Philippe CALLE

Casablanca

En résumé

Mes compétences :
Master Planning
Studies
Preparation of tender documents
Operations and Maintenance
Quality management
Demand analysis
Responsible for the following aspects
Project Management
Procurement
Geographic Information Systems
Urban development
Management of multidisciplinary teams
Development activity
Telemetry
Technical supervision and assistance
Technical supervision
Design of Sewerage and Water Networks and Treatmen
Coordination of innovation and technology deployme
Business Development
Marketing

Entreprises

  • Cadex - DIrector

    Casablanca 2017 - maintenant Marketing for Companies willing to sell in the Seychelles and the region.
  • Veolia - REGIONAL PROJECT MANAGER

    Paris 2013 - 2017 VEOLIA MIDDLE EAST (Veolia subsidiary in the Gulf Countries)

    * Business Development for the GCC region in relation with medium and large municipal and industrial projects (DBO, BOT, BOO, and O&M)
    * Contract write-up and negotiations ;
    * Technical and contractual studies and assistance to on-going projects (Studies, DBO and O&M) ;
    * Business Plans ;
    * Setup and negotiation of regional procurement framework agreement
    * Development of specific technical projects with some subsidiaries of the group (containerised treatment plants, AMR and smart metering, Concentrated Solar Power systems)
    * Member of the QHSE, procurement and maintenance regional groups ;
  • Veolia - REGIONAL PROJECT MANAGER

    Paris 2013 - maintenant VEOLIA MIDDLE EAST (Veolia subsidiary in the Gulf Countries)

    * Business Development for the GCC region in relation with medium and large municipal and industrial projects (DBO, BOT, BOO, and O&M)
    * Contract write-up and negotiations ;
    * Technical and contractual studies and assistance to on-going projects (Studies, DBO and O&M) ;
    * Business Plans ;
    * Setup and negotiation of regional procurement framework agreement
    * Development of specific technical projects with some subsidiaries of the group (containerised treatment plants, AMR and smart metering, Concentrated Solar Power systems)
    * Member of the QHSE, procurement and maintenance regional groups ;
  • Veolia - REGIONAL PROJECT MANAGER

    Paris 2013 - 2017 VEOLIA MIDDLE EAST (Veolia subsidiary in the Gulf Countries)

    * Business Development for the GCC region in relation with medium and large municipal and industrial projects (DBO, BOT, BOO, and O&M)
    * Contract write-up and negotiations ;
    * Technical and contractual studies and assistance to on-going projects (Studies, DBO and O&M) ;
    * Business Plans ;
    * Setup and negotiation of regional procurement framework agreement
    * Development of specific technical projects with some subsidiaries of the group (containerised treatment plants, AMR and smart metering, Concentrated Solar Power systems)
    * Member of the QHSE, procurement and maintenance regional groups ;
  • VEOLIA - PROJECT DIRECTOR

    2012 - 2013 VEOLIA WATER SAUDI (Veolia Water subsidiary in Saudi Arabia)

    * Technical supervision and assistance to on-going projects (Studies, DBO and O&M)
    * Business Development for the Country for the municipal and industrial clients
    * Contract write-up and negotiations ;
  • VEOLIA - PROJECT DIRECTOR

    2012 - 2013 VEOLIA WATER SAUDI (Veolia Water subsidiary in Saudi Arabia)

    * Technical supervision and assistance to on-going projects (Studies, DBO and O&M)
    * Business Development for the Country for the municipal and industrial clients
    * Contract write-up and negotiations ;
  • VEOLIA - PROJECT DIRECTOR

    2012 - 2013 VEOLIA WATER SAUDI (Veolia Water subsidiary in Saudi Arabia)

    * Technical supervision and assistance to on-going projects (Studies, DBO and O&M)
    * Business Development for the Country for the municipal and industrial clients
    * Contract write-up and negotiations ;
  • VEOLIA WATER - PERFORMANCE DIRECTOR

    Paris 2010 - 2012 VEOLIA WATER SAUDI (Veolia Water subsidiary in Saudi Arabia)

    * Management Contract for the whole city of Riyadh: 5 million inhabitants, 380,000 water connections, 12,000 km of water network, a production of 660 million m3 (half managed by RCBU from deep wells and half from a desalination plant managed by the Saline Water Conversion Corporation (SWCC)), 41% continuity of service, 130,000 waste water connections, 234 million m3 of waste water collected per year, 7,000 km of waste water separate system.
    * Technical Director responsible for performance measurement, quality and health & safety within the Riyadh City Business Unit (RCBU).
    * Establishment of the department, selection of staff and creation of the measurements and reporting,
    * Design and implementation of data capture processes to meet the requirements of the Production of Base Year Data Report (benchmarks for KPIs and performance standards)
    * Responsible for the creation and operation of RCBU's documentation management system
    * Responsible for the review, reorganisation and implementation of RCBU procedures
    * Management of short-term expatriate technical expert input, especially for Health and Safety
    * Establishment and maintenance of relations with the independent auditor and the National Water Company (NWC). ;
  • VEOLIA WATER - PERFORMANCE DIRECTOR

    Paris 2010 - 2012 VEOLIA WATER SAUDI (Veolia Water subsidiary in Saudi Arabia)

