Lionnel PERRIN

Dagneux

En résumé

Commissioning and start up Engineer - Chemical Industry
Ingénieur Génie des Procédés - Production - Fabrication en Industrie

Age 37 ans, marié, 2 enfants
Mobilité internationnale,

Centre d'Interêt:
Sports
Amateur de ski et randonnée
Passe temps favoris, la pêche à la truite (Toc, mouche,...)

Mes compétences :
Industrie
Gestion de projet
Pêche
Chimie
Communication
Production
Management
Extrusion
Polymères
Optimisation des process
commissioning and start up of plant
Project Engineer
Process Engineer
DCS Engineer
Chemical Industry
Microsoft Windows

Entreprises

  • Hexcel Composites Limited - Project Processs Engineer

    Dagneux 2015 - maintenant New plant project: 300 M EUR project / HEXCEL / Roussillon Plant, France
    Construction of entire 300 M EUR new plant from scratch, based on existing American processes
    Main Missions: Participate to the different phases of the project with the Chemical process expertise (Basic Studies, details phases, but also construction, commissioning and start up)
    Lead the operator training in France and in the existing plants in USA
    commission, start-up, ramp up and qualify this new line
  • Arkema - Pilot & Industrialization Engineer

    Colombes 2013 - 2015 HPE project: 8 M EUR project / ARKEMA / Pierre-Bénite Plant, Pilot, Industrialization and Production Engineer of the HPE unit during the pilot phase
    HPE plant consisted on a new technology extruder for the PVDF plant.
    Main Missions: Optimize the process parameters and machines to get the best product
    Lead the sampling phases and follow the customers approval steps
  • Arkema - Responsable projet site -Commissioning start up Engineer

    Colombes 2013 - maintenant Responsable d'un nouveau projet pour le compte du site de production.
    Projet consistant a la conception, construction et démarrage d'une station de traitement des effluents pour le site.
    Projet de plusieurs millions d'Euros.

    Être l'interlocuteur Site des différents interlocuteurs et intervenants du projet.
    En charge des phases de détail au niveau du site puis responsable des phases d'acceptante mécanique, commissioning et démarrage.
  • ARKEMA - Plant Project Manager

    Colombes 2013 - 2014 Plant Project Manager / Commissioning and Start up Engineer
    Station project: 7 M EUR project / ARKEMA / Pierre-Bénite Plant,
    Project: consist to install a waste water treatment for our chemical plant.
    Main Missions: Be the plant manager of this project for the engineering
    Then be the commissioning and start up engineer of the project
    Start up of the plant in August 2014
  • ARKEMA FRANCE - Plant Project Manager

    2011 - maintenant Plant Project Manager for a 8 M€ project 02/11 to Present
    ARKEMA Pierre-Bénite plant, FRANCE
    Promoted to provide project management, technical direction and design and build leadership on a 8 M€ project new technology extruder for a PVDF pant. Heavily involve and lead all phases of the project from the pilot trials to the start up.
    Plan, organize and implement all aspects of facility project.
    Selected contributions
    • Followed the trials at the supplier plant in the US, improve the technologies used.
    • Defined the process during the studies phases of the project.
    • Provide leadership through Commissioning, Start up, stabilization of the assets, and transition of the sustaining operations organization.
    • Organize, train the Operators before commissioning.
    • Accountable for the Commissioning and Start up execution planning.
    • Define the Pre-Commissioning, Commissioning and start up Schedule aligned with construction.
    • Lead the sustaining operating organization after feed into ramp up and establish steady operation.
  • Arkema - Plant Project Manager

    Colombes 2011 - 2013 Plant Project Manager / Commissioning and Start up Engineer
    project: 8 M EUR project / ARKEMA / Pierre-Bénite Plant,
    HPE Project consisted to install a new technology extruder for the PVDF process.
    Main Missions: Be the plant manager of this project for the engineering
    Then be the commissioning and start up engineer of the project
    Start up of the plant in March 2013
  • ARKEMA CHINA - Commissioning Engineer

