Lionel PORTIER

COURBEVOIE

En résumé

Experience on oil and gas field made on Commissioning, Start Up and Production activities.

Involved in OPERCOM stages such as Pre-Commissioning follow up, Commissioning, Operational Test Procedure, High Pressure Leak Test, Process Start Up and Process Optimization.

Involved in Plant Capacity test, plant shutdown Preparation/Follow up and Personal Training. Experience settled from on-shore eruptive wells, HP oil & gas process, H2S oil & gas Treatment, Heavy oil process, FPSO, FPU and LNG plant.

Mes compétences :
Assessment
Commissioning
Production
Startup
Training
Gas Dehydration
Heavy Crude Oil
Gas Lift
Gas Injection
Gas Compressors
COM/DCOM
Ariel
Plant shutdown Preparation
Coordinate plant preparation
Vapour Recovery Units
Technical support
Sulphur Removal
Plan Shut Down Preparation
Microsoft Word
Microsoft PowerPoint
Microsoft Excel
Logging Unit preparation
GOSP
FPSO
Diesel
API

Entreprises

  • Total - Process Commissioning Leader

    COURBEVOIE 2015 - maintenant
  • TOTAL E&P Russia - COMMISSIONING SITE LEADER

    COURBEVOIE 2012 - 2015 TOTAL E&P RUSSIA, (KHARYAGA PROJECT / H2S OIL PRODUCTION)
    * Well Pads Extension including new wells and new facilities (Chemical Inj, EDG...).
    * Production Plant revamping for Gas Treatment, Oil storage, Water treatment & injection.

    COMMISSIONING SITE LEADER
    * In charge of In-House Commissioning Activities on Well Pads. ;
    * CPY CSL for plant revamping (EPCC).
  • TOTAL E&P Russie - Commissioning Site Leader

    COURBEVOIE 2012 - maintenant - Well Pads Extension , Gas Treatment Unit implementation

    COMMISSIONING SITE LEADER

    - In charge of Commissioning Activities.
  • TOTAL E&P Indonésie - Process Commissioning Superintendent

    COURBEVOIE 2011 - 2012 - 3 Plateforms of gas production

    PROCESS COMMISSIONING SUPERINTENDENT

    - Elaborate OTP. HP LEak Test Procedure
    - Perform On-Shore / Off-Shore commissioning
  • TOTAL E&P Indonesia - PROCESS COMMISSIONING SUPERINTENDENT

    COURBEVOIE 2011 - 2012 TOTAL E&P INDONESIA, (SOUTH MAHAKAN PROJECT / GAS PRODUCTION)
    * 3 Platforms under Construction / Pre-Commissioning / Commissioning.

    PROCESS COMMISSIONING SUPERINTENDENT
    * Construction and Pre-Commissioning follow up on Construction yard.
    * Elaborate Operational Test and HP Leak Test Procedures.
    * Validate Punch item and RFC Dossier In Process / Mechanical field.
    * Perform OTP and follow Up HP Leak Test Activities. ;
  • Yemen LNG - PRODUCTION COORDINATOR

    2010 - 2011 * 2 Trains of LNG Production (430 T/H each). ;
    * Amine / Molecular dryer / Mercury Removal on Warm End. ;
    * APCI Cryogenic Heat Exchanger and 2 Elliott Compressors for PR & MR Loop.

    PRODUCTION COORDINATOR
    * Coordinate Production activities.
    * Elaborate Isolation plan in Work Permit.
    * Plan Shut Down Preparation. ;
  • YEMEN LNG - Start Up Shift Superintendent

    2010 - 2011 - 2 Trains of LNG Production (430 T/H each)
    - Amine / Molecular dryer / Mercury Removal on Warm End.
    - APCI Cryogenic Heat Exchanger and 2 Elliott Compressors for PR & MR Loop

    START UP SHIFT SUPERINTENDENT

    - Follow Up pre start Up Activities.
    - Follow Up Defrost Activities.
    - Start Up Train 2 Warm End.
    - Follow up Cold End Start Up.
  • YEMEN LNG - START UP SHIFT SUPERINTENDENT

    2010 - 2010 YEMEN LNG, (BALHAF)
    plant description on here above experience

    * Follow up pre-start up activities (Construction, Pressure Leak Test ...). ;
    * In charge of Dry Out Activity. (Derime)
    * Start up Train 2 Warm end.
    * Follow Up Cold End Start up. ;
  • WATER TREATMENT AND WATER INJECTION START UP - START UP ADVISER

