Menu

Natacha BARBIER

SURESNES

En résumé

After 7 years working as a Hydrographic Surveyor and Geomatic Engineer in the Oil & Gas Industry, I am now looking forward to start a job with new challenges.

I was involved in the preparation, operations and reporting of all survey phases with:
- In-depth knowledge of proceedings of a project under client expectations
- Expertise in data management, especially in Cartography - GIS
- Management of personnel including training young engineers
- Achievement of objectives by managing priorities
- Excellent interpersonal skills to quickly adapt to very diverse domains

Entreprises

  • Subsea 7 - Project Surveyor

    SURESNES 2011 - 2015 Responsible of the Cartographic study (Field Layout) for installation of 21 pipelines, 15 umbilicals, 2 HRTs, 1 SHR, 52 Spools with focus on:
    - Technical constraints from all disciplines involved (design & installation)
    - Environmental and geophysical conditions
    - Third parties constraints
    - Any request from project & client in accordance with specifications

    Preparing and following operations from pre-study to as-built installation: writing procedures, managing and/or assisting involved personnel offshore from office or on site on demand.
    Managing all Data Processing (hydrographic & geomatic) with expert knowledge of specific softwares/tools

    Geomatic expert:
    - Managing Charting: alignment sheets, PreLay Survey Charts, As-Built Survey Charts
    - Managing GIS: GIS Design database issued regularly during design phase, GIS As-Installed database issued on a weekly basis during operations (including all installation data), GIS As-Built database after completion of as-built survey
  • Subsea 7 - Junior Surveyor, Data Processor

    SURESNES 2008 - 2011 Use and interpretation of RTK station, GPS/DGPS, USBL, LBL, Echosounder, Cross-Profiler, Side Scan Sonar, Magnetometer, Sub-Bottom Profiler, during offshore missions in Angola on both Deep and Shallow Water Projects:

    • Pre-Lay Survey on Block 15 (December 2008)

    • Inshore Channels Survey in Soyo on ALNG (May 2009)

    • Pre-Lay / As-Laid / Post-Trench Survey on ALNG (February / April / July 2010)

    • Pre-Lay / AsLaid Survey on Block 17 (April / July 2010)

    • As-Built Survey on Block 17 (February 2011)

Formations

Pas de formation renseignée

Réseau

Annuaire des membres :