-
Total
- Process Commissioning Leader
COURBEVOIE
2015 - maintenant
-
TOTAL E&P Russia
- COMMISSIONING SITE LEADER
COURBEVOIE
2012 - 2015
TOTAL E&P RUSSIA, (KHARYAGA PROJECT / H2S OIL PRODUCTION)
* Well Pads Extension including new wells and new facilities (Chemical Inj, EDG...).
* Production Plant revamping for Gas Treatment, Oil storage, Water treatment & injection.
COMMISSIONING SITE LEADER
* In charge of In-House Commissioning Activities on Well Pads. ;
* CPY CSL for plant revamping (EPCC).
-
TOTAL E&P Russie
- Commissioning Site Leader
COURBEVOIE
2012 - maintenant
- Well Pads Extension , Gas Treatment Unit implementation
COMMISSIONING SITE LEADER
- In charge of Commissioning Activities.
-
TOTAL E&P Indonésie
- Process Commissioning Superintendent
COURBEVOIE
2011 - 2012
- 3 Plateforms of gas production
PROCESS COMMISSIONING SUPERINTENDENT
- Elaborate OTP. HP LEak Test Procedure
- Perform On-Shore / Off-Shore commissioning
-
TOTAL E&P Indonesia
- PROCESS COMMISSIONING SUPERINTENDENT
COURBEVOIE
2011 - 2012
TOTAL E&P INDONESIA, (SOUTH MAHAKAN PROJECT / GAS PRODUCTION)
* 3 Platforms under Construction / Pre-Commissioning / Commissioning.
PROCESS COMMISSIONING SUPERINTENDENT
* Construction and Pre-Commissioning follow up on Construction yard.
* Elaborate Operational Test and HP Leak Test Procedures.
* Validate Punch item and RFC Dossier In Process / Mechanical field.
* Perform OTP and follow Up HP Leak Test Activities. ;
-
Yemen LNG
- PRODUCTION COORDINATOR
2010 - 2011
* 2 Trains of LNG Production (430 T/H each). ;
* Amine / Molecular dryer / Mercury Removal on Warm End. ;
* APCI Cryogenic Heat Exchanger and 2 Elliott Compressors for PR & MR Loop.
PRODUCTION COORDINATOR
* Coordinate Production activities.
* Elaborate Isolation plan in Work Permit.
* Plan Shut Down Preparation. ;
-
YEMEN LNG
- Start Up Shift Superintendent
2010 - 2011
- 2 Trains of LNG Production (430 T/H each)
- Amine / Molecular dryer / Mercury Removal on Warm End.
- APCI Cryogenic Heat Exchanger and 2 Elliott Compressors for PR & MR Loop
START UP SHIFT SUPERINTENDENT
- Follow Up pre start Up Activities.
- Follow Up Defrost Activities.
- Start Up Train 2 Warm End.
- Follow up Cold End Start Up.
-
YEMEN LNG
- START UP SHIFT SUPERINTENDENT
2010 - 2010
YEMEN LNG, (BALHAF)
plant description on here above experience
* Follow up pre-start up activities (Construction, Pressure Leak Test ...). ;
* In charge of Dry Out Activity. (Derime)
* Start up Train 2 Warm end.
* Follow Up Cold End Start up. ;
-
WATER TREATMENT AND WATER INJECTION START UP
- START UP ADVISER
2008 - 2008
* Construction and sail away follow up from South Corea. ;
* Elaborate procedure OPERGUID for first start up. ;
* Following commissioning and start up as technical support.
* Start Up leader on sulphate reduction package and water injection unit.
-
Total E&P Congo
- MOHO BILONDO START UP ADVISOR
COURBEVOIE
2007 - 2009
MOHO BILONDO FPU – 90000 bbls/d
- Crude / Gas / Water Production train.
- Gas dehydration unit (Glycol unit).
- 2 Centrifuges gas compressors (ManTurbo) / Gas lift & gas export
- Production Water Treatment.
- Sea Water treatment for water injection 65.000 bbls/d
START UP ADVISOR FOR FPU START UP
START UP LEADER FOR WATER TREATMENT AND WATER INJECTION
- Construction and sail away follow up from South Corea.