    2008 - 2008 * Construction and sail away follow up from South Corea. ;
    * Elaborate procedure OPERGUID for first start up. ;
    * Following commissioning and start up as technical support.
    * Start Up leader on sulphate reduction package and water injection unit.
  • Total E&P Congo - MOHO BILONDO START UP ADVISOR

    COURBEVOIE 2007 - 2009 MOHO BILONDO FPU – 90000 bbls/d

    - Crude / Gas / Water Production train.
    - Gas dehydration unit (Glycol unit).
    - 2 Centrifuges gas compressors (ManTurbo) / Gas lift & gas export
    - Production Water Treatment.
    - Sea Water treatment for water injection 65.000 bbls/d

    START UP ADVISOR FOR FPU START UP
    START UP LEADER FOR WATER TREATMENT AND WATER INJECTION

    - Construction and sail away follow up from South Corea.
    - Elaborate procedure OPERGUID for first start up.
    - Following commissioning and start up as technical support.
    - Start Up leader on sulphate reduction package and water injection unit.
  • TOTAL E&P - START UP ADVISER

    2007 - 2009 TOTAL E&P CONGO, (MOHO BILONDO FPU Off-shore - 90.000 bbls/d )
    * Crude / Gas / Water Production train.
    * Gas dehydration unit (Glycol unit). ;
    * 2 Centrifuge gas compressors (ManTurbo) for gas lift and gas export (200 bar). ;
    * Production Water Treatment. ;
    * Sea Water treatment for water injection 65.000 bbls/d
  • Total E&P Angola - DALIA FPSO START UP ADVISOR

    COURBEVOIE 2006 - 2007 DALIA FPSO - 250.000 bbls/d
    - 2 Production trains with crude dehydrators and desalters.
    - Gas dehydration unit (Glycol unit).
    - 4 Centrifuge gas compressors for gas lift and gas injection.
    - Production Water Treatment.
    - Sea Water treatment for water injection 450.000 bbls/d

    START UP ADVISOR FOR FPSO START UP
    - Elaborate procedure Operguid for first start up.
    - Following commissioning and start up as technical support
  • TOTAL E&P Angola - START UP ADVISER

    2006 - 2007 TOTAL E&P ANGOLA, (DALIA FPSO Off-Shore - 250.000 bbls/d)
    * 2 Production trains with crude dehydrators and desalters. ;
    * Gas dehydration unit (Glycol unit). ;
    * 4 Centrifuge gas compressors for gas lift and gas injection (300 bar). ;
    * Production Water Treatment. ;
    * Sea Water treatment for water injection 450.000 bbls/d
  • TOTAL VENEZUELA (TOGV) - TECHNICAL ADVISER

    2005 - 2006 * Following commissioning and start up
    TOTAL VENEZUELA (TOGV), Rucio Viejo (Venezuela On-Shore - 40.000 bbls/d)
    * Gas / Oil separation plant (1500 psi Working Pressure)
    * High Pressure eruptives wells remote controlled through optical fiber.
    * Gas reciprocating compressors (Ariel) @ 1500 psi ;
    * Gas dehydration unit (Glycol unit).
    * Diesel and Gas Power generation. ;
    * Water (4100 psi) and Gas (7300 psi) injections.

    PRODUCTION SUPERVISOR
    * In charge of production activity. ;
  • TOTAL VENEZUELA (TOGV), Rucio Viejo (Venezuela On-Shore) - Production supervisor

    2005 - 2006 - Gas / Oil separation plant (1500 psi Working Pressure)
    - High Pressure eruptives wells remote controlled through optical fiber
    - Gas reciprocating compressors (Ariel) @ 1500 psi
    - Gas dehydration unit (Glycol unit).  Diesel and Gas Power generation.
    - Water (4100 psi) and Gas (7300 psi) injections.

    PRODUCTION SUPERVISOR

     In charge of production activity.
  • SINCOR (Synthetic Oil of the Orinoco) - PRODUCTION SUPERINTENDENT

    2004 - 2005 SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore - 200.000 bbls/d)
    * Gas / Oil / Water separation plant (200.000 bbl/d of extra heavy oil API 8)
    * 2 Production trains / Crude heaters (150.000 bbls each) and electrical dehydrators.
    * Diluted crude from 300 pumped wells (PCP) remote controlled / optical fiber.
    * Water Treatment and Injection Plant. ;
    * 3 Gas screw compressors (300 psi) for 3 GE Turbines power generation (25 Mw).
    * Vapor Recovery Unit lined up with a 115.000 bbls storage tank.

