Menu

Nicola GAMBATO

MILAN

En résumé

14 years experience as Project Planner in Oil & Gas on/off-shore projects, Energy Power plants, Chemical Complex plants, FLNG units, Productions plans, 8 years experience in Mechanical Design.
Contact: nicolagambato@yahoo.it

Technical skills:
-Establish and follow up detailed Schedule, Progress measurement, resources analysis, cost control and related Reports and Procedures
-Data manipulation, numeric and analytical skills particularly within MS Excel and MS-office Package
-Liaise with other disciplines, good working relationships with stakeholders at all levels to build consensus
-Ability to build effective interpersonal relationships and able to foster and contribute to a positive and productive team environment.
-Good spoken and written English and French, Italian native language

Mes compétences :
Mechanical Designer
Project Control
Project Planner
Cost Control

Entreprises

  • EniProgetti, San donato Milanese, Milan ITA – AKKA Energy - Project Planner / Cost Controller (Offshore Oil&Gas Multiplatform Project)

    2016 - maintenant Employed in Marine XII Nenè Field development project.
    Based in Congo the project include a new process platform, a new drilling platform connected to the PP by means a bridge and further three (3) new drilling platforms, a new early production offshore pipeline, a new intra-field offshore pipeline, a new gas export offshore pipeline, a new oil export offshore pipeline, new onshore facilities (pig trap station), new oil export and gas export onshore pipelines up to the delivery points.
    My duties involved:
    -Develop the Baseline Schedule and set up the WBS at detailed level 3 using MS-Project.
    -Monitored and maintained the project schedule updates, critically monitor execution and to suggest appropriate and timely corrective action for achieving of project objectives and targets
    -Prepare cost control regime for execution in line with project over all schedules, cost and revenue reports histogram per Package and submitted production budget estimates
    -keeping a close watch on man-hours booking to appropriate cost centers.
    -Analyze overall discipline wise progress and efficiency reports, compare with the targets, and indicate areas where improvements are required
    -Supported PM on maintaining project management documentation and participated in project change management processes.
  • Desmet Ballestra, Milan ITA – Epsco - Project Planner / Cost Controller (Offshore Oil&Gas Project)

    2016 - 2016 Zubair project include the Revamping of existing Facilities, 5 new DGS, new Power Generation plant, New flowline and trunklines and the Re-Development phase with new gas treatment plant, new oil tank farm and transfer pipeline.
    My duties involved:
    • Update the schedule, in Primavera P6, and produce the Progress reporting, on a weekly basis, collect and integrate the data from all Discipline leaders, provide them support in order to uniformize methods and tools to the Company’s standards.
    • Ensure that Project costs and forecasts are accurate and up to date by coordinating regularly with various contractors.
    • Conduct critical analysis of project costs and budget and provide corrective actions.
    • Co-responsible for cost analysis, development and presentation of cost impact integration measures to the project management.
    • Develop and update Project Estimates.
    • Maintain accurate records of actual costs and commitments incurred on the project.
    • Constant monitoring and updating of the manhours workloads, reporting directly to the Project Director.
  • Tecnomare (ENI Group), San donato Milanese, Milan ITA – Epsco - Project Planner

    2012 - 2016 2011 Saipem SA – Inatis Paris, FR

    Planning Manager

    Responsible for the documents progress during the PRE-EPC phase for a FLNG project ( Floating Liquefaction of Natural Gas Unit)
    My duties involved:
    • Pursue, monitor and record progress for engineering drawings in each area of project activity.
    • Supervise Document Control for maintaining the Overall Master Document list on track with client's guidelines.
    • Analysing all deviations form the approved plans and identify potential problems.
    • Assist the Project Manager in maintaining the project schedule.
    • Produce regular reports on Weekly and Monthly basis such as weekly progress, cumulative progress, progress figures, S-curves, activities performed up to current week/monthly, activities forecast 2 weeks look ahead, Corrective Plan - differences between activities foreseen and activities performed, Corrective plan - for activities planned but not performed, to permit the project to be well managed and which highlight areas of concern so as to enable the Project Manager to take timely action.
    • Cooperations with : PETROBRAS
  • Saipem SA, Paris, FR - Inatis - Project Planner

