Menu

Maxime COLIN

Vaulx-en-Velin

En résumé

I start within TECHNIP as structural Engineer on AGBAMI Project (Subsea Project) on 2006. After 4 years, and according my aspiration, I left the structure team as lead to move to Project position on 2010 still on subsea Project as Flexible Package Manager on Montanazo & Lubina Project (Spain) with REPSOL as client.

In 2011, I join the supply team on which I was acting as deputy project manager on several small & average projects. I was the single point of contact of the client as SAIPEM / TOTAL/PANAFRICAN and managing the project with the support of the Supply team project manager.

In 2013, I join the TEN project (Ghana) team as Package Manager on stalk package. I was mainly responsible to deliver all equipment, complete qualifications program and fabrication scope at Evanton spool base.

Mes compétences :
Responsable
Gestion
Offshore
Flexible
Production
Management
Design

Entreprises

  • TechnipFMC - Package Manager

    Vaulx-en-Velin 2016 - maintenant In charge of the Installation aids scope for several vessels on KAOMBO Project
  • Technip - Package Manager

    Paris 2013 - 2016 Responsable package flowline rigid sur le projet TEN
  • Technip - Package Manager

    Paris 2005 - 2013 Depuis Janvier 2013 - Package Manager sur projets Supply - LIANZI (SS7)

    Depuis Janvier 2011 - Project Engineer sur differents projet supply - KIZOMBA (SAIPEM) / RS12 (NPCC) / PAZFLOR 2" (TOTAL)
    Responsable du suivi et du management au jour le jour des projets en charge sous les ordres du Project Manager. Point de contact du client


    Juin 2010 / Decembre 2010 - Package Manager sur Montanazo & Lubina (repsol)

    Responsable de la coordination et le suivi de fabrication de flexible et des equipments associés en accord avec les exigences techniques, planning et QHSE du projet

    April 2009 / Juin 2010 - Lead Structure sur ASENG (Noble Energy) et Montanazo & Lubina (Repsol)(10 personnes)

    Avril 2008 / April 2009 - Lead Structure sur projet OYO (ENI) (4 personnes)

    Octobre 2007 / Avril 2008 - Lead Structure sur project AGBAMI (Chevron)

    Gestion et management de l'equipe structure (11 personnes)

    Janvier à Septembre 2007 - Deputy lead structure project AGBAMI (Nigeria)

    Fonction de Management et de gestion du suivi de conception et du design de differents equipments générés par l'equipe structure du projet.

    Setpembre 2005 à fin 2006 - Ingenieur Structure sur project sur AGBAMI (Nigeria)

    Conception d’équipements permanents et temporaires (End fitting, hang off, vertebre, dummy, pulling head, Bend stiffners fixation...), a l’aide de divers logiciels (ABAQUS 6.5, softwares internes)et suivi de leurs fabrication
  • SNCF Direction de l’Ingénierie 75018 – 18 mois - Ingénieur Calcul & Conception

    2002 - 2004 - Etude du pont levant de la Bordigue à Sète, avec l’aide du logiciel de calcul à éléments finis ANSYS. Calculs statiques, dynamiques pour vérification de la structure du pont en vue d’une augmentation de la vitesse du passage ferroviaire.
    - Conception et dimensionnement d’un pont translateur à structure métallique, pour l’Arsenal de Brest, desservant trois voies. Projet intervenant dans le cadre de transport de missiles de l’Arsenal aux Sous-marins
  • Ecole des mines de Paris à Sofia Antipolis (04 - Projeteur

    2001 - maintenant Préconception d’une machine d’essais mécaniques d’éprouvettes dans diverses conditions. Machine déformant les éprouvettes sans phases transitoires en compression et torsion.

Formations

Réseau

Annuaire des membres :