-
TECHNIP Milton Keynes
- Lead rotating equipment engineer
2012 - maintenant
: Lead rotating equipments engineer at TECHNIP IBERIA -Barcelona -Spain in : Survey rehabilitation project of oil & gas refineries of Port Harcourt & Warry in Nigeria ,to restore their production capacities to their name plate values and also debottleneck the refineries to achieve higher production capacities.
The project concerns more than 2.000 rotating equipments of the refineries units ( process - power stations - petrochemical -utilities...)
-
Technip
- Engineer
Paris
2012 - maintenant
Lead rotating equipments engineer in : Survey rehabilitation project of oil & gas refineries of Port Harcourt & Warry in Nigeria ,to restore their production capacities to their name plate values and also debottleneck the refineries to achieve higher production capacities.
The project concerns more than 2.000 rotating equipments of the refineries units ( process - power stations - petrochemical -utilities...)
-
COMSPAIN XXI Company
- Rotating Equipment Project Manager
2010 - 2012
COMSPAIN XXI Company -Madrid -Spain in several projects of fertilizers in : Morroco - Egypt - Algeria - Arabia Saudi - Uzbikistan...
Management of projects in phases: equipment's reception; onsite fabrication & erection; technical assistance to assemblies; alignments; adjustments and testing of rotating machinery: driers; drums; granulators; coater drums; reducers and ventilators. Static equipment: fluid bed coolers & cyclones... pre-commissioning; commissioning and start-up (total workers: 100)
-
COMSPAIN XXI-Madrid
- Rotating Equipment Project responsible
2010 - 2012
Rotating Equipment Project responsible in several projects of fertilizers plants in : Morroco - Egypt - Algeria - Arabia Saudi - Uzbikistan...
Management of projects in phases: equipment's reception; onsite fabrication & erection; technical assistance to assemblies; alignments; adjustments and testing of rotating machinery: driers; drums; granulators; coater drums; reducers and ventilators. Static equipment: fluid bed coolers & cyclones... pre-commissioning; commissioning and start-up .
-
Dragados Gulf-Intecsa Ingeniería Industrial
- Construction manager
2009 - 2010
Construction & Pre-commissioning Manager of a fertilizers complex(DAP/MAP) project; customer: MA'ADEN in Saudi Arabia. Duties: *managing & following-up mechanical erections; *supervising fabrication of machinery; pre-commissioning; commissioning & start-up plans. Training of customer's staff .
-
Construction & Pre-commissioning
- Manager of a fertilizers
2009 - 2009
: Construction & Pre-commissioning Manager of a fertilizers complex(DAP/MAP) project; DRAGADOS GULF / INTECSA Company; customer: MA'ADEN in Saudi Arabia. Duties: *managing & following-up mechanical erections; *supervising fabrication of machinery; pre-commissioning; commissioning & start-up plans. (Project budget: $500 millions) for training of customer's personnel (total number of workers: 700).
-
TECNICAS REUNIDAS
- Mechanical Engineer
Madrid
2008 - 2009
: TECNICAS REUNIDAS -INITEC plantas industriales
boosting gas stations' project in: tin foue tabenkourt , (Sahara of ALGERIA), customer: the consortium SONATRACH + TOTAL + REPSOLY PF: duties: mechanical works scheduling & supervising; *technical assistance to an assembly; alignment; adjustments; testing of gas turbines & gas compressors; pre-commissioning; commissioning and start-up of stations; training of customer's staff.
-
TECNICAS REUNIDAS Company
- Mechanical Engineer
2008 - 2008
boosting gas stations' project in: tin foue tabenkourt and raour khrouf, (Sahara of ALGERIA). TECNICAS REUNIDAS Company, customer: the consortium SONATRACH + TOTAL + REPSOLY PF: duties: mechanical works scheduling & supervising; *technical assistance to an assembly; alignment; adjustments; testing of gas turbines & gas compressors; pre-commissioning; commissioning and start-up of stations; training of customer's personnel (Project budget: $375 millions) total number of workers: 500. ;
-
MANTECNOS Company
- Mechanical Site Manager
2003 - 2007
MANTECNOS Company, Barcelona. Subcontractor of plant's projects of: oil & gas; petrochemicals; chemicals; power stations and cement... Duties: technical & economic studies of projects - preparing staff, tools & materials; commercial relations with customers; (total number of workers: 250).
-
KAWASAKI HEAVY INDUSTRIES ltd
- Mechanical Engineer
2003 - 2007
Mechanical Engineer of a cement plant projec s;. Customer: LAFARGE- ASMAR -CIMAR ; duties: mechanical works scheduling; *coordination between subcontractors; punch lists & non conformity management; *pre-commissioning; commissioning & start-up of plant; training of customer's staff
-
KAWASAKI HEAVY INDUSTRIES
- Senior Mechanical Engineer
2001 - 2003
a cement plant project; company: KAWASAKI HEAVY INDUSTRIES. Customer: LAFARGE-ASLAND; duties: mechanical works scheduling; *coordination between subcontractors; punch lists & non conformity management; *pre-commissioning; commissioning & start-up of plant; training of customer's personnel (Project budget: $180 millions) total number of workers: 460.