    * Management Contract for the whole city of Riyadh: 5 million inhabitants, 380,000 water connections, 12,000 km of water network, a production of 660 million m3 (half managed by RCBU from deep wells and half from a desalination plant managed by the Saline Water Conversion Corporation (SWCC)), 41% continuity of service, 130,000 waste water connections, 234 million m3 of waste water collected per year, 7,000 km of waste water separate system.
    * Technical Director responsible for performance measurement, quality and health & safety within the Riyadh City Business Unit (RCBU).
    * Establishment of the department, selection of staff and creation of the measurements and reporting,
    * Design and implementation of data capture processes to meet the requirements of the Production of Base Year Data Report (benchmarks for KPIs and performance standards)
    * Responsible for the creation and operation of RCBU's documentation management system
    * Responsible for the review, reorganisation and implementation of RCBU procedures
    * Management of short-term expatriate technical expert input, especially for Health and Safety
    * Establishment and maintenance of relations with the independent auditor and the National Water Company (NWC). ;
  • VEOLIA WATER - PERFORMANCE DIRECTOR

    Paris 2010 - 2012 VEOLIA WATER SAUDI (Veolia Water subsidiary in Saudi Arabia)

    * Management Contract for the whole city of Riyadh: 5 million inhabitants, 380,000 water connections, 12,000 km of water network, a production of 660 million m3 (half managed by RCBU from deep wells and half from a desalination plant managed by the Saline Water Conversion Corporation (SWCC)), 41% continuity of service, 130,000 waste water connections, 234 million m3 of waste water collected per year, 7,000 km of waste water separate system.
    * Technical Director responsible for performance measurement, quality and health & safety within the Riyadh City Business Unit (RCBU).
    * Establishment of the department, selection of staff and creation of the measurements and reporting,
    * Design and implementation of data capture processes to meet the requirements of the Production of Base Year Data Report (benchmarks for KPIs and performance standards)
    * Responsible for the creation and operation of RCBU's documentation management system
    * Responsible for the review, reorganisation and implementation of RCBU procedures
    * Management of short-term expatriate technical expert input, especially for Health and Safety
    * Establishment and maintenance of relations with the independent auditor and the National Water Company (NWC). ;
  • VEOLIA WATER - TECHNICAL DIRECTOR

    Paris 2008 - 2009 VEOLIA WATER INDIA (Veolia Water subsidiary in India)

    * Technical supervision of on-going projects (Studies, DBO and O&M).
    * Technical follow-up and management of O&M projects for water treatment plants (120,000 to 136,000 m3/d) with innovative 24x7 distribution networks in India (15,000 connections per zone). Development and training for GIS, Modelling and Public awareness.
    * Involvement in major proposal preparations: Sea water desalination, water treatment plants and network rehabilitations.
    * Management of the customer services development (public awareness, customer care centre, GIS interconnected to the billing system) ;
  • VEOLIA WATER - TECHNICAL DIRECTOR

    Paris 2008 - 2009 VEOLIA WATER INDIA (Veolia Water subsidiary in India)

    * Technical supervision of on-going projects (Studies, DBO and O&M).
    * Technical follow-up and management of O&M projects for water treatment plants (120,000 to 136,000 m3/d) with innovative 24x7 distribution networks in India (15,000 connections per zone). Development and training for GIS, Modelling and Public awareness.
    * Involvement in major proposal preparations: Sea water desalination, water treatment plants and network rehabilitations.
    * Management of the customer services development (public awareness, customer care centre, GIS interconnected to the billing system) ;
  • VEOLIA WATER - TECHNICAL DIRECTOR

    Paris 2008 - 2009 VEOLIA WATER INDIA (Veolia Water subsidiary in India)

    * Technical supervision of on-going projects (Studies, DBO and O&M).
    * Technical follow-up and management of O&M projects for water treatment plants (120,000 to 136,000 m3/d) with innovative 24x7 distribution networks in India (15,000 connections per zone). Development and training for GIS, Modelling and Public awareness.
    * Involvement in major proposal preparations: Sea water desalination, water treatment plants and network rehabilitations.
    * Management of the customer services development (public awareness, customer care centre, GIS interconnected to the billing system) ;
  • SEURECA - PROJECT MANAGER

    2004 - 2004 * Preparation of proposals for activity development of the representation in the sub-region.
    * Feasibility study of the water supply system rehabilitation project in Maputo (Mozambique).
    * Consultancy services for the preparatory studies of Kisumu water and sanitation project (Kenya) ;
  • SEURECA - PROJECT MANAGER

    2004 - 2004 * Preparation of proposals for activity development of the representation in the sub-region.
    * Feasibility study of the water supply system rehabilitation project in Maputo (Mozambique).
    * Consultancy services for the preparatory studies of Kisumu water and sanitation project (Kenya) ;
  • SEURECA GABON - REGIONAL DIRECTOR

    2004 - 2008 Regional Manager for Seureca based in Gabon and technical assistant to the Energy and Water Company of Gabon (SEEG).
    * Activity development of the new subsidiary (Seureca Af) in the fields of water, sanitation and electricity. 1,9 M EUR of turnover.
    * Management of the local personnel (3 expatriates and 5 Gabonese), support to the expertise missions from SEURECA and the group (Technical services of Veolia, Amendis), coordination and follow-up of studies (feasibilities, pre and detailed designs, Bidding documents), work supervision and network modelling.
    * Preparation of technical and financial proposals for the development of the activity of the subsidiary in Gabon and the sub-region, in the fields of water, wastewater, environment and electricity.
    * Technical assistance to the SEEG engineers regarding the on-going studies in the whole Country within the framework of the Veolia concession contract (over 40 operation centres including Libreville the capital of Gabon). ;
  • SEURECA - PROJECT MANAGER

