  • Ponticelli Frères - Field Engineer

    Émerainville 2005 - maintenant Since Nov 2009 : Technical Manager in the Joint Venture FIP (Fabricom, Irem Ponticelli) for NUON MAGNUM Project (Eemshaven, Netherlands). 1200MW Combine Cycle Power Plant, customer Mitsubishi, 292M€, 2.5M h.
    Member of the JV Executive Comitee.

    Nov 2008 – Nov 2009 : Project Manager. ALSTOM Combigolfe. Combine Cycle Power Plant 440MW. 80.000h, 8M€.Centerline installation and On Base Piping Erection.

    November 2007 - November 2008: Oil Piping Prefabrication Manager in France for Total Petrochemical (75 000wi, Styrene Modernization Project). Multiple sites managment and organisation.

    November 2006 - October 2007: Oil Piping Prefabrication Manager in Poland.
    Projects for Solvay and Exxon : 40 000", SS304L, SS316L, P11, P22, Double Wall Piping.

    2005 - 2006 : Field Engineer on the HP Loop Project at TOTAL La Mède (FRANCE): 1 grass root (250 000h) and 2 revamping (60 000h).
  • Technip - Intern

    Paris 2004 - 2004 Five months internship. Construction for ERAMET of a new plan with a 40kt Press(200 000h).

Formations

  • Santa Clara University (Santa Clara, Ca)

    Santa Clara, Ca 2002 - 2003 Engineering

    Senior Exchange Student
  • Hautes Etudes Industrielles

    Lille 1999 - 2004 Master in Mechanical Engineering

Réseau

Annuaire des membres :