (Skhira-Tunisia)
    Project: Replacement a new bottom for three tanks with floating roof (Ø56ml).
  • SCIN - Supervisor

    Sfax 2004 - 2004 Discipline: Tank
    Client: TRAPSA (Skhira-Tunisia)
    Project: Replacement a new bottom for three tanks with floating roof (Ø56ml).


    WORK PERFORMED AND COMPETENCIES OFFERED

    MANAGEMENT * Preparation before starting project (Materials, Man power, Equipments...)
    SUPERVISING * Coordination from procurement, design, shop prefabrication and painting, delivery to the site.
    CONTROL * Coordination between the site, client, third party.
    * Ability to management different teams in site or shop ;
    * Ensure prefabrication, erection, welding, control is carried out code, specification, procedure, WPS, ITP. ;
    *

    PLANNING * Elaboration of schedule high level and detailed level for execution ;
    * Planning updating according actual progress of performed activities

    REPORTING * Elaboration of progress reports: daily, weekly and monthly
    * Critical path and variance analysis
    Discipline: Tank
    Client: TRAPSA (Skhira-Tunisia)
    Project: Reparation of roof floating roof for tank (Ø56ml).
  • SCIN - Chef projet

    Sfax 2004 - maintenant

Formations

  • Iset Gabes (Kebili)

    Kebili 2001 - 2004 Technicien Supérieur

    High technician in mechanical construction & fabrication ISETG institute « Institut Supérieur des Etudes Technologiques de GABES »

Réseau

Annuaire des membres :