    2011 - 2011 2008 – 2011 General Electric - Wide Control Belfort, FR

    Project Planner

    Responsible for 16 EPC Energy Power Plants projects, planning and scheduling activities in compliance with Company rules/procedures and client's guidelines.
    My duties involved:
     Develop the Master Schedule at detailed level, equipments planning based on engineering / sourcing / procurement / transport / delivery using ARTEMIS 2008.
     Develop the Master Schedule for the sites using Primavera 6.1 .
     I liaised daily with Project Manager and prepared a monthly project report, handled the presentation to the monthly operational meeting and reported to the site manager.
     Regular monitoring, development, updating and re-baselining of programmes and progress control to reflect project status and any agreed changes.
     Prepare analysis and reports on a monthly basis.
     Identify and anticipate major changes and immediately propose corrective actions.
     Attend meetings with Customer related to scheduling issues.
     Cooperations with :
    EDF ENERGY,
    EXXON/MOBIL, SEPCO Electric Power Construction Corp
    Origin Energy Electricity Ltd,
    AGIP KCO, Ingenieria Ronza S.A. -
    Fainser S.A. Union Transitoria de Empresas
    Office National de l Electricité –ONE
    NUOVO PIGNONE SPA
  • General Electric, Belfort, FR - Wide Control - Process Planning

    2008 - 2010 2006 – 2008 Costampress srl Gardigiano di Scorzè, IT

    Process Planning

    Responsible for preparation of planning methodology and the construction procedures.
    My duties involved:
     Responsiblity for all planning and scheduling activities .
     Elaborating, updating and revising all scheduling and planning procedures and ancillary documents.
     Developing scheduling methodology and analysis on Department’s progress measurement.
     Maintaining and operateing a computerized planning, monitoring & controlling system using MS project.
     Updating the current schedule.
     Monitoring weekly delayed activities
     Weekly photographic report.
     Weekly discipline progress reports.
     Continuous control and diffusion of information related to the activities on critical path.
  • Costampress srl Gardigiano di Scorzè, ITA - Project Planner

    2003 - 2008 2001-2006 Mantovani s.p.a. Padova, IT

    Project Planner

    Responsible for major projects planning and scheduling activities in compliance with Company and project rules/procedures

    i.e. MOSE hydraulic structure for tide regulation
    and Adriatic LNG pipeline for SNAMPROGETTI and EXXON MOBIL

     Develop the Master Schedule at level 3.
     Gathering the progress data from members of the site construction team as necessary to maintain the construction programme and report progress.
     Updating, on weekly basis, the detailed schedule level 3 for department/areas using Primavera 3.1.
     Maintain progress data on live programs and prepare analysis and reports on a monthly basis.
     Prepare and present detailed planning information (Gantt charts, histograms, PERT charts, Baselines Schedules, S Curves & Progress reports).
     Developing, maintaining, and analysing critical path plans and related schedules.
     Create work breakdown structures suitable to the programme of work.
     Analyse planning data and modifications as required to achieve imposed targets through time based analysis and/or resource limited based scheduling.
     Identify and anticipate major changes and immediately propose corrective actions.
  • Mazzari srl Padova ITA - Senior Engineering Designer

    1998 - 2003 1997-2001 Mazzari srl Padova IT

    Senior Engineering Designer

    Responsabile for 3D modeling creation in automotive industry.
    My duties involved:
     Review of customer enquires
     Ability to provide technical solutions to problems identified
     Create design layout/assembly drgs on CAD +CAD CAM Software
     Get involved with development of new designes
     Ability to lead and actively take part in design reviews and other technical meetings

    Skills/Knowledge:
    Extensive knowledge of metallic and elastomer materials technology
    Extensive knowledge of downhole tool design
    Advanced level skill in the use of 3D and 2D of Cimatron Unigraphics NX3:
    software for modelling solid/parametric and hybride/surfaces.

Formations

Pas de formation renseignée

Réseau

Annuaire des membres :