    2004 - 2004 * Preparation of proposals for activity development of the representation in the sub-region.
    * Feasibility study of the water supply system rehabilitation project in Maputo (Mozambique).
    * Consultancy services for the preparatory studies of Kisumu water and sanitation project (Kenya) ;
  • SEURECA GABON - REGIONAL DIRECTOR

    2004 - 2008 Regional Manager for Seureca based in Gabon and technical assistant to the Energy and Water Company of Gabon (SEEG).
    * Activity development of the new subsidiary (Seureca Af) in the fields of water, sanitation and electricity. 1,9 M EUR of turnover.
    * Management of the local personnel (3 expatriates and 5 Gabonese), support to the expertise missions from SEURECA and the group (Technical services of Veolia, Amendis), coordination and follow-up of studies (feasibilities, pre and detailed designs, Bidding documents), work supervision and network modelling.
    * Preparation of technical and financial proposals for the development of the activity of the subsidiary in Gabon and the sub-region, in the fields of water, wastewater, environment and electricity.
    * Technical assistance to the SEEG engineers regarding the on-going studies in the whole Country within the framework of the Veolia concession contract (over 40 operation centres including Libreville the capital of Gabon). ;
  • SEURECA GABON - REGIONAL DIRECTOR

    2004 - 2008 Regional Manager for Seureca based in Gabon and technical assistant to the Energy and Water Company of Gabon (SEEG).
    * Activity development of the new subsidiary (Seureca Af) in the fields of water, sanitation and electricity. 1,9 M EUR of turnover.
    * Management of the local personnel (3 expatriates and 5 Gabonese), support to the expertise missions from SEURECA and the group (Technical services of Veolia, Amendis), coordination and follow-up of studies (feasibilities, pre and detailed designs, Bidding documents), work supervision and network modelling.
    * Preparation of technical and financial proposals for the development of the activity of the subsidiary in Gabon and the sub-region, in the fields of water, wastewater, environment and electricity.
    * Technical assistance to the SEEG engineers regarding the on-going studies in the whole Country within the framework of the Veolia concession contract (over 40 operation centres including Libreville the capital of Gabon). ;
  • SEURECA - PROJECT MANAGER

    2003 - 2003 North Contracting Office in Iraq

    * Master Plan and Design of Sewerage Networks and Treatment Plants for the Cities of Dahuk, Erbil and Sulaymaniyah in Kurdistan. CPA (Coalition Provisional Authority) financing.
    Management in coordination with the Master Plan team of the detailed designs and preparation of the bid documents of the network and treatment works.
    Present populations: Dahuk: 250,000, Erbil: 670,000, Sulaymaniyah: 590,000.
    Works to be carried out:
    * 73 km of box culvert trunk sewers to be newly constructed
    * 764 km of combined system sewers to be newly constructed;
    * 3 new wastewater treatment plants to be constructed:
    * Dry Weather peak Flows: 3,781 + 9,295 + 8,960 m3/h ;
    * Population equivalents: 325,000 + 800,000 + 770,000 ;
    * 1 wastewater treatment plant to be rehabilitated: 260,000 equiv. population. ;
  • SEURECA - PROJECT MANAGER

    2003 - 2003 North Contracting Office in Iraq

    * Master Plan and Design of Sewerage Networks and Treatment Plants for the Cities of Dahuk, Erbil and Sulaymaniyah in Kurdistan. CPA (Coalition Provisional Authority) financing.
    Management in coordination with the Master Plan team of the detailed designs and preparation of the bid documents of the network and treatment works.
    Present populations: Dahuk: 250,000, Erbil: 670,000, Sulaymaniyah: 590,000.
    Works to be carried out:
    * 73 km of box culvert trunk sewers to be newly constructed
    * 764 km of combined system sewers to be newly constructed;
    * 3 new wastewater treatment plants to be constructed:
    * Dry Weather peak Flows: 3,781 + 9,295 + 8,960 m3/h ;
    * Population equivalents: 325,000 + 800,000 + 770,000 ;
    * 1 wastewater treatment plant to be rehabilitated: 260,000 equiv. population. ;
  • SEURECA - PROJECT MANAGER

    2003 - 2003 North Contracting Office in Iraq

    * Master Plan and Design of Sewerage Networks and Treatment Plants for the Cities of Dahuk, Erbil and Sulaymaniyah in Kurdistan. CPA (Coalition Provisional Authority) financing.
    Management in coordination with the Master Plan team of the detailed designs and preparation of the bid documents of the network and treatment works.
    Present populations: Dahuk: 250,000, Erbil: 670,000, Sulaymaniyah: 590,000.
    Works to be carried out:
    * 73 km of box culvert trunk sewers to be newly constructed
    * 764 km of combined system sewers to be newly constructed;
    * 3 new wastewater treatment plants to be constructed:
    * Dry Weather peak Flows: 3,781 + 9,295 + 8,960 m3/h ;
    * Population equivalents: 325,000 + 800,000 + 770,000 ;
    * 1 wastewater treatment plant to be rehabilitated: 260,000 equiv. population. ;
  • SEURECA - PROJECT MANAGER

