MTR/I - MTU Turbomeca Rolls-Royce ITP GmbH (Munich - Germany)
- Customer Support Engineer
2012 - 2014Customer Support and Technical engineer on the military MTR 390 engine of the Tiger helicopter.
This is a French Program for international cooperation (VIE).
* Manage the relationship between MTR/I and the Armies: European (France, Germany, Spain) and Australian Aerospace
* Provide Support to the European Armies and Autralian Aerospace for the MTR390 2C (with the TLS contract)
* Manage the partners companies with the Technical Event Form Process and the associated contractual timeframe
* Manage and Coordinate the Customer Support - Engineering interface
* Manage the Development of the Cost of Ownership Project
Messier-Bugatti-Dowty
- Commodity Buyer
Vélizy-Villacoublay2012 - 2012Commodity buyer on Bearings for the A320 family:
* Sourcing new suppliers
* Prepare the work package with all the technical specifications
* Writing the contract and NDA
* Launch the RFQ
* Select the supplier(s)
* NegotiationCost Reduction on Actuators Bearings A320 family
Messier-Bugatti-Dowty (UK)
- Project Engineer
2011 - 2011A330/A340 Main Landing Gear:
*Handle the corrosion issues on hydraulic hoses, after retraction problems. A new material had been used. The specifications have been updated and forwarded to the purchase department for a RFQ.
* New paint development (which changes colors when a force is applied on it) in order to adapt it for landing gears. A planning had been set and done. The results published, i participated to the negotiation with the suppliers to pursue the development.
* Updating a test plan on the main landing gear. After maneuvers, during breaking, made by pilots, the gear was not designed for, some tests have been planned and added on the current schedule. This was to make sure that the maneuvers do not impact on the gear's life limit.
* Re-design the retraction actuator cover. After fatigue problems discovered by the customer services, the cover had been re-designed and re-tested before using again.
*Maintenance project with the customer services. It concerns the interchangeability between the different version of the A330/340 main landing gear in order to reduce maintenance costs. I created a "Work Package Specification" on the main fitting and sent it to India. I closely worked with the Indian engineers to complete the task. The communication was an essential element to finish the work with success.
Brasserie Flo (Paris)
- Waiter
2010 - 2011* Waiter and barman in the restaurant Brasserie Flo
* Work in a very stressful atmosphere (especially the Week-end)
* Always satisfy the customers
Poclain Hydraulics (Chicago)
- Work on the Shopfloor, Quality, Design
2009 - 2009*Work on the shop floor building hydraulics motors
*Design a new cylinder cover on Pro-E
*Machine the cover and improve the performance of fatigue limits
*Improvement of the production line to satisfy the new quality requirements
Formations
Linköping Universitet (Linköping)
Linköping2010 - 2010Bachelor, Aerospace, Aeronautical and Astronautical Engineering
ESTACA, Paris (a 5-year programme in Aeronautical, Aerospace, Automobile andRailway Engineering). Graduated engineer with a major in aeronautics and a specialization in fleet maintenance and airline regulations.