    PRODUCTION SUPERINTENDENT
    * In charge of production activities.
    * Work Permit System optimization. ;
    * Water Treatment Plant (70.000 bbls) Optimization. ;
    * ISO-14001 Implementation. ;
  • SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore) - PRODUCTION SUPERINTENDENT

    2004 - 2005 SINCOR UPSTREAM PRODUCTION
    - Gas/Oil/Water separation plant 200.000 bbl/d of extra heavy oil API 8
    - 2 Production trains / Crude heaters and electrical dehydrators.
    - Diluted crude from 300 pumped wells (PCP) remote controlled.
    - Water Treatment and Injection Plant.
    - 3 Gas screw compressors for 3 GE Turbines power generation (25 Mw).
    - Vapor Recovery Unit lined up with a 115.000 bbls storage tank.

    PRODUCTION SUPERINTENDENT
    - In charge of production activities.
    - Work Permit System optimization.
    - Water Treatment Plant (70.000 bbls) Optimization.
  • SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore) - Plant Shut Down Leader

    2004 - 2004 PLANT SHUT DOWN LEADER during major Shut-Down
     Elaborate ShutDown Procedures (Operguid)
     Coordinate Construction and Operation activities.
     Supervise and coordinate plant preparation for construction Activities.
     Supervise Plant Modification Activities.
  • SINCOR - PLANT SHUT DOWN LEADER

    2004 - 2004 SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore)
    plant description on here above experience
    PLANT SHUT DOWN LEADER during major Shut-Down
    * Elaborate ShutDown Procedures (Operguid) ;
    * Coordinate Construction and Operation activities. ;
    * Supervise and coordinate plant preparation for Construction Activities. ;
    * Supervise Plant Modification Activities. ;
  • TOTAL VENEZUELA (TOGV), Rucio Viejo (Venezuela On-Shore) - Production Supervisor

    2004 - 2004  In charge of production activity.
     Supervise partial Shutdown (internal vessel clean-up).
     Commissioning and start up of new gas injection well.
  • TOTAL VENEZUELA - PRODUCTION SUPERVISOR

    COURBEVOIE 2004 - 2004 PRODUCTION SUPERVISOR
    * In charge of production activity. ;
    * Supervise partial Shutdown (internal vessel clean-up). ;
    * Commissioning and start up of new gas injection well. ;
  • SINCOR - START-UP ADVISER

    2001 - 2003 SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore)
    plant description on here above experience.

    * Optimize process operations. ;
    * Supervise particular jobs as units' start-up, Plant shutdown.
    * Elaborate operations procedures (Spanish) and operating guides. (Operguid)
    * Training and assessment of national personal. (Opercap Follow-Up)
    * Prepare and coordinate external audit - (Opersafe Follow-Up)
    * ISRS Implementation (International Safety Rating System - DNV).
    * Acting as Production Superintendent during his vacations.
  • SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore) - START UP Adviser

    2001 - 2003  Optimize process operations.
     Supervise particular jobs as units’ start-up, Plant shutdown.  Elaborate operations procedures (Spanish) and operating guides. (Operguid)
     Training and assessment of national personal. (Opercap Follow-Up)
     Prepare and coordinate external audit – (Opersafe Follow-Up)
     ISRS Implementation (International Safety Rating System - DNV).
     Acting as Production Superintendent during his vacations.
  • TOTAL VENEZUELA (TOGV) - PRODUCTION SUPERVISOR ASSISTANT

    1998 - 2001 PRODUCTION SUPERVISOR ASSISTANT
    * Optimize plant and field operations. ;
    * Supervise particular jobs (Plant shutdown, wells commissioning, injection start up)
    * Elaborate and translate (Eng. / Spa.) operations procedures (Operguid).
    * Training and assessment of national personal. (Opercap follow-up)
    * Chief Operator and Panel Operator replacement. ;
  • SHELL VENEZUELA - Panel operator & chief operator

    1995 - 1997 SHELL VENEZUELA (SVSA), Maracaïbo (Venezuela Off-Shore).
    * Gas / Oil separation platform with desulphurization unit (Amine / Clauss unit).
    * 50.000 bbl/d and 800 kg of sulfur per day (pills fabrication).
    * Steam Generation
    * Vapor Recovery Unit. ;
    * Gas reciprocating compressors (Ariel) for 3 Solar Turbines of 12 Mw each.
    * Heavy oil production with Light Oil lifts (HP oil pumping plant).

    PRE-COM / COM and START-UP
    * Construction Follow up on yard to Plant Start-up ;
    * Panel operator
    * Outside chief operator. ;
    * Training and assessment of national personal.
  • GEOSERVICES COMPANY - Mud logger

    1990 - 1995 * Technical support in base (Logging Unit preparation. Training of personal). ;
    * Acting Base manager.
    * Well Testing / Wire-Line Approach.