    2002 - 2003 ETHIOPIA for SEURECA: Addis Ababa Water supply project stage IIIA, groundwater phase II. (Veolia Subsidiary)
    AAWSA (Addis Ababa Water and Sewerage Authority, AFD financing.
    * Borehole drilling supervision, Environmental Impact Assessment, detailed design and preparation of the tender documents of the following components:
    40 km of main lines;
    Three storage reservoirs (500, 2,000 and 10,000 m3);
    Electromechanical equipment of 19 boreholes;
    Upgrade and extension of the telemetry system.
  • SEURECA - PROJECT MANAGER

    2002 - 2003 ETHIOPIA for SEURECA: Addis Ababa Water supply project stage IIIA, groundwater phase II. (Veolia Subsidiary)
    AAWSA (Addis Ababa Water and Sewerage Authority, AFD financing.
    * Borehole drilling supervision, Environmental Impact Assessment, detailed design and preparation of the tender documents of the following components:
    40 km of main lines;
    Three storage reservoirs (500, 2,000 and 10,000 m3);
    Electromechanical equipment of 19 boreholes;
    Upgrade and extension of the telemetry system.
  • WATER SUPPLY - EXPERT

    2002 - 2002 PUERTO RICO for Ondeo, (Lyonnaise des eaux subsidiary of Suez Group)

    * Revision of the Design Criteria for the water supply system of the whole island of Puerto Rico. ;
  • WATER SUPPLY - EXPERT

    2002 - 2002 PUERTO RICO for Ondeo, (Lyonnaise des eaux subsidiary of Suez Group)

    * Revision of the Design Criteria for the water supply system of the whole island of Puerto Rico. ;
  • WATER SUPPLY - EXPERT

    2002 - 2002 PUERTO RICO for Ondeo, (Lyonnaise des eaux subsidiary of Suez Group)

    * Revision of the Design Criteria for the water supply system of the whole island of Puerto Rico. ;
  • SEURECA - PROJECT MANAGER

    2002 - 2003 ETHIOPIA for SEURECA: Addis Ababa Water supply project stage IIIA, groundwater phase II. (Veolia Subsidiary)
    AAWSA (Addis Ababa Water and Sewerage Authority, AFD financing.
    * Borehole drilling supervision, Environmental Impact Assessment, detailed design and preparation of the tender documents of the following components:
    40 km of main lines;
    Three storage reservoirs (500, 2,000 and 10,000 m3);
    Electromechanical equipment of 19 boreholes;
    Upgrade and extension of the telemetry system.
  • ONDEO - DEPUTY HEAD

    2001 - 2001 * Follow-up and management of projects abroad in the Africa and Indian Ocean zone. ;
  • the Agence française de Développement - WATER AND ELECTRICITY ENGINEER

    2001 - 2002 CENTRAL AND AUSTRAL AFRICA for the Agence française de Développement (AfD) (Financial agency, management of the French funds).
    Analysis of operational and investment costs, funding, tariff affordability liked with consumption forecasts. Economic, financial, institutional and legal management of twenty conventions with the foreign States in Easter, Central and Austral Africa.
  • ONDEO - DEPUTY HEAD

    2001 - 2001 * Follow-up and management of projects abroad in the Africa and Indian Ocean zone. ;
  • the Agence française de Développement - WATER AND ELECTRICITY ENGINEER

    2001 - 2002 CENTRAL AND AUSTRAL AFRICA for the Agence française de Développement (AfD) (Financial agency, management of the French funds).
    Analysis of operational and investment costs, funding, tariff affordability liked with consumption forecasts. Economic, financial, institutional and legal management of twenty conventions with the foreign States in Easter, Central and Austral Africa.
  • ONDEO - DEPUTY HEAD

    2001 - 2001 * Follow-up and management of projects abroad in the Africa and Indian Ocean zone. ;
  • the Agence française de Développement - WATER AND ELECTRICITY ENGINEER

    2001 - 2002 CENTRAL AND AUSTRAL AFRICA for the Agence française de Développement (AfD) (Financial agency, management of the French funds).
    Analysis of operational and investment costs, funding, tariff affordability liked with consumption forecasts. Economic, financial, institutional and legal management of twenty conventions with the foreign States in Easter, Central and Austral Africa.
  • SAFEGE - RESIDENT PROJECT MANAGER

    Nanterre 1999 - 2001 RESIDENT PROJECT MANAGER FOR URUGUAY for Safege, Client: OSE (Obras Sanitarias del Estado).
    Inter American Development Bank financing.
    MONTEVIDEO Integrated water and Sewerage master plan.

    * Master Plan and preliminary design of the future investments (770 000 m3/day for a population of 2.5 million).

    2000 PROJECT MANAGER
    SENEGAL for Safege (Suez Group), Client : SONES (Société Nationale des Eaux du Sénégal). Local financing.

    * Investment Plan the Urban Water Supply in Senegal ;
    * Determination of the long-term investment Plan for the National Water Authority (SONES), owner of 57 water-supply systems.
    * Estimation of the actualised costs for each centre and programming of investments. ;
  • SAFEGE - RESIDENT PROJECT MANAGER

    Nanterre 1999 - 2001 RESIDENT PROJECT MANAGER FOR URUGUAY for Safege, Client: OSE (Obras Sanitarias del Estado).
    Inter American Development Bank financing.
    MONTEVIDEO Integrated water and Sewerage master plan.

    * Master Plan and preliminary design of the future investments (770 000 m3/day for a population of 2.5 million).

    2000 PROJECT MANAGER
    SENEGAL for Safege (Suez Group), Client : SONES (Société Nationale des Eaux du Sénégal). Local financing.

