Menu

Samir BOULEKHSSAIM

SKIKDA

En résumé

MAITRISE LOGICIEL DE GESTION DES PROJETS, PRIMAVERA 6.2

ESPRIT DE TRAVAIL COLLECTIF


SENS DE RESPONSABILITE

Mes compétences :
develop the planning
Develop the various plans
integrated planning
Master Scheduling
Auto CAD. self training
Initiation projects management
Power Stations
Microsoft Project
Primavera P3
Microsoft Excel
Microsoft PowerPoint
Microsoft Word

Entreprises

  • GB Groupement Berkine - Shutdown Principal Planning Engineer

    2017 - maintenant EL-MERK CPF
    Shutdown Principal Planning Engineer
    - To develop the planning of the turnaround. ;
    - Provides the planning and field resources to execute the plan. Develop the various plans
    (Inspection, MOC's (engineering), Tie-ins and Maintenance)
    - Preparing the initial plan (Level 0). ;
    - To participate at different coordination meetings for integrated planning.
    - Developing final plan including the General consolidated plan and initial planning.
    - Developing and updating individual discipline plans on daily basis.
    - Tracking plans and daily update of global plan. ;
    - Reported progress to Management (% of realized and planned tasks).
    - Working with the exploitation team to define the equipment affected by the shutdown.
    -Working with the shutdown team for the preparation of the work packs and the shutdown Material
    tracking
    - Preparing the analysis report of the maintenance Support contract Status, expiry dates, on-going &
    future contracts, reporting any possible contracts risks (expiry, increasing Value )

    Page 1 of 4
  • JVGAS (BP/STATOIL/SONATRACH) - TAR Planner

    2015 - 2017 JVGAS (BP/STATOIL/SONATRACH)-
    INAMINAS CPF TIGUENTOURINE
    TAR Planner
    - To develop the planning of the turnaround. ;
    - Provides the planning and field resources to execute the plan. Develop the various plans
    (Inspection, MOC's (engineering), Tie-ins and Maintenance)
    - Preparing the initial plan (Level 0). ;
    - To participate at different coordination meetings for integrated planning.
    - Developing final plan including the General consolidated plan and initial planning.
    - Developing and updating individual discipline plans on daily basis.
    - Tracking plans and daily update of global plan. ;
    - Reported progress to Management (% of realized and planned tasks).
  • ETTERKIB - Project Control Manager

    MEAUX 2014 - 2015
  • ETTERKIB SPA Company - Project Control Manger

    2014 - 2015 To prepare baseline schedule.
    - To prepare master, Level 3 & level 4th schedule. ;
    - To prepare resource histogram of project staff, manpower and plant & equipment.
    - To Prepare latest forecast plan as per latest forecast quantity.
    - To update schedule ;
    - To prepare Weekly and monthly report ;
    - To check the monitoring for updating schedule ;
    - To generate the three weeks look ahead, One month, three month, six month look ahead with
    manpower for each.
    - To control the progress (Planned vs. Achieved: Period, Project to date)
    - To prepare analysis reports. ;
    - All works related to planning and control project.
    -Attend meetings with clients and subcontractors
  • Orascom Construction Industries - Planning Engineer

    Le Caire 2013 - 2014 Key performance analysis using KPI.
    -Update PMS (Project Measurement System).
    -To prepare baseline schedule.
    - To prepare master, Level 3 & level 4th schedule. ;
    - To prepare resource histogram of project staff, manpower and plant & equipment.
    - To Prepare latest forecast plan as per latest forecast quantity.
    - To update schedule ;
    - To prepare Weekly and monthly report ;
    - To check the monitoring for updating schedule ;
    - To generate the three weeks look ahead, One month, three month, six month look ahead with
    manpower for each.
    - To control the progress (Planned vs. Achieved : Period, Project todate)
    - To prepare analysis reports. ;
    - All works related to planning and control project.
    -Attend meetings with clients and subcontractors
  • ORASCOM CONSTRUCTION INDUSTRIAL ALGERIA OCIA - Planning engineer

    2013 - 2014
  • Orascom Construction Industries - Planning Engineer

    Le Caire 2011 - 2013 Orascom Construction Industries sub-contractors with Petrofac
    PROJECT:Central Processing Facilities (Oil & Gas Project) - El Merk - Algeria.
    Position: Planning Engineer
    -Key performance analysis using KPI.
    -Update PMS (Project Measurement System).
    -To prepare baseline schedule.
    - To prepare master, Level 3 & level 4th schedule. ;
    - To prepare resource histogram of project staff, manpower and plant & equipment.
    - To Prepare latest forecast plan as per latest forecast quantity.
    - To update schedule ;
    - To prepare Weekly and monthly report ;
    - To check the monitoring for updating schedule ;
    - To generate the three weeks look ahead, One month, three month, six month look ahead with
    manpower for each.
    - To control the progress (Planned vs. Achieved: Period, Project to date)
    - To prepare analysis reports. ;
    - All works related to planning and control project.
    -Attend meetings with clients and subcontractors
  • RED SEA - Logestic engineer

    2011 - 2011 with RED SEA company sub contractor within SAMSUNG Engineering.
    - Follow-up of the P.O
    - Delivery status day per day. ;
    - Purchasing the necessary equipment & material for the project work. .
  • Orascom Construction Industrial Algeria OCIA - Planning engineer

    2011 - 2013
  • Samsung Engineering - Ingénieur loquéstique

    Séoul 2011 - 2011 - Logestic engineer with RED SEA company sub contractor within SAMSUNG Engineering.
    1-Follow-up of the P.O
    2-Delivery status day per day.
    3-Purchasing the necessary equipment & material for the project work. .

  • SOMIK -SPA - Planning engineer

    2010 - 2011 - Planning engineer with SOMIK Spa sub contractors with SAMSUNG Engineering.
    Using MSproject and PRIMAVERA PROJECT PLANNER” P3”
    1-Follow-up of the progress and the scheduling of the project.
    2-. Monitoring and recording progress day by day and ensure that the data entered into the master schedule is correct.
  • SOMIK Spa - Planning engineer

    2010 - 2011 SOMIK Spa sub contractors with SAMSUNG Engineering
    Planning engineer

    Using MSproject and PRIMAVERA PROJECT PLANNER'' P3''
    -To Follow-up of the progress and the scheduling of the project.
    -. To Monitoring and recording progress day by day and ensure that the data entered into the master
    schedule is correct.
  • COJAAL - Ingénieur maintenance

    2009 - 2010 Plant Engineer in maintenance within Japanese company COJAAL
    Japanese consortium for the Highway Algeria.
    1 - Associated machine shop chief
    2 - Follow-up the maintenance of the machines, the vehicles and the generators.
    3 - Followed the base life of Indonesian man.
    4 -Follow-up of the mechanic stock management of the workshop.
  • COJAAL - Plant Engineer

    2009 - 2010 Associated machine shop chief

    - To Follow-up the maintenance of the machines, the vehicles and the generators. ;
    - To followed the base life of Indonesian man. ;
    - To Follow-up of the mechanic stock management of the workshop.

Formations

  • Université Du 20 Aout 1955 Skikda, Algerie (Skikda)

    Skikda 2002 - 2009 Industriel maintenance engineer
  • School Mohamed Essedik Ben Yahia (Skikda)

    Skikda 1997 - 2002 Baccalaureat

Réseau

Annuaire des membres :