- Elaborate procedure OPERGUID for first start up.
- Following commissioning and start up as technical support.
- Start Up leader on sulphate reduction package and water injection unit.
-
TOTAL E&P
- START UP ADVISER
2007 - 2009
TOTAL E&P CONGO, (MOHO BILONDO FPU Off-shore - 90.000 bbls/d )
* Crude / Gas / Water Production train.
* Gas dehydration unit (Glycol unit). ;
* 2 Centrifuge gas compressors (ManTurbo) for gas lift and gas export (200 bar). ;
* Production Water Treatment. ;
* Sea Water treatment for water injection 65.000 bbls/d
-
Total E&P Angola
- DALIA FPSO START UP ADVISOR
COURBEVOIE
2006 - 2007
DALIA FPSO - 250.000 bbls/d
- 2 Production trains with crude dehydrators and desalters.
- Gas dehydration unit (Glycol unit).
- 4 Centrifuge gas compressors for gas lift and gas injection.
- Production Water Treatment.
- Sea Water treatment for water injection 450.000 bbls/d
START UP ADVISOR FOR FPSO START UP
- Elaborate procedure Operguid for first start up.
- Following commissioning and start up as technical support
-
TOTAL E&P Angola
- START UP ADVISER
2006 - 2007
TOTAL E&P ANGOLA, (DALIA FPSO Off-Shore - 250.000 bbls/d)
* 2 Production trains with crude dehydrators and desalters. ;
* Gas dehydration unit (Glycol unit). ;
* 4 Centrifuge gas compressors for gas lift and gas injection (300 bar). ;
* Production Water Treatment. ;
* Sea Water treatment for water injection 450.000 bbls/d
-
TOTAL VENEZUELA (TOGV)
- TECHNICAL ADVISER
2005 - 2006
* Following commissioning and start up
TOTAL VENEZUELA (TOGV), Rucio Viejo (Venezuela On-Shore - 40.000 bbls/d)
* Gas / Oil separation plant (1500 psi Working Pressure)
* High Pressure eruptives wells remote controlled through optical fiber.
* Gas reciprocating compressors (Ariel) @ 1500 psi ;
* Gas dehydration unit (Glycol unit).
* Diesel and Gas Power generation. ;
* Water (4100 psi) and Gas (7300 psi) injections.
PRODUCTION SUPERVISOR
* In charge of production activity. ;
-
TOTAL VENEZUELA (TOGV), Rucio Viejo (Venezuela On-Shore)
- Production supervisor
2005 - 2006
- Gas / Oil separation plant (1500 psi Working Pressure)
- High Pressure eruptives wells remote controlled through optical fiber
- Gas reciprocating compressors (Ariel) @ 1500 psi
- Gas dehydration unit (Glycol unit). Diesel and Gas Power generation.
- Water (4100 psi) and Gas (7300 psi) injections.
PRODUCTION SUPERVISOR
In charge of production activity.
-
SINCOR (Synthetic Oil of the Orinoco)
- PRODUCTION SUPERINTENDENT
2004 - 2005
SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore - 200.000 bbls/d)
* Gas / Oil / Water separation plant (200.000 bbl/d of extra heavy oil API 8)
* 2 Production trains / Crude heaters (150.000 bbls each) and electrical dehydrators.
* Diluted crude from 300 pumped wells (PCP) remote controlled / optical fiber.
* Water Treatment and Injection Plant. ;
* 3 Gas screw compressors (300 psi) for 3 GE Turbines power generation (25 Mw).
* Vapor Recovery Unit lined up with a 115.000 bbls storage tank.
PRODUCTION SUPERINTENDENT
* In charge of production activities.
* Work Permit System optimization. ;
* Water Treatment Plant (70.000 bbls) Optimization. ;
* ISO-14001 Implementation. ;
-
SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore)
- PRODUCTION SUPERINTENDENT
2004 - 2005
SINCOR UPSTREAM PRODUCTION
- Gas/Oil/Water separation plant 200.000 bbl/d of extra heavy oil API 8
- 2 Production trains / Crude heaters and electrical dehydrators.
- Diluted crude from 300 pumped wells (PCP) remote controlled.