    * Investment Plan the Urban Water Supply in Senegal ;
    * Determination of the long-term investment Plan for the National Water Authority (SONES), owner of 57 water-supply systems.
    * Estimation of the actualised costs for each centre and programming of investments. ;
  • SAFEGE - RESIDENT PROJECT MANAGER

    Nanterre 1999 - 2001 RESIDENT PROJECT MANAGER FOR URUGUAY for Safege, Client: OSE (Obras Sanitarias del Estado).
    Inter American Development Bank financing.
    MONTEVIDEO Integrated water and Sewerage master plan.

    * Master Plan and preliminary design of the future investments (770 000 m3/day for a population of 2.5 million).

    2000 PROJECT MANAGER
    SENEGAL for Safege (Suez Group), Client : SONES (Société Nationale des Eaux du Sénégal). Local financing.

    * Investment Plan the Urban Water Supply in Senegal ;
    * Determination of the long-term investment Plan for the National Water Authority (SONES), owner of 57 water-supply systems.
    * Estimation of the actualised costs for each centre and programming of investments. ;
  • SAFEGE - RESIDENT PROJECT MANAGER

    Nanterre 1997 - 1998 SOUTH AFRICA for Safege (Suez Group): Greater EAST LONDON Integrated Sewerage Plan.
    Client: City of East London. French Government financing.

    * Feasibility study for the upgrading of sewerage networks (800 km of main sewers) for the urban area of the former CISKEI, the municipalities of BEACON BAY and GONUBIE and their integration within the scheme of EAST LONDON city. Total population of 600,000 projected to be 800,000 by 2010, 6 sewerage treatment works and 71 pumping stations from 10 l/s to 1.5 m3/s.
    * General diagnosis of the existing installations. ;
    * Population projections. ;
    * Conversion and updating of the existing GIS as well as computer modelling of the networks. ;
  • SAFEGE - RESIDENT PROJECT MANAGER

    Nanterre 1997 - 1998 SOUTH AFRICA for Safege (Suez Group): Greater EAST LONDON Integrated Sewerage Plan.
    Client: City of East London. French Government financing.

    * Feasibility study for the upgrading of sewerage networks (800 km of main sewers) for the urban area of the former CISKEI, the municipalities of BEACON BAY and GONUBIE and their integration within the scheme of EAST LONDON city. Total population of 600,000 projected to be 800,000 by 2010, 6 sewerage treatment works and 71 pumping stations from 10 l/s to 1.5 m3/s.
    * General diagnosis of the existing installations. ;
    * Population projections. ;
    * Conversion and updating of the existing GIS as well as computer modelling of the networks. ;
  • SAFEGE - RESIDENT PROJECT MANAGER

    Nanterre 1997 - 1998 SOUTH AFRICA for Safege (Suez Group): Greater EAST LONDON Integrated Sewerage Plan.
    Client: City of East London. French Government financing.

    * Feasibility study for the upgrading of sewerage networks (800 km of main sewers) for the urban area of the former CISKEI, the municipalities of BEACON BAY and GONUBIE and their integration within the scheme of EAST LONDON city. Total population of 600,000 projected to be 800,000 by 2010, 6 sewerage treatment works and 71 pumping stations from 10 l/s to 1.5 m3/s.
    * General diagnosis of the existing installations. ;
    * Population projections. ;
    * Conversion and updating of the existing GIS as well as computer modelling of the networks. ;
  • SAFEGE - RESIDENT PROJECT MANAGER

    Nanterre 1996 - 1997 MADAGASCAR for Safege (Suez Group): ANTSIRANANA Water Supply Improvement Project. World Bank financing.
    Client: Ministry of Energy and Mines.

    * Master Plan and feasibility study, detailed design and preparation of tender documents. Population 100,000.
    MADAGASCAR for Safege (Suez Group): Water Supply and Sewerage Project for eight urban centres (TULEAR - FORT DAUPHIN - NOSY BE - MANANJARY - MANJAKANDRIANA - AMBILOBE - AMBALAVAO - FIANARANTSOA). African Development Bank financing.
    Client: Ministry of Energy and Mines.

    * Feasibility and design studies for eight urban centres with populations ranging between 10,000 and 70,000.
    * Mapping and data base under RESOCAD, geographic information system.
    * Training of government engineers to some specific software and to site measurement campaigns. ;
  • SAFEGE - RESIDENT ASSISTANT PROJECT MANAGER

    Nanterre 1996 - 1996 for Safege (Suez Group): Rehabilitation and Extension Project for the Bucharest water supply and sewerage systems. World Bank Financing.
    Client: RGAB.
  • SAFEGE - RESIDENT PROJECT MANAGER

    Nanterre 1996 - 1997 MADAGASCAR for Safege (Suez Group): ANTSIRANANA Water Supply Improvement Project. World Bank financing.
    Client: Ministry of Energy and Mines.

    * Master Plan and feasibility study, detailed design and preparation of tender documents. Population 100,000.
    MADAGASCAR for Safege (Suez Group): Water Supply and Sewerage Project for eight urban centres (TULEAR - FORT DAUPHIN - NOSY BE - MANANJARY - MANJAKANDRIANA - AMBILOBE - AMBALAVAO - FIANARANTSOA). African Development Bank financing.
    Client: Ministry of Energy and Mines.