    2010 - 2011 Commissioning Engineer PVDF plants 11/10 to 02/2011
    ARKEMA in China, Changshu plant
    Total CAPEX of the Project 100 M$
    Responsible for verifying the control system, checking for validation of PID’s and mechanical acceptance. Handle the tasks of reviewing the control system documentation for completeness and accuracy. Assigned responsibilities of drafting maintenance procedures as well as perform tracking and operating test equipment. Responsible for verifying that the control system work station and remote monitoring capabilities meets the standards and contract documents.
    Perform the commissioning, project start-up, and other field work by leading a 20 person Chinese team. Assigned responsibilities of identifying commissioning, start up issues and develop solutions for the same.
    Selected contributions
    • Perform Mechanical Acceptance, Functional tests, Commissioning, Start up, Ramp up and Test run of the plants
    • Project Start up done on time
  • ARKEMA - Commissioning and Start up Engineer

    Colombes 2010 - 2011 Commissioning and Start up Tiger project: 100 M$ project / ARKEMA /
    Tiger project consist on a new Monomer and a new Polymer PVDF plants
    Main Missions: Mechanical Acceptance, Commissioning; Start up of the plants
  • ARKEMA - Development & Process Engineer

    Colombes 2006 - 2010 Development & Process Engineer, on Plant production of PVDF resin,
    / Pierre-Bénite Plant, Main Missions: Process engineer referent (new project & development (technology & recipe))
    Assist and develop the HPE new technology process
    Productions follow up (yield, asset, quality, safety studies, improvements)
    Process works in general
  • ARKEMA FRANCE - Development & Process Engineer

    2006 - 2010 Development & Process Engineer on Plastic PVDF plant - Kynar 12/06 to 02/2011
    ARKEMA, Pierre-Bénite Plant, FRANCE
    Challenged with increasing product quality, improving process flow, and reducing costs while maintaining or improving safety of the plastic plants. Develop, evaluate, document and advance manufacturing methods and processes.
    Analyse and reengineer production layouts, designing and implementing efficiency and quality improvements projects across production lines. Collaborate with different department teams to establish viable projects. Provide ongoing production support and troubleshooting.
    Selected contributions
    • Be the Process engineer referent for new project and new development (technology and recipe) in France
    • Created and implemented efficiency enhancements to generate more than 10% improvement through associated cost reductions.
    • Start up of the waste water station of the plant, and leader of the waste recycling project.
  • ARKEMA USA - Process Engineering Internship

    2005 - 2006 Process Engineering Internship on Plastic PVDF – Kynar 02/05 to 12/2006
    ARKEMA Calvert-City, Kentucky, USA
    Integrated quickly into American production team tasked with investigating, learning and implementing american processes to the French processes in manufacture PVDF plants.
    Provide American operation expertise to the French plants to increase the capacity and yield of the French plants.
    Selected contributions
    • Identified and proposed American optimization to the French plants.
    • Energy Balances of the plants
  • Arkema - Process Engineer

    Colombes 2005 - 2006 Process Engineering Internship (18 months VIE internship)
    PVDF plants / ARKEMA / Calvert-City plant, Kentucky, USA
    Main Missions: Productions follow up
    Process works in general
    Assistance process Engineer for the french plants
  • ARKEMA FRANCE - Process Internship

    2003 - 2005 Process Engineering Internship 01/03 to 08/2004
    ATOFINA Pierre-Bénite, FRANCE
    • Yield improvement on a water treatment product by optimisation of material quantities.
    • Test-Run (Validation of the performance of an industrial unit) on a refrigerant product.
    • Identifications of the mains bottlenecks of the refrigerant plant.
    • Listing and examining waste from the plant.
  • Arkema - Process Engineer

    Colombes 2003 - 2004 Process Engineering Internship (13 months internship)
    Main Missions: Mass Balance and Yield improvement on a water treatment product unit
    Test-Run and process optimization of a refrigerant product unit
    Process works in general