-
SERTEP Company
- Projects Manager
1998 - 2001
Subcontractor of plants projects of: OIL & GAS; petrochemical; chemical; power stations & cement... Duties: management of projects in all phases of EPC; *technical & economic studies; *commercial relations' with customers; (total number of workers: 200).
-
SERTEP
- Projects Manager
1998 - 2003
plants projects : OIL & GAS; petrochemical; chemical; power stations (combined cicle & others) & cement ... Duties: management of projects in all phases of EPC; *technical & economic studies; *commercial relations' with customers.
-
Group OCP
- Mechanical Maintenance Manager
1989 - 1998
: of phosphoric acid; sulfuric acid & fertilizers production units in a chemical complex: JORF LASFAR -Morocco -( world leader); duties: develop and maintain maintenance strategies; *managing mechanical staff (160 persons); economic & technical projects' studies for revamping or restoring of units production; *develop and implement procedures to monitor equipment's availability and reliability; *purchase parts and materials; *maintenance preventive & curative scheduling; *H.S.E. managing; Total Productive Maintenance (T.P.M.) & quality circle advisers.
-
Group office cherifien de phosphate
- Mechanical maintenance manager
1989 - 1998
Jorf Lasfar chemical complex of the O.C.P group -
World leader of phosphoric acid, sulphuric acid & fertilizers production
Mechanical maintenace manager
. Economical & technical project's studies for rovamping & restoring of Units production-
- Maintenance preventive & curative scheduling;
- Total Productive Maintenance (T.P.M.) & quality circle adviser. ;
- Spart parts purchase.
-
O.C.P
- Mechanical Project Engineer
1987 - 1989
World leader of phosphoric acid, sulphuric acid & fertilizers production
Mechanical Project Engineer
* Prepare technical documentation for mechanical equipments purchase. ;
* Mechanical works scheduling & supervising ;
* Pre-comissioning /commissioning /start-up ;
* The project budget: (1 billion $) was realized in 3 phases as follow :
04 fertilizers units (DAP-TSP-MAP-NPK) realized by
LANGUAGES :
French: (fluently); English: (high level); Spanish: (fluently) & Arab: (fluently)
-
JORF LASFAR
- Project Mechanical Engineer
1987 - 1989
JORF LASFAR chemical complex of the O.C.P group in Morocco (world leader of phosphoric acid,sulphuric acid & fertilizers production). (Project budget: 1 billion $ ) total workers: 800. Main duties : *mechanical works scheduling & supervising *coordination between subcontractors; pre-commissioning; commissioning & station start-up.
The project was realized in 3 phases as follow :
Realization of 04 fertilizers production units (DAP-TSP-MAP-NPK); realized by
SPOKEN AND WRITTEN LANGUAGES :
French: (fluently); English: (high level); Spanish: (fluently) & Arab: (fluently)
-
O.C.P
- Mechanical Project Engineer
1985 - 1987
World leader of phosphoric acid, sulphuric acid & fertilizers production
Mechanical Project Engineer
* Prepare technical documentation for mechanical equipments purchase. ;
* Mechanical works scheduling & supervising ;
* Pre-comissioning /commissioning /start-up ;
* The project budget: (1 billion $) was realized in 3 phases as follow :
Cicle combined Power station project -220mw - 03 turbo-generators; realized by GEC-ALSTOM
-
JORF LASFAR
- Project Mechanical Engineer
1985 - 1987
JORF LASFAR chemical complex of the O.C.P group in Morocco (world leader of phosphoric acid,sulphuric acid & fertilizers production). (Project budget: 1 billion $ ) total workers: 800. Main duties : *mechanical works scheduling & supervising *coordination between subcontractors; pre-commissioning; commissioning & station start-up.
The project was realized in 3 phases as follow :
; FIVE CAIL BABCOCK; SADESPA...
Realization of power station project of 03 turbo-generators; realized by GEC
-
O.C.P
- Mechanical Project Engineer
1983 - 1985
World leader of phosphoric acid, sulphuric acid & fertilizers production
Mechanical Project Engineer
* Prepare technical documentation for mechanical equipments purchase. ;
* Mechanical works scheduling & supervising ;
* Pre-comissioning /commissioning /start-up ;
* The project budget: (1 billion $) was realized in 3 phases as follow :
08 phosphate grinding units - 08 sulphur melting units - 06 sulphuric acid units; 08 phosphoric acid units. Realized by: MITSUI ; SPIE - BATIGNOLLE; STEIN INDUSTRY; F.C.B; SADESPA...
-
JORF LASFAR
- Project Mechanical Engineer
1983 - 1985
JORF LASFAR chemical complex of the O.C.P group in Morocco (world leader of phosphoric acid,sulphuric acid & fertilizers production). (Project budget: 1 billion $ ) total workers: 800. Main duties : *mechanical works scheduling & supervising *coordination between subcontractors; pre-commissioning; commissioning & station start-up.
The project was realized in 3 phases as follow :
Realization of productions units of: - 08 phosphate grinding units - 08 sulfur melting units -
06 sulfuric acid units; 08 phosphoric acid units. realized by: MITSUI ENGINEERING; SPIE