    * Feasibility and design studies for eight urban centres with populations ranging between 10,000 and 70,000.
    * Mapping and data base under RESOCAD, geographic information system.
    * Training of government engineers to some specific software and to site measurement campaigns. ;
  • SAFEGE - RESIDENT ASSISTANT PROJECT MANAGER

    Nanterre 1996 - 1996 for Safege (Suez Group): Rehabilitation and Extension Project for the Bucharest water supply and sewerage systems. World Bank Financing.
    Client: RGAB.
  • SAFEGE - RESIDENT PROJECT MANAGER

    Nanterre 1996 - 1997 MADAGASCAR for Safege (Suez Group): ANTSIRANANA Water Supply Improvement Project. World Bank financing.
    Client: Ministry of Energy and Mines.

    * Master Plan and feasibility study, detailed design and preparation of tender documents. Population 100,000.
    MADAGASCAR for Safege (Suez Group): Water Supply and Sewerage Project for eight urban centres (TULEAR - FORT DAUPHIN - NOSY BE - MANANJARY - MANJAKANDRIANA - AMBILOBE - AMBALAVAO - FIANARANTSOA). African Development Bank financing.
    Client: Ministry of Energy and Mines.

    * Feasibility and design studies for eight urban centres with populations ranging between 10,000 and 70,000.
    * Mapping and data base under RESOCAD, geographic information system.
    * Training of government engineers to some specific software and to site measurement campaigns. ;
  • SAFEGE - RESIDENT ASSISTANT PROJECT MANAGER

    Nanterre 1996 - 1996 for Safege (Suez Group): Rehabilitation and Extension Project for the Bucharest water supply and sewerage systems. World Bank Financing.
    Client: RGAB.
  • SAFEGE - Resident Assistant Project Manager

    Nanterre 1995 - 2000 for the Water Supply and Sewerage Master Plan studies and technical and economic feasibility studies for the various project options (
    * Secondary water network computer modelling for seven zones within the city of BUCHAREST.
    * Training of three engineers of the RGAB to this modelling phase.
    * Writing of tender documents for emergency works. ;
  • SAFEGE - Resident Assistant Project Manager

    Nanterre 1995 - 2000 for the Water Supply and Sewerage Master Plan studies and technical and economic feasibility studies for the various project options (
    * Secondary water network computer modelling for seven zones within the city of BUCHAREST.
    * Training of three engineers of the RGAB to this modelling phase.
    * Writing of tender documents for emergency works. ;
  • SAFEGE - Resident Assistant Project Manager

    Nanterre 1995 - 2000 for the Water Supply and Sewerage Master Plan studies and technical and economic feasibility studies for the various project options (
    * Secondary water network computer modelling for seven zones within the city of BUCHAREST.
    * Training of three engineers of the RGAB to this modelling phase.
    * Writing of tender documents for emergency works. ;
  • SAFEGE - RESIDENT ASSISTANT PROJECT MANAGER

    Nanterre 1994 - 1995 MOROCCO for Safege (Suez Group): Updating of the Water Distribution Master Plan for RABAT-SALÉ and creation of the associated project team. IDRB financing.
    Client: Régie des Eaux et de distribution de Rabat (R.E.D.).

    Resident Project Manager: Requirements and demand analysis (population 1.1 million).
    * Network modelling with the PICCOLO software package. ;
    * Analysis and economic optimisation of the various options. ;
    * Updating of Master Plan.
    * Training of R.E.D. sta. ;
  • SAFEGE - RESIDENT ASSISTANT PROJECT MANAGER

    Nanterre 1994 - 1995 MOROCCO for Safege (Suez Group): Updating of the Water Distribution Master Plan for RABAT-SALÉ and creation of the associated project team. IDRB financing.
    Client: Régie des Eaux et de distribution de Rabat (R.E.D.).

    Resident Project Manager: Requirements and demand analysis (population 1.1 million).
    * Network modelling with the PICCOLO software package. ;
    * Analysis and economic optimisation of the various options. ;
    * Updating of Master Plan.
    * Training of R.E.D. sta. ;
  • SAFEGE - RESIDENT ASSISTANT PROJECT MANAGER

    Nanterre 1994 - 1995 MOROCCO for Safege (Suez Group): Updating of the Water Distribution Master Plan for RABAT-SALÉ and creation of the associated project team. IDRB financing.
    Client: Régie des Eaux et de distribution de Rabat (R.E.D.).

    Resident Project Manager: Requirements and demand analysis (population 1.1 million).
    * Network modelling with the PICCOLO software package. ;
    * Analysis and economic optimisation of the various options. ;
    * Updating of Master Plan.
    * Training of R.E.D. sta. ;
  • SAFEGE - SENIOR SPECIALIST

    Nanterre 1993 - 1993 * Responsible for the re-routing of the water supply network further to road construction works.
    Normal supply service was maintained throughout the excavation works, which involved the use of dynamite.
  • SAFEGE - SENIOR SPECIALIST

    Nanterre 1993 - 1993 * Responsible for the re-routing of the water supply network further to road construction works.
    Normal supply service was maintained throughout the excavation works, which involved the use of dynamite.
  • SAFEGE - SENIOR SPECIALIST

    Nanterre 1993 - 1993 * Responsible for the re-routing of the water supply network further to road construction works.
    Normal supply service was maintained throughout the excavation works, which involved the use of dynamite.
  • Water Supply - PROJECT MANAGER

    1992 - 1993 IVORY COAST for BCEOM: Water Supply Master Plan for the town of Man (population 100,000) in view of an estimated two-fold population increase by the year 2004.
    * Responsible for the study and relations with the Client (Water Division and DCGTx):
    Water demand and urban development.
    Existing supply sources and new supply sources
    Distribution and storage - computer modelling.
    Impact study.
    Evaluation of investment and operating costs.
  • Water Supply - PROJECT MANAGER

