After a couple of years working in Electrical or intrumentation applications, I add the opportunity to devleopp skills in engineering activities and contractor’s follow up management.

I have been involved in detailed studies and project coordination for new or extension of production unit capacities, in the filed of pharmaceutical, chemical or energy. A part of the job in to work as spatial coordinator in worksharing with other offices.

My willing would be get the opportunity to work as engineering manager, and project activities.

Entreprises

  • JACOBS France - Lead piping/ installation

    Pasadena maintenant Piping Lead Engineer in Gas or pharmaceutical application

    - Responsible of all the piping activities (detailed design) for the renovation and extension of storage capacities
    - Responsible of the piping studies: spatial coordinator of the design team (3D model in PDS), stress analysis and material management, preparation of the technical proposal , piping work description for the piping contractor
    - Coordination of the interface with the other disciplines (civil, structure, Instrumentation, electrical, equipment)
    - Workshare with Indian Jacobs office
    - Piping and insulation project contracts: technical specifications, technical selection and follow up
    - Field engineering: technical solutions to construction problems
    - Preparing the PED (European Pressure Equipment Directive) files
    - Interface with the Piping Contractor, Technical solutions to construction problems

    Detailed design (gas application)
    o Responsibility of studies up to 90%
    o Extraction of all deliverables « Issue for construction » to Contractor
    o Follow up of contractor for small bore lines.
    o Validation activities
    o Field engineering: technical solutions to construction problems

    Conceptual design (pharmaceutical application)
    o responsibility of studies up to 30%
    o Contractor’s follow up to “Issue For construction”
    o Validation activities
    o Field engineering: technical solutions to construction problems
  • EURODIA Industries - Project engineer

    2003 - 2006 Member in a project team, projects management in products treatment (chromatography, electro dialysis, filtering systems), for food, pharmaceutical, chemical applications, in an international context:
    • Plants dimensioning and drafting of equipments specification datasheet for suppliers quotations (instrumentation, hollow-ware manufacture, piping, heat exchangers, automatism).
    • Bids’ invitations, negotiating of purchases’ conditions, suppliers’ follow up.
    • detailed studies follow up (piping, layouts, civil guide and process equipments…)
    • Electrical & process studies follow up (PFD & PID drawings, power installed….)
    • Budget follow up, Delivery and realisation time follow up (planning & team coordination).
    • Work in partnership with the customer to validate equipments and negotiate contract amendments, delivery times and availability of utilities for commissioning..
    • Onsite works follow-up and teams management (piping & electrical subcontractors) for skids erection.
    • Commissioning and start up of the different units on site.
    • Draft of reassembly, operating, maintenance manuals.
    • Training period of operators on site.

    Travelling for professional reasons during onsite erection’s follow-up or commissioning period:
    • Start up of a chromatography unit (Italy).
    • Start up a demineralization unit line (Finland).
    • Start up of a low conductivity demineralization pilot for sugar application (Hungary)
  • ALTRAN TECHNOLOGIES - Engineer

    Vélizy-Villacoublay 2000 - 2003 2002- 2003 MANUFACTURING COMPONENT LEADER, Department Manufacturing, GE Medical

    Member of a project team of 15 people, introduction of a new vascular product in the supply chain line and follow-up of the supplier’s production processes.
    • Work on electronic boards, electrical components, mechanical design (power, regulation control).
    • Use of the GE quality processes to qualify the equipment
    • Follow-up of the supplier’s production processes, expected lead time, and modifications notifications.
    • Guarantee of the quality level of the equipment shipped to the customer by upgrading the systems.
    • Liaise with the engineering team to solve technical issues and improve the product’s definition and performances.
    • Suppliers’ quality follow-up (norms, acceptance test reports…)
    • Management of a technician team on the assembly line (assembly specifications, tests of the product, operating & maintenance manuals…)


    2000- 2002 TESTS ENGINEER, Department X-Ray/ Generators, GE Medical Systems

    Member of a project team of 10 persons, development of a new X-ray generator capable to provide a peak power of 40kW or 80kW, for radiology applications:
    • Drafting and validation of the integration tests and checklists to check the critical parameters of the prototypes.
    • Investigation on the EMC normative tests to satisfy the EMC requirements.
    • Work in an international context: partnership with an American and an Indian team (manufacturing)
    • Follow-up of the pre-series generators and clinical tests of the generator & suppliers’ processes.