- Water Treatment and Injection Plant.
- 3 Gas screw compressors for 3 GE Turbines power generation (25 Mw).
- Vapor Recovery Unit lined up with a 115.000 bbls storage tank.
PRODUCTION SUPERINTENDENT
- In charge of production activities.
- Work Permit System optimization.
- Water Treatment Plant (70.000 bbls) Optimization.
-
SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore)
- Plant Shut Down Leader
2004 - 2004
PLANT SHUT DOWN LEADER during major Shut-Down
Elaborate ShutDown Procedures (Operguid)
Coordinate Construction and Operation activities.
Supervise and coordinate plant preparation for construction Activities.
Supervise Plant Modification Activities.
-
SINCOR
- PLANT SHUT DOWN LEADER
2004 - 2004
SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore)
plant description on here above experience
PLANT SHUT DOWN LEADER during major Shut-Down
* Elaborate ShutDown Procedures (Operguid) ;
* Coordinate Construction and Operation activities. ;
* Supervise and coordinate plant preparation for Construction Activities. ;
* Supervise Plant Modification Activities. ;
-
TOTAL VENEZUELA (TOGV), Rucio Viejo (Venezuela On-Shore)
- Production Supervisor
2004 - 2004
In charge of production activity.
Supervise partial Shutdown (internal vessel clean-up).
Commissioning and start up of new gas injection well.
-
TOTAL VENEZUELA
- PRODUCTION SUPERVISOR
COURBEVOIE
2004 - 2004
PRODUCTION SUPERVISOR
* In charge of production activity. ;
* Supervise partial Shutdown (internal vessel clean-up). ;
* Commissioning and start up of new gas injection well. ;
-
SINCOR
- START-UP ADVISER
2001 - 2003
SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore)
plant description on here above experience.
* Optimize process operations. ;
* Supervise particular jobs as units' start-up, Plant shutdown.
* Elaborate operations procedures (Spanish) and operating guides. (Operguid)
* Training and assessment of national personal. (Opercap Follow-Up)
* Prepare and coordinate external audit - (Opersafe Follow-Up)
* ISRS Implementation (International Safety Rating System - DNV).
* Acting as Production Superintendent during his vacations.
-
SINCOR (Synthetic Oil of the Orinoco), (Venezuela On-Shore)
- START UP Adviser
2001 - 2003
Optimize process operations.
Supervise particular jobs as units’ start-up, Plant shutdown. Elaborate operations procedures (Spanish) and operating guides. (Operguid)
Training and assessment of national personal. (Opercap Follow-Up)
Prepare and coordinate external audit – (Opersafe Follow-Up)
ISRS Implementation (International Safety Rating System - DNV).
Acting as Production Superintendent during his vacations.
-
TOTAL VENEZUELA (TOGV)
- PRODUCTION SUPERVISOR ASSISTANT
1998 - 2001
PRODUCTION SUPERVISOR ASSISTANT
* Optimize plant and field operations. ;
* Supervise particular jobs (Plant shutdown, wells commissioning, injection start up)
* Elaborate and translate (Eng. / Spa.) operations procedures (Operguid).
* Training and assessment of national personal. (Opercap follow-up)
* Chief Operator and Panel Operator replacement. ;
-
SHELL VENEZUELA
- Panel operator & chief operator
1995 - 1997
SHELL VENEZUELA (SVSA), Maracaïbo (Venezuela Off-Shore).
* Gas / Oil separation platform with desulphurization unit (Amine / Clauss unit).
* 50.000 bbl/d and 800 kg of sulfur per day (pills fabrication).
* Steam Generation
* Vapor Recovery Unit. ;
* Gas reciprocating compressors (Ariel) for 3 Solar Turbines of 12 Mw each.
* Heavy oil production with Light Oil lifts (HP oil pumping plant).
PRE-COM / COM and START-UP
* Construction Follow up on yard to Plant Start-up ;
* Panel operator
* Outside chief operator. ;
* Training and assessment of national personal.
-
GEOSERVICES COMPANY
- Mud logger
1990 - 1995
* Technical support in base (Logging Unit preparation. Training of personal). ;
* Acting Base manager.
* Well Testing / Wire-Line Approach.