    1992 - 1993 IVORY COAST for BCEOM: Water Supply Master Plan for the town of Man (population 100,000) in view of an estimated two-fold population increase by the year 2004.
    * Responsible for the study and relations with the Client (Water Division and DCGTx):
    Water demand and urban development.
    Existing supply sources and new supply sources
    Distribution and storage - computer modelling.
    Impact study.
    Evaluation of investment and operating costs.
  • Water Supply - PROJECT MANAGER

    1992 - 1993 IVORY COAST for BCEOM: Water Supply Master Plan for the town of Man (population 100,000) in view of an estimated two-fold population increase by the year 2004.
    * Responsible for the study and relations with the Client (Water Division and DCGTx):
    Water demand and urban development.
    Existing supply sources and new supply sources
    Distribution and storage - computer modelling.
    Impact study.
    Evaluation of investment and operating costs.
  • BCEOM - PROJECT MANAGER

    1990 - 1991 SAINT LUCIA for BCEOM: Feasibility for the Gros Islet and Castries sewerage systems.
    Preliminary design and preparation of tender documents (population equivalent 40,000 for each of the two communities). Total estimated population equivalent of 110,000 by the year 2015.
    * Responsible for the following aspects:
    Urban and socio-economic analysis.
    Determination of design standards and criteria compatible with tourist activities.
    Study of options and detailed design for solution retained.
    Preparation of tender documents.
    Assistance to the Client for bid evaluation and supervision of construction.

    1992 PROJECT MANAGER
    FRANCE for BCEOM: Water Supply Master Plan for the LOIRE ATLANTIQUE Region up to the year 2005 (population 1,200,000).
    * Responsible for the following aspects:
    Demand analysis and forecast.
    Study of water resources development options.
    Design and model building criteria with regard to the network "skeleton".
    Formulation of a planning strategy.
    Evaluation of capital expenditure requirements.
    FRANCE for BCEOM: Operation "Zero Pollution" for the MARNE River.
    * Inventory of effluents in the MARNE river and creation of a database with links to a Geographical Information System with a view to the elaboration of a Master Plan for the development of the MARNE river basin between MEAUX and PARIS (area concerned 1,900 km2, population 1,200,000). ;
  • BCEOM - PROJECT MANAGER

    1990 - 1991 SAINT LUCIA for BCEOM: Feasibility for the Gros Islet and Castries sewerage systems.
    Preliminary design and preparation of tender documents (population equivalent 40,000 for each of the two communities). Total estimated population equivalent of 110,000 by the year 2015.
    * Responsible for the following aspects:
    Urban and socio-economic analysis.
    Determination of design standards and criteria compatible with tourist activities.
    Study of options and detailed design for solution retained.
    Preparation of tender documents.
    Assistance to the Client for bid evaluation and supervision of construction.

    1992 PROJECT MANAGER
    FRANCE for BCEOM: Water Supply Master Plan for the LOIRE ATLANTIQUE Region up to the year 2005 (population 1,200,000).
    * Responsible for the following aspects:
    Demand analysis and forecast.
    Study of water resources development options.
    Design and model building criteria with regard to the network "skeleton".
    Formulation of a planning strategy.
    Evaluation of capital expenditure requirements.
    FRANCE for BCEOM: Operation "Zero Pollution" for the MARNE River.
    * Inventory of effluents in the MARNE river and creation of a database with links to a Geographical Information System with a view to the elaboration of a Master Plan for the development of the MARNE river basin between MEAUX and PARIS (area concerned 1,900 km2, population 1,200,000). ;
  • Water supply and sewerage - BCEOM

    1990 - 1990 AAWSA (Addis Ababa Water and Sewerage Authority, AFD financing.
    * Back office to the preliminary study for the year 2005 for an estimated population of 500,000. Tender documents for 1st phase sewerage works (effluent treatment by lagoon techniques). ;
    * Other functions: Head of computer-related aspects in the Regional and Urban Division of BCEOM: management of water-related software and specialist experience in modelling of water supply and sewerage systems ;
  • BCEOM - PROJECT MANAGER

    1990 - 1991 SAINT LUCIA for BCEOM: Feasibility for the Gros Islet and Castries sewerage systems.
    Preliminary design and preparation of tender documents (population equivalent 40,000 for each of the two communities). Total estimated population equivalent of 110,000 by the year 2015.
    * Responsible for the following aspects:
    Urban and socio-economic analysis.
    Determination of design standards and criteria compatible with tourist activities.
    Study of options and detailed design for solution retained.
    Preparation of tender documents.
    Assistance to the Client for bid evaluation and supervision of construction.

