Pierre-Camille ESTHER

RIO DE JANEIRO

En résumé

Mes compétences :
Brésil
Planning
Primavera
Gestão de Projetos
Project Management

Entreprises

  • Wood Group - Business Development - Clean Energy

    2017 - maintenant
  • Wood Group - Project Manager

    2016 - 2016 ENAP, Subsea installation engineering project - $2 million – Offshore Argentina.
    • Manage engineering team (20 engineers) and relation with client.
    • Develop and implement planning process, change management and reporting procedures.
  • Rio2016 Olympic Committee - Project Controls Manager - PMO

    2016 - 2016 Vendor selection and contracting for the fabrication and installation of Visual Communication.
    Managing schedule, contract and interface during all installation period.
    In charge of intervention team during all Olympic competitions (7/7, 24/24).
  • BG Group - Project Controls Manager

    2011 - 2015 Barreirinhas project (10 offshore blocks in Equatorial Margin).
    - In charge of risks management, cost control, document control and project reporting.
    - Manage schedule for exploration, environmental licensing, procurement and construction activities.
    - Responsible to develop and analyse project execution scenarios.
    - Manage interfaces with partners and contractors
    Gas/Oil export Portfolio (Santos Basin):
    - In charge of risks management, document control and project reporting.
    - Manage schedule for all oil export projects (Tankers fabrication, Oil export terminal construction,
    Remora Hi-Load contracting) and Portfolio decision plan.
  • Technip Brasil - Projet Planning Manager

    Paris 2008 - 2011 Responsible for the Subsea planning department:
    - Group scheduling processes and procedures implementation, staff training and mentoring.
    - Supervise engineering, procurement, construction and offshore schedule for all Lump Sum projects and tenders in Brazil.
  • Technip - Lead Project Planning

    Paris 2006 - 2008 CHEVRON, Agbami Project. $800 million, offshore Nigeria.
    - Review and supervise engineering, procurement and offshore schedule.
    - Offshore rotations on board installation vessels in Nigeria (Deep Pioneer, Normand Pioneer).
    TOTAL E&P, Pazflor Surf Proposal. $1 billion (TP share), offshore Angola.
    - In charge of Project Controls and qualifications for proposal.
    - Manage interfaces with client and partners.
  • Saipem - Project Controls Engineer

    Montigny-le-Bretonneux 2002 - 2005 FLUXYS/TRACTEBEL, Zeebrugge Extension LNG Terminal. $140 million, Belgium:
    - Develop construction level 3 schedule, coordinate engineering and procurement to support construction.
    - In charge of reporting, invoicing, change order preparation

    EXXONMOBIL, Yoho 2 Project. $450 million, offshore Nigeria
    - Responsible for the integration and consolidation of schedules from engineering (UK, Paris), procurement (Paris, Italy) and construction sites (Malaysia, Nigeria, USA).
    - In charge of reporting and change order preparation.
  • Total - Logistics Coordinator

    COURBEVOIE 1998 - 2001 - Responsible for the distribution of lubricant products in Brazil.
    - Implement supply-chain process with main local suppliers.
    - Organize stock control for finished products and raw materials.

Formations

  • Cranfield University (Bedford)

    Bedford 1997 - 1998 MSc in Engineering and Management of Manufacturing Systems
  • Université Technologique De Compiègne UTC (Compiegne)

    Compiegne 1992 - 1997 Ingénieur Méchanique
  • Université Compiègne

    Compiegne 1992 - 1997