    1992 PROJECT MANAGER
    FRANCE for BCEOM: Water Supply Master Plan for the LOIRE ATLANTIQUE Region up to the year 2005 (population 1,200,000).
    * Responsible for the following aspects:
    Demand analysis and forecast.
    Study of water resources development options.
    Design and model building criteria with regard to the network "skeleton".
    Formulation of a planning strategy.
    Evaluation of capital expenditure requirements.
    FRANCE for BCEOM: Operation "Zero Pollution" for the MARNE River.
    * Inventory of effluents in the MARNE river and creation of a database with links to a Geographical Information System with a view to the elaboration of a Master Plan for the development of the MARNE river basin between MEAUX and PARIS (area concerned 1,900 km2, population 1,200,000). ;
  • Water supply and sewerage - BCEOM

    1990 - 1990 AAWSA (Addis Ababa Water and Sewerage Authority, AFD financing.
    * Back office to the preliminary study for the year 2005 for an estimated population of 500,000. Tender documents for 1st phase sewerage works (effluent treatment by lagoon techniques). ;
    * Other functions: Head of computer-related aspects in the Regional and Urban Division of BCEOM: management of water-related software and specialist experience in modelling of water supply and sewerage systems ;
  • Water supply and sewerage - BCEOM

    1990 - 1990 AAWSA (Addis Ababa Water and Sewerage Authority, AFD financing.
    * Back office to the preliminary study for the year 2005 for an estimated population of 500,000. Tender documents for 1st phase sewerage works (effluent treatment by lagoon techniques). ;
    * Other functions: Head of computer-related aspects in the Regional and Urban Division of BCEOM: management of water-related software and specialist experience in modelling of water supply and sewerage systems ;
  • Association Française des Volontaires du Progrès -  REGIONAL DEPUTY DIRECTOR FOR RURAL HYDRAULICS & DEVELOPMENT

    1986 - 1990 REGIONAL DEPUTY DIRECTOR FOR RURAL HYDRAULICS & DEVELOPMENT BURKINA FASO for Association Française des Volontaires du Progrès (NGO): Studies and supervision of projects throughout the country.
    Management of 70 agreements with 25 funding partners
    Definition of field policies:
    - Feasibility studies, monitoring, evaluation, planning and negotiating projects with political partners, technical and financial, management and coordination of human and financial resources:
    * 40 expatriate technicians,
    * 70 agreements with 25 financial partners
    * 1,200,000 EUR annual budget.
    * 42 (earth and gabion) storage dams.
    * Installation of 27 standpipes.
    * Construction and fitting-out of 35 wells. ;
    * Soil restoration covering an area of 1,000 hectares. ;
  • Association Française des Volontaires du Progrès -  REGIONAL DEPUTY DIRECTOR FOR RURAL HYDRAULICS & DEVELOPMENT

    1986 - 1990 REGIONAL DEPUTY DIRECTOR FOR RURAL HYDRAULICS & DEVELOPMENT BURKINA FASO for Association Française des Volontaires du Progrès (NGO): Studies and supervision of projects throughout the country.
    Management of 70 agreements with 25 funding partners
    Definition of field policies:
    - Feasibility studies, monitoring, evaluation, planning and negotiating projects with political partners, technical and financial, management and coordination of human and financial resources:
    * 40 expatriate technicians,
    * 70 agreements with 25 financial partners
    * 1,200,000 EUR annual budget.
    * 42 (earth and gabion) storage dams.
    * Installation of 27 standpipes.
    * Construction and fitting-out of 35 wells. ;
    * Soil restoration covering an area of 1,000 hectares. ;
  • Association Française des Volontaires du Progrès -  REGIONAL DEPUTY DIRECTOR FOR RURAL HYDRAULICS & DEVELOPMENT

    1986 - 1990 REGIONAL DEPUTY DIRECTOR FOR RURAL HYDRAULICS & DEVELOPMENT BURKINA FASO for Association Française des Volontaires du Progrès (NGO): Studies and supervision of projects throughout the country.
    Management of 70 agreements with 25 funding partners
    Definition of field policies:
    - Feasibility studies, monitoring, evaluation, planning and negotiating projects with political partners, technical and financial, management and coordination of human and financial resources:
    * 40 expatriate technicians,
    * 70 agreements with 25 financial partners
    * 1,200,000 EUR annual budget.
    * 42 (earth and gabion) storage dams.
    * Installation of 27 standpipes.
    * Construction and fitting-out of 35 wells. ;
    * Soil restoration covering an area of 1,000 hectares. ;
  • the Association Française des Volontaires du Progrès - PROJECT MANAGER

    1984 - 1986 : Studies and supervision of projects throughout the country.
    * Feasibility study and on-site tests for drainage of coastal areas and gravity-fed irrigation system study. ;
  • the Association Française des Volontaires du Progrès - PROJECT MANAGER

    1984 - 1986 : Studies and supervision of projects throughout the country.
    * Feasibility study and on-site tests for drainage of coastal areas and gravity-fed irrigation system study. ;
  • the Association Française des Volontaires du Progrès - PROJECT MANAGER

    1984 - 1986 : Studies and supervision of projects throughout the country.
    * Feasibility study and on-site tests for drainage of coastal areas and gravity-fed irrigation system study. ;

Formations

  • Birmingham University (Birmingham)

    Birmingham 1982 - 1983 Master of Science

    (Urban Hydraulics, Hydrology, Water and Waste water Treatment),
  • Birmingham University (Birmingham)

    Birmingham 1982 - 1983 Master of Science

    (Urban Hydraulics, Hydrology, Water and Waste water Treatment),
  • Birmingham University (Birmingham)

    Birmingham 1982 - 1983 Master of Science

    (Urban Hydraulics, Hydrology, Water and Waste water Treatment),
  • Ecole Spéciale Des Travaux Publics ESTP

    Paris 1980 - 1982 Master of Science
  • Ecole Spéciale Des Travaux Publics ESTP

    Paris 1980 - 1982 Master of Science
  • Ecole Spéciale Des Travaux Publics ESTP

    Paris 1980 - 1982 Master of Science